Loading...
HomeMy WebLinkAboutCC AG PKT 2010-01-11 #PDATE: January 11, 2010 TO: Honorable Mayor and City Council THRU: David Carmany, City Manager FROM: Terrence Belanger, Interim Director of Public Works SUBJECT: APPROVAL OF CONTRACT WITH DUDEK & ASSOCIATES SUMMARY OF REQUEST: The City Council is asked to adopt Resolution No.5962 ratifying attached contract to Dudek and Associates for environmental consultant services. BACKGROUND: In 1986, the Arco Gas Station at 5 th Street and PCH fuel tanks leaked. The tanks were replaced and the onsite area was cleaned up per Orange County Health Care Agency Requirements. In early 2009, Orange County Health Care Agency informed the City, Arco will be installing a temporary soil vapor extraction system, additional groundwater and vapor monitoring wells. The work was required due to high levels of benzenes detected in the existing monitoring wells. Benzene is an organic chemical compound that is an additive to gasoline and is a known carcinogenic. Due to the nature of the project and scope of work outside city staff expertise, staff selected an environmental consultant specializing in this field. Staff selected Dudek and Associates of Irvine. Dudek is an engineering and environmental consulting firm having knowledge and extensive experience in investigating and remediating hydrocarbon and related chemical contamination of soil, soil vapor, and groundwater associated with releases from Underground Storage Tanks and petroleum processing facilities. The firm also has evaluated potential health risks due to vapor intrusion into buildings using the DTSC- modified Johnson - Ettinger model at numerous sites and have relationships with independent toxicologists that can subcontract to Dudek. Agenda Item P Page 2 The following, but not limited to, is the scope of work Dudek and Associates will perform: 1. Review and comment on monitoring reports and work plans prepared by ARCO 2. Will independently evaluate vapor migration potential and exposure potential 3. Subcontract to an independent toxicologist to review and independently calculate potential human health risks 4. Evaluate the progress of remediation and propose additional actions to expedite the remediation 5. Counsel the City and participate in meetings FINANCIAL IMPACT: There is no financial impact. Arco will reimburse the City 100% of its cost. The consultant contract is not to exceed $100,000. RECOMMENDATION: It is recommend City Council adopt Resolution No. 5962 ratifying attached contract to Dudek and Associates for environmental consultant services. SUBMITTED BY: Terrence Belanger, Interin Director of Public Works NOTED AND APPROVED: (29--p -ftb-� David Carm ny, City Manager Attachment: A. Resolutions No. 5962 B. Contracts for Professional Services RESOLUTION NUMBER 5962 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL APPROVING THE AGREEMENT FOR SPECIAL SERVICES BETWEEN THE CITY OF SEAL BEACH AND DUDEK & ASSOCIATES WHEREAS, the Arco Gas Station at 5th Street and PCH released vapor and liquid plume near and around the Bridgeport Community in Seal Beach; and WHEREAS, the nature of the project and scope of work is outside city staff expertise, staff seeks an environmental consultant specializing in this field; and WHEREAS, the City staff selected Dudek and Associates of Irvine. Dudek is an engineering and environmental consulting firm having knowledge and extensive experience in this field. NOW, THEREFORE, the City Council of the City of Seal Beach does hereby resolve: Section 1. The Council hereby approves the agreement with Dudek & Associates dated December 17, 2009 and directs the City Manager to execute the agreement. PASSED, APPROVED and ADOPTED by the City Council of the City of Seal Beach at a regular meeting held on the 11th day of January , 2010 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Mayor ATTEST: City Clerk STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 5962 on file in the office of the City Clerk, passed, approved, and adopted by the City Council at a regular meeting held on the 11th day of January 2010. City Clerk between City of Seal Beach 211 - 8th Street Seal Beach, CA 90740 V Dudek and Asszo-a—ia� 111 Pacifica, Sutie 230 Irvine, CA 92618 This Professional Service Agreement ( "the Agreement ") is made as of December 17, .ol -2810 -(the "Effective Date "), by and between Dudek ( "Consultant'), a Environmental Consultant, and the City of Seal Beach (City "), a California charter city, (collectively, "the Parties ") RECITALS A. City desires certain professional services. B. Consultant represents that it is qualified and able to provide City with such services. -NOW THEREFORE, in consideration of the Parties' performance of the promises, covenants, and conditions stated herein, the Parties hereto agree as follows. AGREEMENT 1.0 Scope of Services 1.1. Consultant must provide those services ( "Services ") set forth in the attached- Exhibit A, which is hereby incorporated by this reference. To the extent that there is any conflict between Exhibit A and this Agreement, this Agreement must control. 1.2. Consultant must perform all Services under this Agreement in accordance with the standard of care generally exercised by like professionals under similar circumstances and in a manner reasonably satisfactory to Authority. 1.3. In performing this Agreement, Consultant must comply with all applicable provisions of federal, state, and local law. 1.4. Consultant will not be compensated for any work performed not specified in the Scope of Services unless the City authorizes such work in advance and in writing. The City Manager may authorize payment for such work up to a cumulative maximum of $25,000. Payment for additional work in excess of $25,000 requires prior City Council authorization. 2.0 Consultant's Compensation City will pay Consultant for all services provided to the satisfaction of the City in accordance with the hourly rates listed in the fee schedule set forth in Exhibit B for Services but in no event will the City pay more than $100,000.00. Any additional work authorized by the City pursuant to Section 1.4 will be compensated in accordance with the rate schedule set forth in Exhibit B. 3.0 Method of Payment 3.1. Consultant must submit to City monthly invoices for all services rendered pursuant to his Agreement. Such invoices must be submitted within 15 days of the end of the month during which the services were rendered and must describe in detail the services rendered during the period, the days worked, number of hours worked, the hourly rates charged, and the services performed for each day in the period. City will pay Consultant within 30 days of receiving Consultant's invoice. City will not withhold 1 of 8 S7296- 0001 \10776000.doc 3.2. Upon 24 hours notice from City, Consultant must allow City or City's agents or representatives to inspect at Consultant's offices during reasonable business hours all records, invoices, time cards, cost control sheets and other records maintained by Consultant in connection with this Agreement. City's rights under this Section 4.2 shall survive for years following the termination of this Agreement. 4.0 Termination 4.1. This Agreement may be terminated by City, without cause, or by Consultant based on reasonable cause, upon giving the other party written notice thereof not less than thirty 30 days prior to the date of termination. 4.2. This Agreement may be terminated by City upon 10 days' notice to Consultant if Consultant fails to provide satisfactory evidence of renewal or replacement of comprehensive general liability insurance as required by this Agreement at least 20 days before the expiration date of the previous policy. 5.0 Party Representatives 5.1. The City Manager is the City's representative for purposes of this Agreement. 5.2. Peter T. Quinlan is the Consultant's primary representative for purposes of this Agreement. 