HomeMy WebLinkAboutCC AG PKT 2009-09-14 #VAGEN®A STAFF REPORT DATE: September 14, 2009 TO: Honorable Mayor and City Council THRU: David Carmany, City Manager , FROM: Vince Mastrosimone, Director of Public Works SUBJECT: RESTROOM FACILITIES AT COLLEGE PARK EAST SUMMARY OF REQUEST: The City Council has asked staff to provide construction cost for restroom facilities in City Parks. SACICGROUIV®: Staff has been asked to provide cost estimates for monthly rental for temporary and permanent restrooms at City Parks. To provide a more accurate cost, staff used Heather Park as an example to calculate typical construction cost for a park with existing utilities. The following break down outlines detailed cost for construction and installation of a basic prefabricated single unisex restroom: UNIT NO DESCRIPTION QUANTITY UNIT COST TOTAL 1 UNCLASSIFIED EXCAVATION 144 SF $15.00 $2,160 2 GRADE, LEVEL AND COMPACT 144 SF $10.00 $250 3 SOILS TESTING 1 LS $1,500.00 $1,500 4 4" SEWER LINE 60 LF $320.00 $19,200 5 3/4" WATER LINE 60 LF $50.00 $3,000 6 ELECTRICAL LINE 10 LF $20.00 $200 7 CONCRETE ACCESS PATH 150 SF $12.00 $1,800 8 INSPECTION 20 HR $85.00 $1,700 9 PREFAB UNISEX SINGLE STALL 1 LS $35,000.00 $35,000 TOTAL $64,810 SAY $65,000 Agenda Item U Page 2 Additional upgrades like marine package, split face block and stainless steel toiletries will add an additional $5,000. Please see attached brochure and layout plans. The monthly cost for a temporary unisex restroom ranges from $75 to $256 depending upon the cleaning frequency and restroom type. Staff contacted a vendor So Cal Sanitation to verify monthly cost to rent a unit similar to the above permanent unisex restroom. The unit was called the Deluxe Flush with Sink with a monthly rental of $175 per month for once a week maintenance and $256 per month for twice a week. A one time fee of $35 is applied for delivery. Staff solicited 2 direct manufacturers, CXT and RFL to provide an accurate cost to the City for a dual prefabricated unisex restroom. CXT provided a cost for the Cortez model for $56,163.86. RFL's cost for a similar model was $89,276.00. See attached cost sheets. Staff also spoke to the County of Orange Parks Department which recently constructed public restrooms in Sunset Beach. County delivered the project through the traditional bid process which includes, preparing specifications, design plans and bid package then advertise and award for construction. This building was not a prefabricated facility. The facility consists of 5 buildings with 4 restrooms each for a total of 20 restrooms, including showers, 4 unisex restrooms and drinking fountains for an awarded construction cost of $862,000. Design, inspection and material testing costs were unknown. During construction, change orders totaled to approximately $100,000 bringing the construction cost to over $950,000 due to utilities and site preparation. Assuming design, inspection, material testing and construction, this facility was over $1.1 million. FINANCIAL IMPACT: No financial impact at this time. RECOMMEN®ATION: No recommendation at this time. MITT Vince Mastrosimone Director of Public Works NOTED AND APPROVED: David Carmany, City Manager .€ ~~ :~.. ' ,. ~ Cortez with chase restroom building. . Standard features include simulated ~~ barnwood texture walls, simulated ' cedar shake textured roof, vitreous v china fixtures, interior and exterior ' lights off loaded and setup at site. Cortez 4 33,500.00 I ! 