DATE: July 12, 2010
TO: Honorable Mayor and City Council
THRU: David Carmany, City Manager
FROM: Sean Crumby, P.E., Director of Public Works
SUBJECT: ADOPT THE 2010 PAVEMENT MANAGEMENT PLAN
SUMMARY OF REQUEST:
Approve Resolution No. 6035 adopting the 2010 Pavement Management Plan.
BACKGROUND:
Pavement Management is an asset management system used by agencies to
effectively and equitably manage a street system for an entire city. The system
catalogs and rates all of the streets within the City. It also maps out the
performance of the streets over time and with projected budget numbers,
prepares recommendations for future maintenance and rehabilitation. This
system helps agencies not only to maximize the efficiency of the funds spent, but
also helps to plan future needs for the city.
Pavement management became prevalent during the 1990's. During that period
the Orange County Transportation Authority (OCTA) began requiring that Cities
implement Pavement Management to remain eligible to receive Measure M
funding for street funding. OCTA has since updated the request that all streets
within the City are included within a Pavement Management Program (PMP) that
is updated every 2 years. Currently, the City receives approximately $350,000 in
Measure M turnback funds annually, and has historically received over $300,000
annually in competitive Measure M grants.
The City of Seal Beach has been utilizing a PMP since the early part of the
1990's, and has been updating that system every two years since 2004. The
City of Seal Beach has invested heavily on the street system during this time and
the PMP has assisted the City with optimizing this investment. In 2004 the City
began utilizing a software system call the Metropolitan Transportation System for
PMP. In 2009 OCTA prepared a study and standardized the requirements of the
PMP that the Cities utilize. The Study recommended that the Cities use the
MicroPAVER Pavement Management Software. The two systems are similar in
that they rate streets on a 0 -100 scale.
Agenda Item Z
Page 2
For this biennial update, the City Council awarded $25,000 to the firm of Nichols
Consulting Engineers (NCE) on April 26, 2010. NCE promptly sent a team of
inspectors to the City to rate every street within the City. NCE then took the data
from the previous software and converted it over to the new system, and
prepared the Pavement Management Report. A copy of the report has been
available for review at the Public Works Department and is included as
attachment "B ".
FINANCIAL IMPACT:
There is no impact to the general fund with this action. The proposed Pavement
Management Plan identifies approximately $19 million in street improvements
that could be made if the City had an unlimited budget.
RECOMMENDATION:
It is recommended that the City Council approve Resolution No. 6035 adopting
the 2010 Pavement Management Plan.
SUBMITTED BY: NOTED AND APPROVED:
n
Sean Crumby, P.E. David Carma y, City Manager
Director of Public Works
Attachments:
A. Resolution No. 6035
B. 2010 Pavement Management Plan
RESOLUTION NUMBER 6035
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL
BEACH, CALIFORNIA ADOPTING THE 2010 PAVEMENT
MANAGEMENT PLAN
WHEREAS, the Pavement Management Plan is an asset management system
used by agencies to effectively and equitably manage a street system for an
entire city; and
WHEREAS, the Pavement Management Plan is updated every 2 years; and
WHEREAS, the City of Seal Beach desires to adopt the 2010 Pavement
Management Plan.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH
DOES HEREBY RESOLVE:
Section 1. The 2010 Pavement Management Plan is hereby adopted.
PASSED, APPROVED and ADOPTED by the City Council of the City of Seal
Beach at a regular meeting held on the 12th day of July , 2010
by the following vote:
AYES: Council Members
NOES: Council Members
ABSENT: Council Members
ABSTAIN: Council Members
Mayor
ATTEST:
City Clerk
STATE OF CALIFORNIA }
COUNTY OF ORANGE } SS
CITY OF SEAL BEACH }
1, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the
foregoing resolution is the original copy of Resolution Number 6035 on file in
the office of the City Clerk, passed, approved, and adopted by the City Council at
a regular meeting held on the 12th day of July , 2010.
City Clerk
.
NICHOLS CONSULTING ENGINEERS, CHTD.
