Loading...
HomeMy WebLinkAboutCC AG PKT 2010-01-25 #IDATE: January 25, 2010 TO: Honorable Mayor and City Council THRU: David Carmany, City Manager FROM: Terrence Belanger, Interim Director of Public Works SUBJECT: APPROVE PLANS AND SPECIFICATIONS FOR LOCAL STREET RESURFACING PROGRAM PROJECT NO. ST0906 -B (ST1004) - COLLEGE PARK EAST SUMMARY OF REQUEST: The City Council is asked to approve the plans and specifications for the Local Street Resurfacing Program Project No. ST0906 -B (ST1004) — College Park East and authorize staff to solicit bids. BACKGROUND: City Council allocated $5 million dollars for local street resurfacing. The City Council created an Ad -Hoc committee to select various streets city -wide to be paved. Based on the approved 2008 Pavement Management System and the Ad -Hoc Committee, the following streets were selected: COLLEGE PARK EAST - Proiect No. ST0906 -B Candleberry Avenue from Aster Street to Marigold Street Fuchsia Street from Birchwood Avenue to Elder Avenue Fir Avenue from Ironwood Avenue to Goldenrod Street Fir Avenue from Rose Street to Wisteria Avenue Guava Avenue from Ironwood Avenue to End Hazelnut Street from Guava Avenue to Heather Street Goldenrod Street from Elder Avenue to End Fuchsia Circle from Fir Avenue to End Tulip Street from Ironwood Avenue to Lampson Avenue The original project consisted of resurfacing streets in both Old Town and College Park East. Staff divided the project into two separate projects, one in Old Town, Project No. ST0906 -A and the other in College Park East, Project No. ST0906 -B. Staff believes that by dividing the larger project into two smaller Agenda Item Page 2 projects, the City can receive some cost savings. There are aspects of each project which are different for the different neighborhoods that would require specialized subcontractors. Smaller companies will now be able to bid on the an individual project separate from the other whereas before, only the larger paving companies would be able to bid on the bigger project. The scope of work in College Park East consists of removing damaged curb & gutter and driveway entrances and replacing with new curb & gutter and driveway entrances for improved curb drainage. The project also consists of pulverizing the existing roadway, Full Depth Reclamation using Portland Cement, and paving with rubberized asphalt. The complete bid package is located in the City Engineer's office for review and is ready to solicit bids. In the approved 2009/10 Budget, Capital Improvement Project funds are budgeted for Local Street Resurfacing, in the amount of $5,050,000. Fundin General Fund $ 3,934,000 State Gas Tax $ 160,000 Measure M $ 330,000 1 B Bond $ 386,000 Traffic Relief $ 240,000 Total $ 5,050,000 Expenses Design Engineering (RBF) $ 400,000 Construction, Old Town (Engineer's estimate) $ 2,700,000 Construction, CPE (Engineer's Estimate) $ 1,700,000 Inspection $ 250,000 Total $ 5,050,000 The state of California has been 'borrowing' the City of Seal Beach's property tax revenue to provide funds to close the State's revenue /expenditure deficit. This fiscal year, 2009/2010, the amount is $750,000. The decisions of the State have adversely affected the adopted FY 09/10 Municipal Budget. The impact has been such that each City department has been asked to reduce their budget by 2.0 %, using the adopted budget as the basis for the reduction. The State's `borrowings' not only reduce current year revenues; but, the borrowing also affects the City's ability to replenish the unallocated General Fund revenues. The unallocated reserves are the main funding source for Local Street Resurfacing projects, such as Project No. ST0906 -A and Project No. ST0906 -13, as well as many of the City's Capital Improvement Projects. Page 3 FINANCIAL IMPACT: The cost for construction of Project No. ST0906 -B (ST1004) - College Park East is $1,700,000. The cost for inspection is $80,000. The total cost to construct the project in College Park East is $1,780,000. The funds for this construction are budgeted in the 2009/2010 Budget and are sufficient to complete the construction of this project. RECOMMENDATION: It is recommended the City Council approve the plans and specifications for the Local Street Resurfacing Program Project No. ST0906 -B (ST1004) — College Park East and authorize staff to solicit bids. SUBMITTED BY: Terrence Belanger, Interim Director of Public orks Prepared by: David Spitz, Associate Engineer Attachments: NOTED AND APPROVED: d-N��e'-J — David Carma y, City Manager A. College Park East Paving Map CITY OF SEAL BEACH LOCAL STREET RESURFACING PROGRAM PROJECT No. ST0906 COLLEGE PARK EAST GUAVA AVE HAZELNUT AVE FUCHSIA CIR-� 7 FIR AVE CANDLEBERRY AVE PROJECT AREA GOLDENROD ST r AVE � r ! I� W O 1 O IK r - 1 FIR AVE FIR AVE FUCHSIA ST NTS TULIP ST IL