33,500.00 -:~ Q-r- .. .~ ---z-----~---_x W ., ~ ~'. - ~ -- ~ -- ~ - -~- - ~ - - - - ~ - -- - -- h ...W ~ .. .L ~ rs ~.~ ~~-.~ .. . .-. . ~-.J..~ ..... - - Final Connection to Utilities $ 2,000.00 ^Q 2,000.00 Optional Wall Texture-at°°se°DeQSplit Face Block ^Struck Trowel ^Exposed Aggregate $ 1,650.00 , 1,650.00 Optional Roof Texture -~°:~ a,e^/ Delta Rib ^Exposed Aggregate $ 900.00 .r.-..__._ _ ~ ..___._.....___ ...~ 900.00 Two-Tone Color Scheme $ 250.00 ~ ^/ 3 250.00 ._ _ _- -.. ._... ... ._- ...-_. .____. __ --_~_ __ _. __ _. -. --- Stainless Steel Plumbing Fixtures - $ _._.- ._ 1,700.00 ~ _ . .. -_.. ^~ ~ ._ __- ... .. .. 1,700.00 Electric Hand Dryers $ 2,100.00 ~ ^~ j --~ 2,100.00 Electronic Flush Valves -Building without Urinals $ 950.00 ~ ^ j 0.00 .. __. ._...._.......______- --- -__~...._._. _._...._ __.-_._ __._.Y._.____.__ _~____- Electronic Lavatory Faucets ..r_.. $ ... __-_..._.._._.. 950.00 ~ - _ _ ^~ ~ ' ~ .. ~ ~ ~ 0.00 V Exterior Mounted ADA Drinking Fountain $ .., 2,700.00 ; ^ ~ _ 0.00 - Insta-Hot Water Heaters $ ~- -.... 1,150.00 ^ 0.00 Skylight in Restroom (each) Qty: 2 $ 425.00 ~ ^ ~ 0.00 Marine Grade Skylight in Restroom (each) Qty: 2 $ 1,400.00 ^ i ~- 0.00 Marine Package for Extra Corrosion Resistance $ 3,250.00 ~ -- Q i 3,250.00 Fiberglass Entry and Chase Doors and Frames $ 3,450.00 ': [] f 0.00 ._ _.._ _ ._ ... -- _-- -. _ ... _._... _.. __ _ ___ _ .----- __.. _ _-_ __.. ...... ....... .._.---_ _-.___.... -- Tile Floor in Restroom • _-_ $ ___ .__. __. _~ 2,500.00 ~ . _ __._._.... -_.y._... ( - . .- _-_ _..._._ 0.00 Anti-graffiti Coating & One (1) Case of Graffiti Remover $ 2,850.00 ' ^ 0.00 Magnetic Door Lock System (does not include chase door) ~ ~ $, 3,115.00 ^ ~ 0.00 ____ ~~ Exterior Frostproof Hose Bib with Box $ 385.00 ~ ^/ 385.00 Paper Towel Dispenser $ 85.00 ~ ^ ~ 0.00 Toilet Seat Cover Dispenser $ 75.00 j ^ 0.00 Sanitary Napkin Disposal $ 48.00 ' ^ 0.00 CXT Wastebasket $ 38.00 i ^ 0.00 Paint Touch up Kit -Single Color $ 40.00 ~ ^ ~ 0.00 Paint Touch up Kit -Two Tone Color $ 50.00 ~ . ^ ~ _ ^ 0.00 Total Cost of Selected Accessories from Accessories Price List: $ 12,235.00 Estimated One-Way Transportation Costs to Site (quote): __,. µ µ - $ 5,055.00 Total Cost per Unit: $ 45,735.00 State Sales Tax 9.75% x Building Cost: $ 4 459.16 (FYI- The building cost is the total cost per unit - irLStallaHon and freight.) , Total Cost of Unit Placed at Job Site: $ 55,249.16 CMAS administration fee is 2°k of building wst collected by the state of California $914.70 This price quote is good for 60 days from date below, and is accurate and complete. Brian D'B"a'a "ane°tryB,°" E Frost CXT Sales Representative DN °nBnan E Fras~ °=The LBFOatel co, w=CXT nn, E. Frost `man=Bt~,~~.an«n..=°8 Dale 2(109.08 7220.60 21 •079V Date ~ I accept this quote. Please process this order. Company Name Customer Date r.