Engineering and Environmental Services
7071 Warner Avenue, F #147
Huntington Beach, CA 92647
(714) 848 -8897
334.06.30
City ®f Seal Beach
Pavement Management Program
Final Deport
Submitted to:
City of Seal Beach
2118 Street
Seal Beach, CA 90740
July 2010
Table of Contents
Introduction.................................................................................................................... ............................... 1
Purpose........................................................................................................................... ............................... l
City's Street Network .................................................................................................... ............................... 2
ExistingPavement Condition ......................................................................................... ............................... 4
Maintenance & Rehabilitation Strategies ...................................................................... ............................... 8
PayNow or Pay More Later .......................................................................................... ............................... 8
Expenditures for Pavement Maintenance ...................................................................... .............................10
FundingSources ........................................................................................................... ............................... 11
BudgetNeeds ................................................................................................................. .............................12
BudgetScenarios ........................................................................................................... .............................14
Scenario 1 - Unconstrained ($18.9 million) ...................................................... .............................15
Scenario 2 - Maintaining PCI at 80 ($1.7 million/year) ................................... .............................16
Scenario 3 - Existing Budget ($850,000/ year) ............................................... ............................... 17
Discussion..................................................................................................................... .............................18
Conclusions.................................................................................................................. ............................... 21
Section 1:
Street Inventory and PCI Report
Section 2:
Maintenance and Rehabilitation History
Section 3:
Sections Selected For Treatment ($850,000 /year, City's Existing Budget)
Section 4:
City's Projected Resurfacing Program
Section 5:
City's Projected Slurry Seal Program
Nichols Consulting Engineers, Chtd. ii
List of Tables
Table 1.
Network Summary Statistics by Functional Class ...................................... ..............................1
Table 2.
Percentage of Pavement Area by Condition (20 10) ................................... ...............................
4
Table 3.
Pavement Condition by Functional Class ( 2010) ....................................... ...............................
5
Table 4.
Pavement Condition Category Breakdown for 2004 -2010 ........................ ...............................
6
Table 5.
Average Network Condition for 2004 - 2010 ............................................... ...............................
6
Table 6.
, Pavement Budget (2004 to 2016) ............................................................. ...............................
10
Table 7.
Summary of Results from Needs Analysis ................................................. .............................12
Table 8.
Summary of Results from Scenario 1 - Unconstrained Budget .................. .............................15
Table 9.
Summary of Results from Scenario 2 - Maintain PCI at 80 ................. ...............................
16
Table 10.
Summary of Results from Scenario 3 - Existing Budget ...................... ...............................
17
List of
Figures
Figure 1.
Current Pavement Condition by % of Network Area ................................. ............................... 5
Figure 2.
Costs to Maintain Pavements Over Time .................................................. ............................... 9
Figure 3.
Cost Effectiveness of Treatments ............................................................... .............................13
Figure 4.
PCI vs. Unfunded Backlog for Unconstrained Budget ............................... .............................15
Figure 5.
PCI vs. Unfunded Backlog for Maintain PCI at 80 ($850,000 /year) ....... ...............................
16
Figure 6.
PCI vs. Unfunded Backlog for Existing Budget ........................................ .............................17
Figure 7.
Pavement Condition Index for Each Scenario ............................................ .............................18
Figure 8.
Effect of Different Scenarios on Unfunded Backlog .................................. .............................19
Figure 9.
Percentage of Road Network Area of Each Condition
Category for Different Budget Scenarios ................................................. ...............................
20
Nichols Consulting Engineers, Chtd. iii
Introduction
The City of Seal Beach has utilized a pavement management program (PMP) to manage its street
network since 2004. The first PMP software used was the StreetSaver® program, but in 2010,
the City converted to the MicroPAVER software to be compliant with the requirements of the
Orange County Transportation Authority (OCTA). Both programs are similar and rate pavements
on a 0 -100 Pavement Condition Index (PCI) scale.
Nichols Consulting Engineers, Chtd. (NCE) was selected by the City of Seal Beach to update the
City's pavement management system in 2010. The entire network (approximately 41 centerline
miles or 210 pavement sections) were surveyed. The surveys were completed in May 2010, and
all survey data were entered into MicroPAVER database, which was converted from the previous
StreetSaver database. The table below summarizes the lengths and area of the pavement network
by functional class.
Table 1. Network Summary Statistics by Functional Class
As part of this project, a pavement needs analysis was performed on the pavement network.
Three budgetary scenarios were also analyzed. Due to differences in the software parameters
between the StreetSaver® and MicroPAVER programs, the results will be similar, but not
identical. Therefore, any comparisons with past reports and analyses should bear this in mind.