6.0 Notices 6.1. All notices permitted or required under this Agreement shall be deemed made when personally delivered or when mailed 48 hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at the following addresses: To City: City of Seal Beach 211 8th Street Seal Beach, California 90740 Attn: City Manager To Consultant: Dudek 605 - Thir S+".e4- I EVIGnj z(S GAF g2v2 -A( Attn: Peter T. Quinlan 2of8 S7296- 0001 \10776000.doc 6.2. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service. 7.0 Independent contractor 7.1. Consultant is an independent contractor and not an employee of the City. All services provided pursuant to this Agreement shall be performed by Consultant or under its supervision. Consultant will determine the means, methods, and details of performing the services. Any additional personnel performing services under this Agreement on behalf of Consultant shall also not be employees of City and shall at all times be under Consultant's exclusive direction and control. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, . but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance. 7.2. Consultant shall indemnify and hold harmless City and its elected officials, officers and employees, servants, designated volunteers, and agents serving as independent contractors in the role of city officials, from any and all liability, damages, claims, costs and expenses of any nature to the extent arising from Consultant's personnel practices. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant's failure to promptly pay to City any reimbursement or indemnification arising under this Section. 8.0 Subcontractors No portion of this Agreement shall be subcontracted without the prior written approval of the City. Consultant is fully responsible to City for the performance of any and all subcontractors. 9.0 Assignment Consultant shall not assign or transfer any interest in this Agreement whether by assignment or novation, without the prior written consent of City. Any purported assignment without such consent shall be void and without effect. 10.0 Insurance 10.1. Consultant must not commence work under this Agreement until it has provided evidence satisfactory to the City that Consultant has secured all insurance required under this Section. Consultant shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Agreement on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, 3 of 8 57296- 0001 \10776000.doc 10.2. Consultant shall, at its expense, procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damages to property that may arise from or in connection with the performance of this Agreement. -insurance is to be placed with insurers with a current A.M. Best's rating no less than A:VIII, licensed to do business in California, and satisfactory to the City. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: , Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001); (2) Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 0001, code 1 (any auto); and (3) Professional Liability. Consultant shall maintain limits no less than: (1) General Liability: $2,000,000 per occurrence for bodily injury, personal -injury and property damage and if Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this Agreement/location or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: $1,000,000 per accident for bodily injury and property damage; and (3) Professional Liability: $1,000,000 per claim /aggregate. 10.3. The insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms supplied or approved by the City to state: (1) coverage shall not be suspended, voided, reduced or canceled except after 30 days prior written notice by certified mail, return receipt requested, has been given to the City; (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, (3) coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Consultant's scheduled underlying coverage and that any insurance or self - insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of the Consultant's insurance and shall not be called upon to contribute with it; (4) for general liability insurance, that the City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to the services or operations performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work; and (5) for automobile liability, that the City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Consultant or for which the Consultant is responsible. 10.4. All insurance required by this Section shall contain standard separation of insureds provisions and shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, officers, employees, agents, and volunteers. 4 of 8 S7296- 0001 \10776000.doc 10.5. Any deductibles or self - insured retentions shall be declared to and approved by the City. Consultant guarantees that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self - insured retentions as respects the City, its directors, officials, officers, employees, agents, and volunteers; or (2) the Consultant shall procure a bond guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses. 11.0 Indemnification, Hold Harmless, and Duty to Defend Consultant shall indemnify, and hold the City, its officials, officers, employees, volunteers and agents serving as independent contractors in the role of city officials (collectively "Indemnities") free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to prope or persons, including wrongful death, in any manner arising out of or incident to an acts or omissions of Consultant, its employees, or its agents in connection with the performance of this Agreement, including without limitation the payment of all consequential damages and attorneys fees and other related costs and expenses, except for such loss or damage arising from the sole negligence or willful misconduct of the City. With respect to any and all such aforesaid suits, actions, or other legal proceedings of every kind that may be brought or instituted against Indemnitees, Consultant shall defend Indemnitees, at Consultant's own cost, expense, and risk, and shall pay and satisfy any judgment, award, or decree that may be rendered against Indemnitees. Consultant shall reimburse City and its directors, officials, officers, employees, agents and /or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its directors, officials, officers, employees, agents or volunteers. All duties of Consultant under this Section shall survive termination of this Agreement. 12.0 Equal Opportunity Consultant affirmatively represents that it is an equal opportunity employer. Consultant must not discriminate against any subcontractor, employee, or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex, sexual orientation, or age. Such non- discrimination includes, but is not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff, or termination. 13.0 Labor Certification By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code that require every employer to be insured against liability for Worker's Compensation or to undertake self - insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services. 5 of 8 S7296 -0001 \10776000.doc 14.0 Entire Agreement This Agreement contains the entire agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings, or agreements. This Agreement may only be modified by a writing signed by both parties. 15.0 Severability The invalidity in whole or in part of any provisions of this Agreement shall not void or affect the validity of the other provisions of this Agreement. 16.0 Governing Law This Agreement shall be governed by and construed in accordance with the laws of the State of California. 17.0 No Third Party Rights No third party shall be deemed to have any rights hereunder against either party as a result of this Agreement. 18.0 Waiver No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a party shall give the other party any contractual rights by custom, estoppel, or otherwise. 