~ T OPTIONAL SKYLIGHT CTYP 2 PLCS) iiNO ~ - I I ~' ~ N OPTIONAL ADA DRINKING FOUNTAIN 1' 17' 19' FRONT ELEVATION EXF SPRING HINGE CTYP iSSEMHLY PANEL RIGHT SIDE ELEVATION ./E1' F®R REFERENCE oNLY Igo btmmotlen oantabne Rnnh b ormMlav ab tlr tan a aryeutbn m tnr ntomam Wto! dlOwt IM prior nMUn eonr,~t of iorotnl By atlonbp iow al Ihb bfamwlla~ pombA qmb no armtK mprau v Yryllo4 o rrarntp of mrrdwdabiltr or of flbrp N a WPoR atr 1 CONTROL EXTERIOR LIGHT PRESSURE SODIUM CTYP 2 PLCS) ANCHOR NAIL 1/4 x 3/4 PREDRILL 1/4' CTYP 20 PLCS) SIGN CSI-2> ~<SYMBOL AS REGUIRED) SPRING HINGE 4.5x4.5 CTYP 6 PLCS) 3068 DOOR ASSEMBLY /-SEE MI FOR SPECIFICATION 1' LEFT SIDE ELEVATION BUILDING ELEVATIONS CZ-02 REAR ELEVATION CXT I.I BLIND RIVET 1/8x1/4 <D COAT HOOK ONE WAY OVAL 8x1 1/4 ANCHOR LEAD 6-8x1 PREDRILL 1/4' (TYP OF 2) I.D. TAG ND RIVET 1/8x1/4 (QTY 2> 1 fLL R. taL 1 O R lYG 1 MM~OW~A IOxlr 1 DOOR STOP OCCUPANCY SENSOR OPERATED EXHAUST FAN VERTICAL HAND RAIL TP DISPENSER CSEE MI FOR SPECIFICATION) ANCHOR NAIL 1/4x1 <QTY 6) PREDRILL 1/4' GRAB HAR ANCHOR NAIL 3/16x7/8 (OTY 9> PREDRILL HOLE 3/16' DIA IB 40 18 SECTION A - A ~;~ u .~-32 3 32~' 40 54 1/2 3 54 1/2- 9 3B 79 SECTION C - C FVR REFERENCE C~NL I 27 33 S.S. MIRROR LAVATORY- HAND DRYERS / 'T-'owl FLUSH VALVE BOWL J/ SECTION D - D AI Precast Products IIxILLr PK CORTEZ CXT STANOARO BUIU)INC xona lno bbmgtlon wntdlad Ortln b praprk axd Ine nduM proportY of C%T uNrlcyapanN6 iM hfanwpUxOpno~ b~lxld~rdy. R~eblim> d46utl~o1 ailulJ«i 6ramolbl b oxktly prohNbd dtlwl Ulo prior ~rlllon ranml of Ixr boapaobd. fly albrrbq vw a Mr 1+fannulbM1 CYT bcorparolW pmb no manly, aprm a IryW4 Ylduilp a rrvrmly of awdlonlrbllly a of IMq for o porlloYor Wpm pr Ynvyarabd INTERIOR ELEVATIONS srl~r CZ-03 SECTION B - B 19' 1' 17' 7'-2' 2'-8 4' 6'-7' 3/~\ 9, i W 3 1 1' 7'-2' 3' 6'-7' 4' a- -------------- --~ 1'-6' 2'-a' ~ ~---mac - - ----- - - ~~ ~~ r--~ l ~ \ ~ ~ / `\ 1'-8 1/2' i I 60' DIA TURN CIRCLE I ; ':•::•:I:••:,:::::•:; :; :;•~:•:;•:::~ a ~ i f 3:•• l' :•:;;•;'••; ; 1 1 60' DIA NING CIRCLE l f 1 i \ / l : i . 10'-3' 9'-5' \ / ~ i 1 ~ ~ i ~s J 2'-a• ~ ~ ~~ 2'-3 1/2' 1'-6 1/~' I 0 Li f0 16x32 PLUMBING BLOCKOUT ~ 4' CEILING MOUNTED FLOURESCENT LIGHTING FIXTURE- OPTIONAL ADA DRINKING FOUNTAIN F 1 8'-6' m a• W < ar 7^ tz~ Precast Products wamr en[ s'-lo 1/a• CORTEZ CIIT STANDARD BUIU)ING lance IM bfmmWm oonfabN oorYr b paprblv~r mA Uo oWvhe pmprly of CXy bcarpomlod 1M fnfpmallon W M omd c M. pupoe~ hl y~ Rapodu Ibn ar A.46uU~m alllhb Infarmalbn b .lrmuy prohbibd dMml uw prior oAlbn canrml of Cyf bcapnolad. ey db.by um a mb blamolbn, Qfi bearpamtad pmb ne mirtmin W~ w YnW.4 briabp a manly of merohmloblllY or al INsm for a porl~ WPB rxr bmrywolN 1CC~R //''.~ REFGIlEN\rrE VIVL i FLOOR PLAN CZ-04 ~ :+:` r Concrete Buildings proved Ca°rra ` C rt ~~ .~..5 ,,,~.~. ..~56 ~ 4 CXT Precast Concrete Products manufactures restroom, shower and concession buildings in multiple designs, textures and colors. The roof and walls are fabricated with high strength precast concrete to meet all local build- ing codes and textured to match local architectural details. All CXT buildings are designed to meet A.D.A. and to withstand snow, wind and zone-4 seismic loads. All concrete construction also makes the buildings easy to maintain and withstand the rigors of vandalism. The buildings are prefabricated and delivered complete and ready-to-use, including plumbing and electrical where applicable. With thousands of satisfied customers nationwide, CXT is the leader in prefabricated concrete restrooms. Contract Information: SCHEDULE TITLE: 056- Buildings and Building Materials/Industrial Services and Supplies FSC Group 54 -Pre-Engineered/Prefabricated Buildings and Structures FSC CLASS: 5410 CONTRACT NUMBER: 4-06-56-0019A CONTRACT PERIOD: 10/16/08 through 9/30/13 CONTRACTOR'S NAME, ADDRESS, TELEPHONE