Purpose
The purpose of this report is to assist policy makers in utilizing the results of the Pavement
Management Program (PMP). Specifically, this report links the PMP recommended repair
program costs to the City of Seal Beach's current and projected budgets and identifies various
maintenance and rehabilitation strategies. The analyses assess the adequacy of current and
projected revenues to meet the maintenance needs recommended by the PMP program. It also
maximizes the return from pavement funding by:
(1) implementing a multi -year road rehabilitation and maintenance program;
(2) developing a preventative maintenance program; and
(3) prioritizing and selecting the most cost effective repairs.
This study determines the overall condition of the pavement network and highlights options for
Nichols Consulting Engineers, Chtd. I
improving the current network -level pavement condition index (PCI). These options are
developed by conducting "what -if' analyses. By varying the budget amounts available for
pavement maintenance and repair, one can see how different funding strategies can impact the
City's streets over the next seven years.
City's Street Network
The City of Seal Beach was incorporated in 1915 and has been in operation under its own charter
since1964. It covers an area of 11.6 square miles in the western corner of Orange County. The
City's total population in 2000 was 24,157. Originally called Bay City, Seal Beach was
developed in the early 1900's as a resort destination for residents of the Los Angeles area. Its
early growth was accelerated by the construction of the Pacific Electric Railway Trolley, which
reached the City in 1906. In 1926, oil was discovered in the City, and the oil boom that followed
resulted in the development of Seal Beach into the mainly residential community it is today.
The City is divided into several distinct communities, each of which is described in detail in the
following paragraphs.
Old Town is the area south of Pacific Coast Highway (PCH) and Marina Drive, between 1 st
Street and Seal Beach Boulevard, and was developed in the 1920's. It is the oldest area within the
City's corporate limits. High density residential and commercial land uses are prevalent in this
area. Large single - family residential lots located directly on the beach are found in the Gold
Coast District. The City's mile long beach in Old Town is used for surfing and swimming. The
Seal Beach Pier, located at the end of Main Street, provides fishing facilities and a restaurant.
Much of Old Town dates back to the 1920's. The original street network was laid out in a grid
formation and constructed of concrete. Over the years, many of these streets have been overlaid
with asphalt.
Bridgeport is the area located west of Pacific Coast Highway, north of Marina Drive and
southwesterly of San Gabriel River. It was primarily developed in the 1960's and consists of
medium and high density residential land uses.
Marina Hill was developed in the 1950's and consists of single - family homes. This area is
located north of Pacific Coast Highway and west of Seal Beach Boulevard, adjacent to the
southerly edge of the Hellman Ranch property. It is further divided into Marina Hill -North and
Marina Hill South, with Bolsa Avenue forming the boundary.
Surfside, a colony which was incorporated in the 1930's, consists of single - family homes located
on the south portion of Anaheim Bay. Although a gated community, pedestrian and bicycle
access to the beach is available.
Leisure World covers the portion of the City between Westminster Boulevard and the San
Diego Freeway westerly of Seal Beach Boulevard. It was built in 1961. It is a gated retirement
community of 600 acres. Leisure World provides a secure, serene environment for seniors 55 and
Nichols Consulting Engineers, Chtd. 2
older. Medical, religious, commercial and recreational facilities are all provided within the
compound limits.
College Park East is a single - family residential area developed in the late 1960's. It is located
between the San Diego Freeway and Lampson Avenue, west of the Bolsa Chica Channel in the
northeast section of the City. Streets within this community were constructed in the late sixties.
The original thickness of the asphalt concrete was only 2 inches and too thin to accommodate the
traffic loads.
Private Streets
The following neighborhoods have private streets and are maintained by an association and no
City funds go toward their maintenance.
• Leisure World
• Centex Homes
• Riverbeach Condominiums
• Surfside
• Heron Pointe
Nichols Consulting Engineers, Chtd. 3
Existing Pavement Condition
As previously noted, the City of Seal Beach is responsible for the repair and maintenance of
approximately 41 centerline miles of streets. The surface area of the network is approximately
9.4 million square feet or 1 million square yards. The replacement value of the City's streets is
approximately $99.1 million. (This is the cost to replace the pavement and does not include
sidewalk, ramps, curb & gutter etc.)
The pavement condition index, or PCI, is a measurement of pavement grade or condition and
ranges from 0 to 100. A newly constructed road would have a PCI of 100, while very poor
streets would have a PCI of 40 or less.
Table 2 provides pavement condition breakdowns by PCI ranges or condition category and
summarizes the condition of network in the City of Seal Beach. A large portion of the City's
streets are in "Good" or "Very Good" condition category, as shown in Figure 1. Table 3 provides
the pavement condition by Functional Class.