19.0 Prohibited Interests Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City has the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom. 20.0 Attorneys' Fees If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party all of its attorney's fees and other costs incurred in connection with such action. 6 of 8 S7296-0001 \1 0776000. doc 21.0 Exhibits All exhibits referenced in this Agreement are hereby incorporated into the Agreement as if set forth in full herein. In the event of any material discrepancy between the terms of any exhibit so incorporated and the terms of this Agreement, the terms of this Agreement shall control. 22.0 Corporate Authority The persons executing this Agreement on behalf of the Parties warrant that they are duly authorized to execute this Agreement on behalf of said Parties and that by their execution, the Parties are formally bound to the provision of this Agreement. (Intentionally Left Blank) 7of8 S7296- 0001 \10776000.doc IN WITNESS WHEREOF, the Parties hereto, through their respective authorized representatives have executed this Agreement as of the date and year first above written. CITY OF SEAL BEACH By: �� � David Carmany City Manager Attest: A Linda Devine, City Clerk Approved as to Form: CONSULTANT A Name. Its: Quinn Barrow, City Attomey 8 of 8 S7296- 0001 \10776000.doc SCOPE OF SERVICES: The following scope of services provided, but not limited to the City of Seal Beach: 1. Investigating and remediating hydrocarbon and related chemical contamination of soil, soil vapor, and groundwater associated with releases from USTs and petroleum processing facilities. 2. Prepare and review monitoring reports for soil, soil vapor, and groundwater contamination at gas stations, manufacturing facilities, and multiple PRP superfund sites. 3. Evaluate potential health risks due to vapor intrusion into buildings using the DTSC - modified Johnson - Ettinger model at numerous sites and have relationships with independent toxicologists that can subcontract to Dudek. 4. Obtaining UST closures for City owned facilities. 5. Investigated benzene and MTBE migration from gas station properties along sewer backfill and infiltration into the sewer lines. 6. Evaluated potential exposure to adjacent residences from vapor migration through sewer laterals, vents and manholes. EXHIBIT A EXHIBIT B DUDEK 2010 STANDARD SCHEDULE OF CHARGES Engineering Services Project Director ...................... .....................$225.00/hr /hr Program Manager .................. .....................$215.00 /hr Principal Engineer 11 ............... .....................$195.00 /hr Principal Engineer I ................ .....................$190.00 /hr Senior Project Manager .......... .....................$180.00 /hr Project Manager ..................... .....................$165.00 /hr Senior Engineer III .................. .....................$155.00 /hr Senior Engineer II .................. .....................$150.00/hr Environmental Specialist/Planner 1 ..............$110.00 Senior Engineer I ................... .....................$140.00/hr Analyst ..... ............................... ......................$95.00 Project Engineer IV ................ .....................$130.00 /hr Project Engineer III ................. .....................$115.00 /hr Project Engineer II .................. .....................$105.00/hr Collection Maintenance Worker I ..................... Project Engineer I ................... .....................$100.00 /hr Project Coordinator ................. ......................$80.00/hr Engineering Assistant .............. ......................$75.00 /hr Right -of -Way Management Services Principal ROW Manager ......... .....................$185.00 /hr ROW Project Manager ........... .....................$150.00 /hr ROW Senior Engineer ............ .....................$140.00 /hr ROW Engineer ....................... .....................$130.00 /hr ROW Technician .................... .....................$115.00/hr Environmental Specialist/Planner IV ROW Research Analyst .......... ......................$80.00 /hr Environmental Services Principal ....................... ............................... $220.00/h r Senior Project Manager /Specialist 11...........$200.00 /hr Senior Project Manager /Specialist I ............$190.00 /hr Environmental Specialist/Planner VI ...........$175.00 /hr Environmental Specialist/Planner V ............$155.00/hr /hr Environmental Specialist/Planner IV ...........$140.00 /hr Environmental Specialist/Planner 111............$130.00 /hr Environmental Specialist/Planner 11 .............$120.00/hr .................$130.00 /hr Environmental Specialist/Planner 1 ..............$110.00 /hr Analyst ..... ............................... ......................$95.00 /hr Planning Research Assistant .. ......................$75.00/hr $40.00 /hr Archaeological Services Senior Project Manager /Archaeologist II ..... $200.00/hr Senior Project Manager /Archaeologist I ......$190.00 /hr Environmental Specialist/Archaeologist VI ..$175.00/hr Environmental Specialist/Archaeologist V...$155.00 /hr Environmental Specialist/Archaeologist IV..$140.00/hr Environmental Specialist/Archaeologist III ..$130.00 /hr Environmental Specialist/Archaeologist 11...$120.00 /hr Environmental Specialist/Archaeologist 1....$110.00 /hr Archaeologist Technician 11 ..... ......................$70.00 /hr Archaeologist Technician I ...... ......................$50.00 /hr Construction Management Services Principal/Manager .................. .....................$195.00/hr Senior Construction Manager .....................$180.00 /hr Senior Project Manager .......... .....................$160.00 /hr Construction Manager ............ .....................$150.00 /hr Project Manager ..................... .....................$140.00 /hr Resident Engineer ................ .....................$140.00 /hr Construction Engineer ............ .....................$135.00 /hr On -site Owner's Representative .................$130.00 /hr Construction Inspector III ....... .....................$125.00/hr Hydrogeologist (/Engineer I ..... ......................$95.00 Construction Inspector 11 ........ .....................$115.00/hr Technician ...................... ............................... Construction Inspector I ......... .....................$105.00/hr $40.00 /hr Prevailing Wage Inspector ..... .....................$135.00 /hr Hydrogeological Services Principal ....................... ............................... $220.00/h r Sr. Environmental Engineer ... .....................$190.00 /hr Sr. Hydrogeologist/Sr. Proj Mgr ...................$170.00 /hr Project Manager ..................... .....................$155.00 /hr Associate Hydrogeologist/Engineer ............ $140.00/hr Hydrogeologist IV /Engineer IV ....................$125.00/hr Grade IV Operator ............. ............................... Hydrogeologist III /Engineer III .....................$115.00/hr Grade III Operator ............. ............................... Hydrogeologist II /Engineer II .. .....................$105.00 /hr Hydrogeologist (/Engineer I ..... ......................$95.00 /hr Technician ...................... ............................... $95.00/h r District Management & Operations District General Manager ............................... $175.00/hr District Engineer .............. ............................... $160.00 /hr Operations Manager ....... ............................... $150.00 /hr District Secretary/Accountant .......................... $85.00 /hr Collections System Manager ... ......................$95.00 /hr Grade V Operator ............ ............................... $100.00 /hr Grade IV Operator ............. ............................... $85.00 /hr Grade III Operator ............. ............................... $80.00 /hr Grade 11 Operator .............. ............................... $63.00 /hr Grade I Operator ............... ............................... $55.00 /hr Operator in Training ................... ...................... $40.00 /hr Collection Maintenance Worker II .................... $55.00 /hr Collection Maintenance Worker I ..................... $40.00 /hr Office Services Technical/DrafllnVCADD Services 3D Graphic Artist ............. ............................... $150.00 /hr Senior Designer .............. ............................... $130.00 /hr Designer .......................... ............................... $120.00/hr Assistant Designer .......... ............................... $115.00 /hr GIS Specialist IV ............. ............................... $140.00 /hr GIS Specialist III .............. ............................... $130.00 /hr GIS Specialist II ............... ............................... $120.00 /hr GIS Specialist I ................ ............................... $110.00 /hr CADD Operator III ........... ............................... $150.00 /hr CADD Operator 11 ............ ............................... $100.00 /hr CADD Operator I ............... ............................... $85.00 /hr CADD Drafter .................... ............................... $80.00 /hr CADD Technician .............. ............................... $70.00 /hr Support Services Technical Editor III ........... ............................... $140.00 /hr Technical Editor 11 ............ ............................... $120.00 /hr Technical Editor I ............. ............................... $100.00/hr Publications Assistant III .... ............................... $95.00 /hr Publications Assistant II ..... ............................... $85.00 /hr Publications Assistant I ...... ............................... $75.00 /hr Clerical Administration 11 .... ............................... $80.00 /hr Clerical Administration I ..... ............................... $70.00/hr Forensic Engineering - Court appearances, depositions, and interrogatories as expert witness will be billed at 2.00 times normal rates. Emergency and Holidays - Minimum charge of two hours will be billed at 1.75 times the normal rate. Material and Outside Services - Subcontractors, rental of special equipment, special reproductions and blueprinting, outside data processing and computer services, eta, are charged at 1.15 times the direct cost. Travel Expenses - Mileage is billed at the Federal IRS rates per mile. Per diem where overnight stay is involved is charged at cost Invoices, Late Charges. - All fees will be billed to Client monthly and shall be due and payable upon receipt. Invoices are delinquent if not paid within thirty (30) days from the date of the invoice. Client agrees to pay a monthly late charge equal to one percent (1 %) per month of the outstanding balance until paid in full. ®U ®E K Effective January 1, 2010 EXPERIENCE Mr. Quinlan has been a professional hydrogeologist since 1982. He worked in groundwater exploration and water resources evaluation for Tetra Tech International and the government of Oman before returning to the United States and working for first Hargis + Associates and then Dudek. His current professional responsibilities include design and' supervision of groundwater contamination investigations at hazardous waste sites. Areas of specialization include planning and supervision of field operations for groundwater and soils contamination investigations, groundwater modeling, water resource studies, cost allocation among multiple PRPs at superfund sites, and environmental assessments. EDUCATION University of Arizona, Tucson MS Hydrology 1982 LICENSES & CERTIFICATIONS Registered Geologist AZ No. 26772 — expires 3/31/2011 Litigation Support PUBLICATIONS • Expert for response cost drivers in mediation settlement of litigation 1 983 Results of Test between remediation cost cap insurer and Department of Defense Drilling in th e Ibri Area, g in th concerning allocation of response costs at former Bermite facility in by J.J. sz, P.T. Santa Clarita, CA. Quinlan, and R.J. Dingman. Public Authority for • Expert witness in mediation settlement of litigation over relative Water Resources, contributions to groundwater contamination by TCE, perchlorate, and Sultanate of Oman. NDMA from municipal solid waste and aerospace industrial waste at a landfill in Rancho Cordova, California. 1982 Climatic Change and • Designated expert witness in mediation among three successor Water Availability in the operators of an aerospace manufacturing facility in Monrovia, California. Rio Grande and Pecos The objective of the mediation was to determine the relative River Basins, by P.T. contributions of TCE, 1,1,1 -TCA, and 1,4- dioxane to groundwater by Quinlan. Masters Thesis. the various operators. Tucson, Arizona: University of Arizona. • Expert witness in insurance litigation concerning relative contributions of PCE and TCE from manufacturing operations and a landfill at a RCRA Effects Of Spatio- facility in Noblesville, Indiana. Temporal Variability Of • Designated Expert for fate and transport in toxic tort litigation Precipitation On Contaminant concerning alleged migration of VOCs from a landfill to residential Migration In The Vadose properties in Salinas, CA. Zone, by Peng Wang, • Designated expert for vadose zone fate and transport in litigation over Peter Quinlan, and Daniel allocation of liability among three adjacent properties for PCE and TCE M. Tartakovsky, contamination in groundwater in Compton, CA GEOPHYSICAL RESEARCH LETTERS, • Expert witness in insurance litigation at a PRP site in the Baldwin Park VOL. 36 Operable unit of the San Gabriel Valley Superfund Sites. 20 June 2009. • Designated expert for vadose zone fate and transport in litigation over TCE contamination of groundwater at the West Osborn Complex in DUDEK & ASSOCIATES, INC. February 2005 Phoenix, Arizona. 0 • Expert witness in insurance litigation over causes of VOCs contamination of groundwater at a site that was formerly proposed for the National Priorities List in Stockton, CA. • Expert witness in insurance litigation concerning causes of PCE contamination at five industrial dry cleaning plants in California and Arizona. • Designated expert witness in litigation over mobility of arsenic at a landfill in Imperial County. • Expert witness in litigation over historical impact of a service station in San Diego, California. • Provided testimony in arbitration hearing regarding PCE contamination at a dry cleaning site in Escondido, California. • Provided expert deposition testimony in insurance litigation concerning TCE, PCE, and chromium contamination at a manufacturing facility in Huntington Park, California. • Designated expert in litigation over causes of a landslide in Laguna Niguel, California. • Provided deposition testimony on rainfall infiltration and migration in litigation over construction defects in housing development in Gilbert, Arizona. • Retained as an expert in Rialto multiple PRP perchlorate and TCE groundwater contamination litigation. • Designated expert witness in litigation concerning alleged PCE contamination of a neighboring facility in Burbank, California. • Provided deposition testimony on sources of soil and groundwater contamination at a drycleaner in San Jose, CA. Cost Allocation • Analyzed investigation and remediation costs to allocate response costs for perchlorate and VOCs between remediation cost cap insurer and Department of Defense at former Bermite facility in Santa Clarita, CA. • Evaluated relative contributions of VOCs by various PRPS for a party in OCWD v. Northrup in order to assist in the formulation of offers to settle litigation over groundwater contamination with PCE, TCE, 1,4- dioxane, and perchlorate in the north Orange County Groundwater Basin. • Prepared model to allocate costs among PRPs in Baldwin Park Operable unit of San Gabriel Valley Superfund sites. Participated in remedy driven allocation of costs based on