AND FAX NUMBER; EMAIL AND/OR WEBSITE ADDRESS: CXT Precast Products, Inc. 3808 N. Sullivan Road, Building # 7 Spokane, WA 99216 Toll Free: 800-696-5766 Fax: 509-928-8270 E Mail: sales@cxtinc.com / Website: www.cxtinc.com CONTRACTOR'S ADMINISTRATION SOURCE: Mr. Scott Wilhelm, Division Controller BUSINESS SIZE /TYPE: Large /Manufacturer Delivery Information: All prices F.O.B. origin prepaid and added to invoice. CXT operates two (2) manufacturing plants in the United States and will deliver from the closest location on our carriers. Use the following chart to determine the origin: o F.O.B. Spokane, WA 99216 applies to: all of California. F.O.B. Hillsboro, TX 76645 applies to: all of California. Concrete Buildings la. TABLE OF AWARDED SPECIAL ITEM NUMBERS (SIN'S) WITH APPROPRIATE CROSS-REFERENCE TO PAGE NUMBER(S). SIN DESCRIPTION 361-10A Precast Concrete Buildings including accessories and options 361-1OG 361-1OH 361-32 Ancillazy services related to Pre-Engineered /Prefabricated Buildings and Structures ib. IDENTIFICATION OF THE LOWEST PRICED MODEL NUMBER AND PRICE FOR EACH SIN: (Government net price based on a unit of one, exclusive of any quantity/ dollar volume, prompt payment, or any other conces- sion affecting price). SIN MODEL/Description NET GSA PRICE 361-1OH Gunnison/Single Vault $ 9,851.44 lc. HOURLY RATES: N/A MAXIMUM ORDER PER SIN: 361-10A, 361-1OG & 361-1OH - $200,000, 361-32 - $350,000 *If the 'best value" selection places your order over this maximum order, you have an opportunity to obtain a better schedule contract price. Before placing your order, contact the aforementioned contractor for a better price. The contractor may (1) offer a new price for this requirement (2) offer the lowest price available under this contract or (3) decline the order. A delivery order that exceeds the maximum order maybe placed under the Schedule contract in accordance with far 8.404. 3. MINIMUM ORDER: $100 unless the contractor agrees to accept a smaller order amount. 4. GEOGRAPHIC COVERAGE (delivery area): all of California 5. POINT(S) OF PRODUCTION: - CXT Precast Concrete Products, 901 North Hwy 77, Hillsboro TX 76645 Hill County -CXT Precast Concrete Products, 3808 North Sullivan Road Bidg. 7, Spokane WA 99216 Spokane County 6. DISCOUNT FROM LIST PRICES OR STATEMENT OF NET PRICE: Prices shown are net. Prices exclude all Federal/State/Local taxes. Tax will be charged where applicable if customer is unable to provide proof of exemption. 7. QUANTITY DISCOUNT(S): SIN 361-10A & 361-1OH -None offered SIN 361-32 (Services) -None offered 8. PROMPT PAYMENT TERMS: Payment to CXT by the purchaser shall be made net 30 days after the submission of the invoice to the purchaser. Interest at a rate equal to the lower of (i) the highest rate permitted by law; or (ii) 1.5% per month will be charged monthly on all unpaid invoices beginning the 35th day(includes 5 day grace period) from the date of the invoice. Under no circumstances can a retention be taken and purchaser shall pay the full invoiced amount without offset or reduction. ~`S ~Qgrcved CootraCr ('''f o~ ,~ ;~, ~. 9a. NOTIFICATION THAT GOVERNMENT PURCHASE CARDS ARE ACCEPTED BELOW THE MICROPURCHASE THRESHOLD: Visa, Mastercard and American Express 9b. NOTIFICATION WHETHER GOVERNMENT PURCHASE CARDS ARE ACCEPTED OR NOT ACCEPTED ABOV$ THE MICROPURCHASE THRESHOLD: Visa, Mastercazd accepted above the micropurchase threshold. 