Table 2. Percent of Pavement Area by Condition (2010)
Nichols Consulting Engineers, Chtd. 4
' •�
0•
`"
The pavement is new or almost new and will not require
86
69%
significant improvement for some time, but may require
. aYr y k• :
-100
localized minor repairs. The pavement is structurally
sound and has very little or no roughness.
The pavement is in good shape but has some surface
75 -85
o
6/0
defects indicating the need for routine maintenance. The
pavement is generally structurally sound and has only
minor roughness.
The pavement has a fair number of defects such as
cracking, material loss, depressions, etc. indicating the
60 -74
8%
need for maintenance or repair. The pavement is
beginning to become structurally deficient and may have
noticeable roughness.
The pavement has significant defects such as major
cracking, significant surface distortions and material
or
41 -59
6%
loss indicating a need for rehabilitation (i.e. structural
improvement). The pavement is structurally deficient
and has noticeable roughness.
The pavement has major defects indicating the need for
0 -40
11%
major rehabilitation or reconstruction. The pavement is
structurally inadequate.
Nichols Consulting Engineers, Chtd. 4
Figure 1. Current Pavement Condition by % of Network Area
The City of Seal Beach's current weighted average Pavement Condition Index for the
roadways is 84, or in the "Good" condition category. The weighted average is determined as
follows:
N
(PCI x A
Pq, = `_' N
E.4
=1
Where
PClQ area weighted average PCI of pavement network
PCI PCI of pavement section number i
A ; = area of section number i
N= total number of section in City's network
Nichols Consulting Engineers, Chtd. 5
Table 3. Pavement Condition by Functional Class (2010)
This average PCI of 84 is an 8 -point increase from the last update in 2008, and is largely due to
the significant amount of maintenance activities that have occurred in the past two years. The
street inventory and PCI report is included in Section 1. A summary of the maintenance and
rehabilitation history is included in Section 2.
Table 4 summarizes the condition of the road network from 2004 -2010. The percentage of
pavements in good and very good condition has significantly increased since 2008. Conversely,
the percentage of pavements in poor to very poor condition has gradually decreased over time.
Table 4. Pavement Condition Category Breakdown for 2004 -2010
Table 5 below shows the network average PCI in the past 7 years. As can be seen, the weighted
average condition of the pavement network has improved since 2006, with the highest increase
in the last two years. Again, this is attributable to the significant repairs that have occurred in this
period.
Table 5. Average Network Condition for 2004 -2010
i Year 2004`:.;2006
2008
2010;
The improvement in the pavement condition will make the City eligible for a 10% reduction in
local matching fund requirements for the renewed Measure M competitive grant. This is a new
incentive approved as part of the Renewed Measure M; specifically, the Measure M Regional
Capacity Program -- which will provide Measure M grant funding for arterial, intersection, and
freeway /arterial improvements — includes an incentive for successful implementation of
pavement management programs. The incentive is a 10% reduction in local matching fund
requirements, if either of the following conditions apply i.e.
Nichols Consulting Engineers, Chtd. 6
a. Show measurable improvement of paved road conditions during the previous
reporting period defined as an overall weighted (by area) average system
improvement of one PCI point with no reduction in the overall weighted (by area)
average PCI in the Master Plan of Arterial Highways (MPAH) or local street
categories; or
b. Have road pavement conditions during the previous reporting period within the
highest 20% of the scale for road pavement conditions in conformance with
OCTA Ordinance No. 3, defined as a PCI of 75 or higher.
The City's PCI rating will make the City eligible for this 10% reduction in matching fund
requirements.
Nichols Consulting Engineers, Chtd. 7
Maintenance & Rehabilitation Strategies
A variety of Maintenance and Rehabilitation (M &R) strategies may be applied to maintain
pavements. They include slurry seals, asphalt concrete overlays and reconstruction, all of which
extend the pavement life. The following paragraphs briefly describe the various strategies that
are utilized in the City.
Slurry Seals are a mixture of slow setting asphalt emulsion, fine aggregate (sand - like), and
water. This mixture is spread over the entire pavement surface and is about 3/8" thick. In
addition to protecting the asphalt concrete surface and subgrade from water damage, the slurry
seal provides a new wearing surface. This type of treatment is analogous to oil changes for a car
i.e. necessary maintenance that increases the life of a car (or, in this case, increases the life of the
pavement so they do not prematurely require more costly repairs).