unique treatment costs for Perchlorate, NDMA, 1,4- Dioxane, and VOCs. DUDEK & ASSOCIATES, INC. February 2005 • Participated in allocation mediation for the El Monte Operable Unit of the San Gabriel Valley Superfunds Site including relative the impacts of VOCs, chromium, perchlorate, and NDMA from 15 facilities on potential remedy costs. • Participated in allocation mediation of North Glendale Operable Unit of the San Fernando Valley Superfund sites. • Participated in the preparation of cost allocation models -for the Stringfellow Acid Pits Superfund site. Groundwater and Vadose Zone /Modeling • Performed vadose zone and groundwater modeling of a PCE release for a party in OCWD v. Northrup litigation over groundwater contamination with PCE, TCE, 1,4- dioxane, and Perchlorate. • Prepared solute transport model of vadose zone and groundwater at West Osborn Complex in Phoenix, Arizona. • Prepared coupled vapor transport and groundwater transport models of VOC releases from landfills in California and Indiana. • Prepared vadose zone model of rain infiltration and evaporation to evaluate soil moisture content beneath footings and slabs in Gilbert, AZ. • Prepared vadose zone model to evaluate the migration of nitrate from septic systems through 400 feet of soil to groundwater in Joshua Tree, CA. • Developed solute transport model of a glacial outwash aquifer with complex surface water/ groundwater interaction. Simulations included the replicating fate of VOCs degraded by reductive dehalogenation. • Participated in the preparation of a finite element model of the San Gabriel Basin that was used to design a groundwater remedy in the Baldwin Park Operable Unit of the San Gabriel Valley Superfund sites. • Prepared three - dimensional density- driven flow model of the Tijuana River Valley to evaluate seawater intrusion groundwater development alternatives and groundwater recharge using reclaimed water and injection wells. • Prepared a groundwater model to simulate the affects of increased infiltration at a wasterwater plant in Rancho Santa Fe, California. • Prepared groundwater model of the San Dieguito Valley to evaluate the effectiveness of coordinated groundwater pumping and reclaimed water recharge in reversing saltwater intrusion. • Prepared a solute transport model of a layered alluvial aquifer system to design groundwater remediation at a wood treating facility in the Central Valley. • Prepared a solute transport model of a layered alluvial aquifer system to design groundwater remediation at the Kearney KPF facility on Stockton, California. This model was also used to evaluate the relative contributions of various sources to groundwater contamination in support of insurance litigation. • Prepared groundwater model to simulate the impact of additional groundwater withdrawals from the Dyer Road well field, Orange County, California for Irvine Ranch Water District DUDEK & ASSOCIATES, INC. February 2005 o Prepared model to simulate the potential impact of a new production well in Fountain Valley, California for Laguna Beach County Water District. c Prepared a numerical groundwater model to evaluate the impacts of increased discharge rates of wastewater effluent from the Rancho Santa Fe Water Pollution Control Facility in the San Dieguito Valley. Soil and Groundwater Contamination Studies • Designed and directed investigation of groundwater contamination by volatile organic .compounds at manufacturing facilities including aerospace, electric component, and dry cleaning establishments located in California and Texas. • Designed and implemented in situ remediation pilot studies to destroy volatile organic compounds at two electric component manufacturing facilities in Southern California. These field studies employed both ethanol stimulated reductive dechlorination and oxidation using potassium permanganate. • Investigated soil and groundwater contamination at a PRP facility in the Glendale North Operable Unit of the San Fernando Valley Superfund Sites. • Investigated soil and groundwater contamination by TCE, PCE, Perchlorate, NDMA, 1,4- Dioxane, and carbon tetrachloride in the Baldwin Park Operable Unit of the San Gabriel Valley Superfund sites. Also provided technical oversight of groundwater modeling for the BPOU Steering Committee. • Investigated soil and groundwater contamination at a pesticide applicator facility, San Diego, California. Work performed included preparing a hydrogeologic assessment report for submission to Regional Water Quality Control Board. • Investigated the integrity of hazardous waste surface impoundments at a state Superfund site in El Centro, California. Worked performed included providing technical assistance in negotiating Consent Decree with California Department of Health Services, designing and conducting Remedial Investigation /Feasibility Study, and performing closure of surface impoundments in accordance with Toxic Pits Cleanup Act and Consent Decree. • Designed a program to monitor groundwater contamination by solvents, fuels, and metals involving 104 monitor wells at a manufacturing facility in Texas. • Prepared closure plan for municipal landfill for the Hualapai Nation, Peach Springs, Arizona. Remedial Design and Implementation Designed and implemented remediation of PCE and TCE in vadose zone in Burbank, California. No Further Action letter issued. o Designed and implemented a pump and treat groundwater remediation to treat VOC contaminated groundwater at a manufacturing facility in California. Designed and implemented a soil vapor extraction to remediate VOC- contaminated soil. DUDEK & ASSOCIATES, INC. February 2005 • Designed and implemented soil remediation and groundwater remediation technologies, including the injection of treated groundwater and modification to municipal well field pumpage patterns to facilitate remediation at an electronic component facility in Stockton, California. • Designed enhanced in situ bioremediation of groundwater contaminated with chlorinated solvents. • Designed and implemented soil remediation technology at a pesticide operation facility located in Southern California. • Designed and implemented a remedial investigation of chromium contamination and designed and installed a remedial wellfield at the Marley Cooling Tower Company Superfund site, Stockton, California. Underground Storage Tank Investigations • Investigated tank integrity and designed and installed continuous leak detection system using vapor detection for 20 USTs at the Hughes Aircraft Facility in Los Angeles, California. • Developed and implemented work plan to close underground fuel storage tanks and investigate potential leakage at an aerospace manufacturing facility located in Los Angeles, California. • Investigated an 11,000- gallon gasoline leak from an underground storage tank and remediated free product and contaminated groundwater and soil located in Los Angeles, California. • Investigated soil contamination resulting from leakage of solvents at an aerospace manufacturing facility in Torrance, California. • Investigated groundwater contamination resulting from gasoline and diesel leakage from USTs in Encinitas, California. • Investigated groundwater contamination resulting from gasoline and diesel leakage from USTs in El Centro, California. • Investigated groundwater contamination resulting from gasoline leakage from USTs in San Diego, California. Groundwater Supply and Development a Prepared a groundwater supply assessment for the Joshua Basin Water District including simulations of water level and storage declines in response to various demand growth scenarios. Evaluated recharge estimates, estimated storage, historical production and declines in groundwater levels and estimated both recharge from septic system discharges and water quality impacts associated with septic discharge. Identified potential sites for artificial recharge through capture of storm runoff and imported