HomeMy WebLinkAboutCC AG PKT 2009-02-09 #GAGENDA STAFF REPORT DATE: February 9, 2009 TO: Honorable Mayor and City Council THRU: David Carmany, City Manager FROM: Vince Mastrosimone, Director of Public Works SUBJECT: APPROVAL OF SPECIFICATIONS FOR 2009 ANNUAL CONCRETE REPAIR PROGRAM PROJECT NO. ST0912 SUMMARY OF REQUEST: City Council is asked to approve specifications for the 2009 Annual Concrete Repair Program Project No. ST0912 and allow staff to solicit bids. BACKGROUND: The annual concrete program involves the repair of sidewalks, curb & gutter, driveways, and installation of new access ramps and sidewalk throughout the City. The access ramps are necessary to provide pedestrian access in accordance with the American Disability Act (ADA). Staff performed a detailed field surveyed of Old Town and developed the scope of work. The project locations are shown on Exhibit A. From a cursory windshield survey, staff projected a cost to repair all concrete work throughout the entire city, which includes sidewalk, curb & gutter, driveways and access ramps, totaling to $9.0 million dollars. The breakdown by area of the City is as follows: College Park East $3,100,000 College Park West $ 550,000 The Hill $2,090,000 Old Town $2,830,000 Arterials $ 430,000 This cost will restore all concrete work to acceptable limits. Agenda Item G Page 2 The specifications were prepared by the City Engineer's office and are complete. The City Council is being asked to approve specifications, and authorize staff to proceed with the bidding process for this work. FINANCIAL IMPACT: In the 08/09 Budget, $50,000 of General Funds and $50,000 of Measure M Turnback is allocated for this project totaling $100,000. The engineer's estimate for construction is $80,000, $10,000 for Inspection and $10,000 for contingency totaling to $100,000. RECOMMENDATION: It is recommended the City Council approve the specifications for the 2009 Annual Concrete Repair Program Project No. ST0912 and direct staff to solicit bids. SUBMITTED BY: NOTED AND APPROVED: ~~ ~ r~ Vince Mastrosimone David Carma y, City Manager Director of Public Works Attachments: A. List of Concrete Repair Locations CITY OF SEAL BEACH ENGINEERING DIVISION 2009 ANNUAL CONCRETE REPAIR PROGRAM # LOCATION: Sidewalk Replacement (SF) Curb & Gutter (LF) Ramp (LS) WCR (EA) 1 226 5th St 45 2 250 5th St 50 3 412 Central Wy 432 4 245 5th St 120 5 441 Central Ave 5th Side 120 6 223 4th St 80 9 205 4th St 48 10 213 3rd St 30 11 601 Ocean Ave 150 12 248 Electric Ave 60 13 406 Marina Dr 200 14 254 6th St Electric Side 45 16 307 Ocean Ave 90 17 117 Ocean Ave 2nd Side 235 18 117 Ocean Ave 235 19 Balboa & Marlin (WCR 1 20 Marina CC Accessible Ram) 1 21 Colle a Park Drive 40 90 3 22 301 15th (Landin Side) 96 25 221 - 225 14th St 232 26 237 14th St 40 27 311 14th St 188 28 306 14th St 24 29 228 14th St 48 30 239 15th St 144 31 15th & Electric 125 35 244-222 17th St 48 36 244-222 17th St 96 37 129 Dol hin 84 38 117-121 Dol hin 160 39 128 Dol hin 60 40 138 Dolphin 228 41 138 Dol hin Electric Side 95 42 1504 Ocean 174 Total 3822 90 1 4