Asphalt Concrete (AC) Overlays typically involves placing 1.5 to 4 inches of asphalt concrete
over the existing surface. Overlays are placed when the pavement has deteriorated to a point that
a seal coat will not bring the pavement back to an acceptable level of service, usually because of
structural inadequacy. This may be caused by:
• Age
• Climate
• Air & water penetrating the pavement through cracks
• Aggregate base or subgrade soil failures
• Heavier traffic loads than anticipated in the original design
Reconstruction involves removing the existing layers of asphalt concrete and base and
reconstructing an entirely new pavement section.
Maintenance Intervals
A seal coat is applied at regular intervals, usually 5 to 7 years. After several intervals of seal
coats, an overlay is typically required to address structural issues. The intervals between overlays
and reconstruction depends upon the road classification as well as the original design life. Major
roads have higher traffic volumes, speeds, and loads, which increase pavement wear and demand
a higher level of service for safety reasons. Every street eventually fails or reaches a point where
it is cheaper to reconstruct than to repair.
Pay Now or Pay More Later
The Pavement Management Program (PMP) is designed to achieve an optimal network PCI
somewhere between the low to mid 80's, which brings the network into a "good" condition
category. In other words, the system will recommend priority list of maintenance treatments in
an attempt to bring all the streets in the City of Seal Beach to a good condition, with the majority
of the roads falling in the mid 80's.
Nichols Consulting Engineers, Chtd. 8
The cost to repair and maintain a pavement depends on its current PCI. In the "good" category,
preventive maintenance treatments such as slurry seals have minimal costs. They are applied
before pavement deterioration has become severe and usually cost approximately $0.30 /sq. ft.
About 75% of the City's streets would benefit from these relatively inexpensive, life- extending
treatments.
As noted in Table 1, approximately 8% of the City's streets fall into the "fair" condition
category. Pavements in this range show some form of distress or wear that require more than a
life - extending treatment. The pavements typically require a thin overlay, which costs about
$2.70 /sq. ft.
The remaining 17% of the City of Seal Beach's streets fall below a PCI of 60. The City's
policies indicate that a thick overlay or reconstruction is the most appropriate treatment. The
costs for these treatments range from $4.90 to $10.501 sq. ft.
Figure 2 demonstrates that pavement maintenance follows the old colloquial saying of "pay me
now, or pay me more later." History has shown that it costs less to maintain roads in good
condition than to repair roads that have failed. By allowing pavements to deteriorate, roads that
once cost only $0.30 /sq. ft. to slurry seal may soon cost $2.70 to $4.90 /sq. ft. to overlay and
upwards of $10.50 /sq. ft. to reconstruct.
Pavement Condition
Very Good I' ' Do Nothing.
Good siurry seal
' $0.30 /sf
........... i"�� .......
Fair 2 "AC.Overlay: .
$2.70 /st -
..................................... ...............................
Poor I 4" AC Overlay and Digouts
$4.90 /st
............................................................ ...............................
Very Poor
R_ econstruction
$10.50 /st
Pavement Life
Figure 2. Costs to Maintain Pavements Over Time
Nichols Consulting Engineers, Chtd. 9
One of the key elements of a pavement management repair strategy is to keep roads in the
"good" and "fair" categories from deteriorating. This is particularly true for roads in the "fair"
range, because they are at the point where pavement deterioration accelerates if left untreated.
Expenditures for Pavement Maintenance
It is estimated that the City of Seal Beach will have funds of $850,000 /year for pavement
expenditures for the next seven years. Table 6 summarizes the past and future estimated budget
amounts. Three continuing funding programs have been allocated to meet the needs of
preventative maintenance and rehabilitation.
• Arterial Rehabilitation Program
• Local Street Rehabilitation Program
• Preventative Program (Slurry Seal)
Table 6. Pavement Budgets (2004 to 2016)
Note that the City currently has $770,000 a year budgeted for the five -year Capital Improvement
Program (CIP). This includes $160,000 for slurry seals, $350,000 for arterial rehabilitation, and
$260,000 for local rehabilitation. However, City staff aggressively pursues, and typically
receives grants that supplement the paving budget to provide for more road paving projects.
Historically, Seal Beach has been successful at obtaining additional funds such as Prop. 1B or
the Measure M competitive grants. Therefore, this report assumes that, on average, $850,000 a
year will be spent on paving.