water. o Designed and prepared well specification for a new production well for Joshua Basin Water District. Evaluated potential spreading basin locations for aquifer recharge with imported water. DUDEK & ASSOCIATES, INC. February 2005 • Evaluated potential impact of a new production well on water levels and pump submergence in existing wells, on seawater intrusion, and colored water migration in the Orange County groundwater basin for the Laguna Beach County Water District. • Conducted resource evaluation and prepared groundwater management plan in accordance with AB3030, to develop groundwater resources in the Tijuana Valley. Designed a groundwater exploration program for the San Diego Formation which included the installation of two 1,400 -foot deep observatory wells and a 1,200 -foot deep production well. • Evaluated impacts of increased production from the Dyer Road Well field for the Irvine Ranch Water District • Consulted with Suburban Water Systems to site and design two 1200 foot exploratory boreholes and two 1200 foot production wells. Prepared draft well specifications for driller bid packages, interpreted geophysical logs, designed well screen intervals, slot size and filter pack. Evaluated water quality analyses from zone testing to determine screen intervals. • Prepared evaluation of the potential impact of a 3000 GPM water supply well on surrounding water supply wells for Laguna Beach County Water District. • Prepared Groundwater Management Plan for Rainbow Municipal Water District. The plan addresses water quality impacts from agricultural and horticultural runoff and septic discharges as well as developing groundwater supply. • Evaluated the potential impact of seepage of reclaimed water from the San Joaquin Reservoir for Irvine Ranch Water District This evaluation included review of hydraulic properties of the reservoir liner and underlying formations and water quality impacts on the Newport Beach Back Bay. • Evaluated the impact of future wastewater plant effluent discharges comprised of imported on the salinity of groundwater for the Ramona Municipal Water District. Prepared numerical models of the basin and a report to support a Basin Plan Amendment request from the Regional Water Quality Control Board. • Investigated development of groundwater supply from the Saugus Formation on the south flank of the San Gabriel Mountains. Designed and constructed one 700 foot deep well. • lbri -Dhank Investigation - Investigated quantity and quality of groundwater available in alluvial formations and Eocene/Paleocene limestone and dolomites beneath the foothills of the Jabal Akhdar and plains between the mountains and sand dunes of the Empty Quarter in the Sultanate of Oman. Responsible for review of existing hydrogeologic information, siting exploration wells, logging boreholes, designing wells, conducting aquifer tests, and relating data to existing hydrogeologic information. Constructed 12 wells to depths of 700 feet. • Jabal Qara Investigation - Investigated quantity and quality of groundwater available in karstic Paleocene limestone and dolomite outside Salalah, Oman. Responsible for review of existing hydrogeologic information, siting exploration wells, logging boreholes, designing wells, conducting aquifer tests, and relating data to other wells of investigation. Constructed 16 wells to depths of 1,600 feet. • Najd Investigation - Investigated quantity and quality of groundwater available in Oligocene, Eocene, and Paleocene limestone and dolomite formations between coastal Jabal Qara mountain range and the Empty Quarter. Responsible for review of existing hydrogeologic information, siting exploration wells, logging DUDEK & ASSOCIATES, INC. February 2005 boreholes, designing wells, conducting aquifer tests, and relating data to existing hydrogeologic information. Constructed I I wells to depths of 1,650 feet. c Salalah Plain Investigation — Evaluate recharge to coastal aquifer from rainfall and seepage through fault at the foot of Jabal Qara Moutnains scarp. Set up program of monitoring spring discharge and stream flow and groundwater levels. Designed and conducted investigation of aquifers beneath the Salalah Plain in Dhofar Province of Oman. The investigation include 180 kilometers of high resolution seismic refraction surveys to determine stratigraphy and identify fractures, faults, karsts. Constructed 18 wells including one 2,900 feet deep. Responsible for review of existing hydrogeologic information, siting exploration wells, logging boreholes, designing wells, conducting aquifer tests, and relating data to existing hydrogeologic information. O Investigated hydraulic conductivity of dual porosity Miocene formations by means of packer testing, Salalah, Sultanate of Oman. o Investigated seawater intrusion along the Salalah Coast, Sultanate of Oman. DUDEK & ASSOCIATES, INC. February 2005 Peter T. Quinlan, RG — Principal; Hydrogeology /Hazardous Materials, Division Manager Environmental Assessments • Conducted environmental due diligence review of eight theme parks in California, Florida, Spain, Japan, and China for potential acquisition. • Conducted environmental due diligence review of thirteen casino properties in Nevada, Illinois, Michigan, and Mississippi for an acquisition transaction. • Evaluated the results of an environmental investigation of soil contamination and proposed bioremediation of former oilfield, gas plant, and refinery located in Santa Fe Springs, California. • Designed and conducted an environmental assessment of an agricultural site located irl Riverside, California for possible DDT and fuel contamination. • Directed environmental assessment and compliance audit of electronic component manufacturing facilities in Newhall, California, and Tijuana, Mexico. • Conducted environmental assessment of six aerospace industrial properties in California, Utah, Massachusetts, and Canada for a single real estate transaction. Injection Wells /Oil Well Abandonment e Designed, constructed and operated a 350 gpm injection well in the Central Valley of California. o Abandoned 1923 oil well in Inglewood, California to current standards to allow development of property for commercial buildings. DUDEK Waste Management Page 8 of 8 DEREK M. REED, P.E. ENVIRONMENTAL ENGINEER Education o B.S., Civil Engineering, University of California, Los Angeles (1992) Professional Certifications Professional Civil Engineer, California No. 56042 Nevada Certified Environmental Manager, No. 1977 Experience Mr. Reed is a California registered civil engineer and has over seventeen years of environmental and civil engineering experience. His responsibilities include the engineering design and oversight of hazardous waste remediation projects, Phase 1 /11 environmental assessments /investigations, Preliminary Environmental Assessments, regulatory compliance audits, and remedial investigations/ feasibility studies. Site Investigation and Remediation Vapor Intrusion and Contaminant Migration Study, San Diego, California. Served as project manager for vapor intrusion and contaminant migration study for a public water utility. Work included investigation of the utility corridors potentially acting as a conduit for migration of benzene and chlorinated solvents in groundwater and vapor phase. Potential risk to adjacent businesses and residences was evaluated using the Johnson Ettinger Vapor Intrusion Model. Chlorinated Solvent Vadose Zone Remediation, Ontario, California. Served as project manager for the investigation and remediation of a chlorinated solvent impacted manufacturing facility. Soil vapor extraction was performed beneath the location of a former vapor degreaser. Concentrations of chlorinated compounds were reduced to below the regulatory threshold from a human health risk. Leaking Underground Storage Tanks Assessment, San Diego, California. Served as project manager for a leaking underground storage tank