10. FOREIGN ITEMS: None lla. TIME OF DELIVERY: 90 days ARO llb. EXPEDITED DELIVERY: None llc. OVERNIGHT AND 2-DAY DELIVERY: None lld. URGENT DELIVERY: None 12. FOB POINT(S): FOB Origin -Prepay and Add 13. ORDERING ADDRESS(ES): CXT Precast Products, Inc., 3808 N. Sullivan Road, Bldg 7, Spokane, WA 99216 13b. ORDERING PROCEDURES: Fax CMAS Purchase Order to (509) 928-8270. 14. PAYMENT ADDRESS(ES): CXT Precast Products, Inc., 3808 N. Sullivan Road, Bldg 7, Spokane, WA 99216 15. WARRANTY PROVISIONS: CXT warrants that all goods when delivered, conform to specifications set forth in the request provided by the Customer. Goods shall be deemed accepted and meeting specifications unless notice identifying the nature of any non-conformity is provided to CXT in writing within one (1) year of delivery. CXT, as its option, will repair or replace the goods or issue credit for the customer provided CXT is first given the opportunity to inspect such goods. It is specifically understood that CXT's obligation hereunder is for credit, repair or replacement only, F.O.B. CXT's manufacturing plant, Spokane Washington and does not include shipping, handling, installation or other incidental or consequential costs unless otherwise agreed to in writing by CXT. 16. EXPORT PACKING CHARGES: N/A 17. TERMS AND CONDITIONS OF GOVERNMENT PURCHASE CARD ACCEPTANCE: Government purchase cazds will be accepted on all orders. 18. TERMS AND CONDITIONS OF RENTAL, MAINTENANCE AND REPAIR (IF APPLICABLE): N/A 19. TERMS AND CONDITIONS OF INSTALLATION (IF APPLICABLE): Customers are responsible for marking exact location building is to be set; Providing clear and level site, free of overhead and/or underground obstructions; and Providing site accessible to normal highway trucks and sufficient azea for the crane to install and other equipment to perform the contract requirements. Customer shall provide notice in writing of low bridges, roadway width or grade, unimproved roads or any other possible obstacles to access. CXT reserves the right to charge the customer for additional costs. Concrete Buildings incurred for special equipment required to perform delivery and installation. Customer is responsible for all building permits required and compliance with Davis- Bacon Requirements. Customers will negotiate installa- tion on aproject-by-project basis, which shall be priced as separate line items. For more information regarding installation and truck fuming radius guidelines please see our website at www.cxtinc.com. 20a. TERMS AND CONDITIONS OF REPAIR PARTS INDICATING DATE OF PARTS PRICE LISTS AND ANY DISCOUNTS FROM LIST PRICES (IF APPLI- CABLE): List of repair parts available upon request. 20b. TERMS AND CONDITIONS FOR ANY OTHER SERVICES (IF APPLICABLE): N/A 21. LIST OF SERVICE AND DISTRIBUTION POINTS (IF APPLICABLE): N/A 22. LIST OF PARTICIPATING DEALERS (IF APPL- CABLE): N/A 23. PREVENTATIVE MAINTENANCE: Maintenance manuals available online at www.cxtinc.com. Printed manuals available by request by calling (800) 696-5766. 24. SPECIAL ATTRIBUTES SUCH AS ENVIRONMENTAL ATTRIBUTES: N/A 24b. SECTION 508 COMPLIANCE: N/A 25. DATA UNIVERSAL NUMBER SYSTEM (DUNS) NUMBER: 157004896 26. NOTIFICATION REGARDING REGISTRATION IN CENTRAL CONTRACTOR REGISTRATION (CCR) DATABASE: Cage Code OGA05 S Pp~raved Co~tra;7 ''~ o '{~'; y'~Y ;yn 1. ~~3 ef^~ XA~ .. YR~ , C Sy.:4G:3