Loading...
HomeMy WebLinkAboutCC AG PKT 2009-09-28 #IAGENDA STAFF REPORT DATE: September 28, 2009 TO: Honorable Mayor and City Council THRU: David Carmany, City Manager FROM: Vince Mastrosimone, Director of Public Works SUBJECT: REJECT BIDS FOR ELECTRIC AVENUE STORM DRAIN IMPROVEMENTS PROJECT NO. SD1001 SUMMARY OF REQUEST: The City Council is asked to reject all bids for the Electric Avenue Storm Drain Improvements Project, Specification No. SD1001 and authorize staff to re- advertise the project for bids. BACKGROUND: Per the 1999 adopted Storm Drain Master Plan and the Ad -Hoc Street & Storm Drain Committee, 2 areas were identified as high priority areas that require immediate storm drain improvement. They are Electric and Candleberry Avenue. Construction on the Candleberry Avenue Storm Drain Project is ongoing and is expected to be complete in Fall of 2009. Engineering staff prepared a full bid package to advertise and solicited for bids for the Electric Avenue Storm Drain Improvements Project. The scope of work includes storm drain and water utility construction consisting of the installation of reinforced concrete pipes and boxes, catch basins with debris filters, manholes, junction structures, ductile iron pipe and water valves on Electric Avenue from 14 Street to Seal Beach Boulevard. On September 22, 2009 the City Clerk's office received and opened 19 sealed bids with the following results: Agenda Item Page 2 # COMPANY NAME BID AMOUNT 1 KZC Construction Non - Responsive 2 Mike Bubalo Construction Co. $1,760,875.00 3 Garcia Juarez Construction $1,764,060.00 4 Steve Bubalo Construction Co. $1,876,490.00 5 MMC, Inc. $2,006,218.00 6 Palp Inc. DBA Excel Paving $2,047,475.00 7 SRD Engineering, Inc. $2,137,308.00 8 Griffith Company $2,260,163.75 9 So. Cal. Pacific Pipeline $2,392,410.00 10 Sully - Miller Contracting $2,436,652.00 11 Miramontes Construction Co. $2,504,500.00 12 ARB, Inc. $2,593,923.00 13 Belczak & Sons, Inc. $2,664,447.00 14 Kennedy Pipeline, Co. $2,712,313.62 15 Blois Construction, Inc. $2,816,704.00 16 Allied E. Corp. $2,981,447.70 17 Mladen Buntich Construction $2,985,105.00 18 Vasilj, Inc. $3,049,487.00 19 Andrew Papac and Sons $3,796,734.00 One bidder was deemed non - responsive at the time of bid opening due to missing bid bond in the bid package. Shortly after the bid opening, the City received notice from a pipe supplier that indicated some inconsistencies in the material called out in the bid package. The supplier stated that some contractors bid on alternative materials. After researching the claim, staff concluded all bids received were not all comparable due to unclear direction in the bid package. Staff spoke to the low bidder and informed them of the confusion. Based upon the claim and researching the bid package, staff recommends rejecting all bids, revising the bid package, eliminating all inconsistencies and re- advertising. A new bid opening date is set for October 13, 2009. Page 3 FINANCIAL IMPACT: In the 09/10 Budget, $4,591,000 is available for various storm drain projects. Currently in construction is the Candleberry Avenue Strom Drain Project. Staff estimates $1,200,000 is required to complete the project which leaves a remaining balance of $3,391,000. The engineer's estimate for this Electric Avenue Storm Drain Project is $2,750,000. 09/10 Budget $4,591,000 Candleberry Project - ($1,200,000) Balance $3,391,000 Electric Project $2,700,000 Inspection +$50,000 Contingency +$135,000 Project Total $2,885,000 Balance $ 506,000 The estimated remaining balance after the Electric Avenue Project is $506,000. RECOMMENDATION: It is recommended City Council reject all Improvements Project, Specification No. advertise the project for future bidding. bids for the Electric Avenue Storm Drain SD1001 and authorize staff to re- S BMITTED BY: Vince Mastrosimone Director of Public Works NOTED AND APPROVED: David Carma y, City Manager P , .\042 Engineering, CIP and General Admin Files \042 Council Reports and Rezo \042 Council Memos 2009\2009- 09 -28 \PW - Staff Report - Reject Bids for Electric Avenue Storm Drain Improvements #SD1001.doc or •*..,� `� Existing Storm Drain % r r r X C O r Proposed Storm Drain, EXHIBIT