investigation in the City of San Diego. Project included the re- designation of the groundwater basin to non - beneficial use. Former Kearney KPF Facility, Stockton, California. Conducted a quarterly groundwater monitoring program for a chlorinated solvent contaminated site in Stockton. PCB Assessment, San Diego Unified Port District, San Diego, California. Performed site assessment of a PCB contaminated site for the San Diego Unified Port District. Work included Level C sampling and analysis of approximately 10,000 square feet of PCB contaminated concrete. C PCB Investigation, Naval Public Works Center, Naval Station, San Diego, California. Performed site assessment of a PCB contaminated site at the Naval Station in San DUDEK Page 1 of DEREK M. REED, ENVIRONMENTAL El Diego. Work in luded Level C sampling and analysis of a 1.5 acre PCB storage facility. o AST Investigations, Naval Research and Development (NRaD), San Diego, California. Performed a subsurface investigation of hydrocarbon contaminated sites resulting from leaking aboveground storage tanks. Advanced Oxidation Groundwater Remediation, Stockton, California. Served as project manager on a chlorinated solvent groundwater remediation. Remediation technology included UV /Oxidation, air stripping, and liquid phase granular activated carbon. ® Methane Investigation /Mitigation, San Diego County, California. Served as project manager for soil -gas studies of 1,000+ unit residential subdivisions, proposed school sites and community buildings. Designed and certified installation of mitigation systems for combustible soil -gas detected in the soil. Methane Mitigation 13th Story Residential Building, Los Angeles, California. Served as design engineer for a methane mitigation system of a multi -story building within the City of Los Angeles' Methane Zone. C In- Situ Groundwater Remediation, Newport Beach, California. Served as project manager for an in -situ bioremediation of a site with groundwater contaminated with chlorinated solvents. Project was located at a Southern California aerospace /microelectronics company, and included injection of a nutrient substrate to sustain an anaerobic population of microorganisms that cometabolize the chlorinated contaminants. Soil vapor extraction was also used to remove contaminant mass from the vadose zone. Groundwater Remediation, Naval Air Station (NAS), North Island, California. Served as project engineer for a free -phase hydrocarbon remediation pilot study at the NAS in North Island. The purpose of this study was to evaluate the effectiveness of various recovery systems on the free -phase JP -5 and Diesel Fuel Marine contamination. Project work included the design, installation, and evaluation of the various recovery systems at two test sites. C Vadose Zone Remediation, Commerce, California. Served as project engineer for a petroleum hydrocarbon remediation using soil vapor extraction at a former lift truck manufacturing facility located in Commerce. Underlying contamination extended through varying lithology that included silty clay. The site received a "No Further Action" letter from the Regional Water Quality Control Board, Los Angeles Region. Feasibility Studies and Cost Estimating Dry Cleaning Investigation and Remediation Cost Analysis, San Jose, California. Performed review and analyses of costs associated with the investigation and on- going remediation of VOC contaminated vadose zone and groundwater and a dry DUDEK Page 2of7 DEREK M. (REED, P.E. ENVIRONMENTAL ENGINEER cleaning facility. Work included review of RI /FS, RAP and past and proposed future costs for litigation support. ® Former Kaiser Steel Superfund Site, Fotana, California. Performed third party review of investigation and remediation costs for Superfund cleanup of soil, soil vapor and groundwater related to past industrial activities. Work was performed under contract with the writer of the Remediation Stop Loss and Real Estate Environmental Liability Policy. The anticipated remediation costs are in excess of $13 million. Baldwin Park Operable Unit /San Gabriel Valley Superfund Engineering Cost Analyses, California. Performed engineering cost analyses and evaluations for the Baldwin Park Operable Unit /San Gabriel Valley Superfund Steering Committee. Various treatment technologies for perchlorate, NDMA and 1 A- dioxane were evaluated. Technologies were evaluated for both cost effectiveness and applicability for use to treat water used as a public water supply. Feasibility studies evaluated treatment plant locations, well field design, pipeline alignments, right -of- way requirements, and the requirements of the various public entities involved or impacted by the project. The ultimate remedy included five treatment plants operated by various entities within the Operable Unit. El Monte Operable Unit /San Gabriel Valley Superfund Engineering Cost Analysis, California. Performed engineering cost analyses and evaluations for the El Monte Operable Unit /San Gabriel Valley Superfund Steering Committee. Various treatment technologies for perchlorate, NDMA and l A4dioxane were evaluated. Feasibility studies evaluated treatment plant locations, well field design, pipeline alignments, right -of -way requirements, and the requirements of the various public entities involved or impacted by the project. The ultimate remedy included four treatment plants. c Engineering Evaluation /Cost Analysis, George AFB, California. Prepared Engineering Evaluation /Cost Analysis Plan for the remediation of a medical waste disposal area located at George AFB in California. Phase I and H Environmental Site Assessments Sweetwater Union High School District Phase I ESAs and PEAS, California. Provided oversight and technical support for the preparation of Phase I ESAs for Chula Vista High School and Hilltop High School for the Sweetwater Union High School District. PEAs were required for both sites due to nearby former underground storage tanks. Dudek negotiated with DTSC to limit the PEA investigation area to the area of new construction on the school sites, in order to meet tight construction deadlines. The PEAs for both sites have been approved by DTSC. ® San Marcos Unified School District Phase I ESA, California. Provided oversight and technical support for a Phase I ESA for the San Marcos Unified School District in November 2003. The Phase I ESA was reviewed and approved by DTSC. DUDEK Page 3of7 DEREK M. REED, P.E. ENVIRONMENTAL ENGINEER • Methane Testing, Proposed School Sites, Poway Unified School District, California. Conducted methane testing on proposed high school and elementary school sites within the 4S Ranch master planned community. North Chollas Burn Site Remediation, City of San Diego, California. Served as project engineer for the remediation of 200,000 tons of lead contaminated material at a former burn ash site immediately adjacent to an existing elementary school. The project required random sampling within known areas of contamination for the purpose of waste characterization, preparation of remedial documentation, on -site support during the remediation phase, and development of site specific storm water management solutions that were installed as the grading operation progressed. Lead contamination in the soil and general sediment control were accomplished by using engineered structures, typical BMPs and construction personnel education program. SDG &E Silvergate Transmission Substation Project EIR, California Public Utilities Commission, City of San Diego, California. Prepared Hazardous Material, Water Quality and Geology portions of the EIR. The project consists of replacing the existing Main Street Substation with a new 230/69 kV Substation (Silvergate) in downtown City of San Diego and undergrouding of a 138 kV circuit. Portions of the project are located in areas with potential subsurface contamination and upstream of impaired water bodies. SDG &E Otay Mesa Power Purchase Agreement Transmission Line Project EIR, California Public Utilities Commission (CPUC), San Diego County, California. Prepared Hazardous Material, Water Quality and Geology portions of the EIR, which evaluates a linear 28 -mile new overhead and underground 230 kV circuit as well as over 35 alternatives consisting of over 500 miles (230 miles of PEA system alternatives, 120 miles of design variations and 160 miles of transmission system variations developed by the EIR project team) of routing and design options within a large geographic area covering San Diego County. Evaluated proponents and submittals regarding potential hazardous materials within the project site as related to the mitigation measures presented in the EIR. The EIR received the Association of Environmental Professionals (AEP) 2005 award for "Outstanding Environmental Analysis." Phase I and II ESAs, City of Fontana, California. Provided oversight and technical support on four Phase I and II ESAs on current or former commercial or light industrial sites for the City of Fontana. Former Agricultural Land Phase 1 /11, Encinitas, California. Served as project manager for a Phase I and II environmental investigation for a 12 acre site in Encinitas. Site was a former flower growing facility with several structures present including a paint storage area. Soil analyses included pesticides /herbicide, VOCs, and TPH. Key areas investigated include greenhouse areas, outdoor row crop areas, boiler /AST locations, former UST locations and the paint storage area. Redevelopment of the site as single family residential was approved by the City of Encinitas. DUDEK Page 4of7 DEREK M. REED, P.E. ENVIRONME ENGINEER Former Agricultural Land Phase 1 /11, Oceanside, California. Served as project manager for a Phase I and II environmental investigation for an approximately 20 acre former agricultural site in Oceanside. The Phase II work included sampling for pesticides and other compounds associated with the former land use. "The rezoning and development of the property as residential was approved by the Oceanside Planning Commission. • Former Agricultural Land Phase 1 /11, Oceanside, California. Served as project manager for a Phase I and Phase II investigation of a 5 acre agricultural property on the north edge of the San Luis Rey River. Development of the property as multi- family residential was approved by the Oceanside Panning Commission. • Former Agricultural Land Phase II, Carlsbad, California. Served as project manager for a Phase 11 investigation of a former agricultural property in Carlsbad. • NACCO Phase 1 /11, South Plainfield, New Jersey. Performed Phase I and Phase II Environmental Investigations for a lift truck manufacturing /service facility in South Plainfield. Contaminants included metals and petroleum hydrocarbons. • San Diego Unified Port District Phase 11, Chula Vista, California. Conducted Phase and Phase II Environmental Investigations for the San Diego Unified Port District's Shangri La Site. The site was contaminated with various metals resulting from marine manufacturing operations. Hydrology/Water Quality Groundwater /Surface Water Analyses, Vista Unified School District, Vista, California. Provided oversight and technical support for a groundwater /surface water study at the Guajome Park Academy. After groundwater surfaced on school property, water flow rates and groundwater elevations were monitored. Water quality was evaluated through chemical analyses to determine if it posed a hazard to workers or students and to assess its suitability as an additional irrigation water source. Rainbow Valley Basin Groundwater Management Plan, California. Served as project manager for the development of a draft groundwater management plan for the Rainbow Valley Basin. The groundwater management plan addressed both surface water and groundwater quality issues as they relate to the CalFed program and recently published Total Maximum Daily Loading goals for Rainbow Creek. Monitoring programs identified in the plan included both nutrient and sediment loading of surface waters and general groundwater quality monitoring. The groundwater management plan also identified educational programs for the local agricultural and residential community to improve water quality. San Diego Unified Port District Soil Remediation, San Diego, California. Served as project engineer for the remediation of approximately 4,000 tons of petroleum D U D E K Page 5 of 7 DEREK M. REED, P.E. ENVIRONMENTAL ENGINEER contaminated site. The contamination was diesel fuel and #2 fuel oil released from an underground storage tank adjacent to San Diego Bay. The site was extensively sampled to allow segregation of contaminated material requiring remediation, using an immunoassay screening methodology. Spill, Prevention, Control and Countermeasure Plans, Imperial Beach, California. Implemented structural modifications in accordance with Spill, Prevention, Control and Countermeasure (SPCC) plan for Naval Auxiliary Landing Facility (NALF), San Clemente Island, and Navy Outlying Field (NOLF), Imperial Beach. Work included hazardous materials storage facilities, bulk petroleum storage and transfer facilities. Regulatory Compliance RCRA Part B Permit Application, Naval Air Station (NAS), North Island, California. Project manager for reapplication of RCRA Part B Permit for a 1 mgd industrial waste treatment plant, a 0.250 mgd oil recovery plant, hazardous waste storage and transfer facility, and a PCB storage facility at the NAS in North Island. ® Aboveground Storage Tank Compliance, various sites, California. Evaluated regulatory compliance of aboveground petroleum storage tanks, made recommendations and preliminary design drawings for modifications that would bring the tanks into compliance at various Naval installations throughout California. O Office of Statewide Health Planning and Development (OSHPD) Hospital Permitting, USC University Medical Center, San Diego, California. Prepared Office of Statewide Health Planning and Development (OSHPD) permits for structural alterations, USC University Medical Center, California. Landfill C West Miramar Class III Landfill, Miramar, California. Served as project engineer for the design of a RCRA Subtitle 'D' lined module at the West Miramar Class III landfill. Work included a seven module layout and fill sequencing plan, excavation and fill plans, leachate collection and recovery system, earthwork quantities, and project module life calculations. Miramar Landfill, Miramar, California. Prepared preliminary layout for landfill gas extraction system for use in conjunction with a proposed cogeneration facility at Miramar Landfill. Coachella Landfill, Coachella, California. Served as project manager for an environmental investigation and land use plan of a landfill site in the City of Coachella. D U D E K Page 6 of 7 DEREK M. REED, P.E. ENVIRONMENTAL ENGINEER Palomar Airport Landfill Extraction System, Palomar Airport Landfill, Carlsbad, California. Prepared layout for a landfill gas extraction system at the Palomar Airport Landfill in Carlsbad. • Palomar Airport Landfill Gas Study, Palomar Airport Landfill, Carlsbad, California. Performed gas well sampling and surface monitoring for an off -site gas migration study at the Palomar Airport Landfill in Carlsbad. • Viejas Burn Site, Viejas Indian Tribe, California. Served as project engineer for the closure of an unclassified landfill /burn site for the Viejas Indian Tribe in California. Work included site characterization through final closure. • Hualapai Landfill Closure, Arizona. Prepared Liner Design and Closure Documentation for the Hualapai Landfill in Arizona. • Indian Health Services Landfill Support, Department of Indian Health Services, various sites, California. Performed landfill characterization for over a dozen sites on Tribal lands for Department of Indian Health Services. DUDEK Page 7of7