Nichols Consulting Engineers, Chtd. 10
" Arterial rehabilitation has been funded with Measure M grants which augment City funds.
Funding Sources
The following is a discussion of future revenues available to the City for street maintenance.
State Gas Tax / Prop. 42
The motor vehicle fuel tax in California includes an 18 -cent per gallon excise tax used for
transportation improvements as well as a sales tax (Prop. 42). However, effective July 1 2010,
Prop. 42 will no longer exist, but the excise tax will be increased so that funding to Cities and
Counties are kept "whole ". The City receives approximately $600,000 annually in gas tax. It
currently transfers approximately $300,000 into the General Fund to pay for general maintenance
operations of streets such as striping, pothole patching, sign and signal maintenance. The
remaining funds of $300,000 per year are applied towards resurfacing projects.
Measure M Turnback
Measure M is the %2 -cent local retail sales tax approved by voters in November 1990 and
renewed in 2006 until 2040. The program will provide $450 million to local agencies for street
maintenance and local traffic improvements. These funds are used alone or in conjunction with
other sources to address transportation improvements such as rehabilitation, signals, street
widening, etc. The City's share is approximately $400,000 per year and will be used to fund
resurfacing projects.
Measure M Competitive Grants
In addition to the Turnback funds, the Comprehensive Transportation Program (CTP) also
includes a competitive grant process for projects such as capacity program, signal
synchronization and transit. The Arterial Highway Rehabilitation Program (AHRP) will fund
projects such as overlays and reconstruction. Eligible expenditures include bike lanes, bus
turnouts /pads, replacement of parking lanes, curbs, gutters, catch basins, curb ramps and some
sidewalks. City streets that are included in the Master Plan of Arterial Highway (MPAH) system
are eligible.
Local Revenues /General Funds
Local revenues that may be used for street rehabilitation include retail sales tax, redevelopment
fees, assessment districts and property taxes. These revenue sources are also used for vital city
activities such as police, fire and administrative services. In 2010 the City budgeted and
expended more than $5.0 million on local paving projects.
Nichols Consulting Engineers, Chtd. 11
Budget Needs
Based on the principle that it costs less to maintain roads in good condition than bad, the
Pavement Management Program strives to develop a maintenance strategy that will first improve
the overall condition of the arterials to an optimal PCI somewhere between the mid and upper
80's, and then maintain it at that level. The average PCI for the City's streets is 84, which is in
the "Good" condition category, but there is still a portion of the streets that exhibit load - related
distresses. In addition, there is currently a significant unfunded backlog of several million
dollars. If these issues are not addressed, the quality of the arterials will inevitably decline. In
order to correct these deficiencies, a cost - effective funding and maintenance and rehabilitation
strategy must be implemented.
The first step in developing a cost - effective maintenance and rehabilitation strategy is to
determine the maintenance "needs" of the City of Seal Beach's streets. Using the budget needs
module, maintenance needs over the next seven years were estimated at $18.9 million. These
costs significantly exceed the City's current funding levels of $5.95 million. If the City of Seal
Beach rehabilitated every street within the City, the average PCI will be 86 in 2017. If, however,
no maintenance is applied over the next seven years, already distressed roads will continue to
deteriorate, and the PCI will drop to 73 by 2017. The results of the budget needs analysis are
summarized in Table 7 (below). Note that the seven year analysis period is a change from
previous analyses, which only considered five
The results of the budget needs analysis are shown in Table 7 below. Of the $18.9 million in
maintenance needs shown, approximately $1.8 million (9.5 percent) is earmarked for
preventative maintenance, while $17.1 million (90.5 percent) is allocated for more costly
rehabilitation and reconstruction treatments.
It is important to note that these budgetary numbers have been compiled using current projects as
a basis for construction costs. Currently, the economy has yielded an extremely competitive
bidding environment that may not be sustainable in the long term. An inflation factor of 5% was
used for this analysis.
Nichols Consulting Engineers, Chtd. 12
The cost - effectiveness of preventative maintenance treatments is demonstrated in Figure 3 which
compares the current condition of the network and the maintenance needs estimated. The portion
of the network in good and very good condition (75% of the City's streets) requires only $2.6
million over the next seven years, whereas the 25% in the "fair" to "very poor" condition needs
approximately $16.3 million.
Figure 3. Cost - Effectiveness of Treatments
Fair,
8.00 °G
Good and Very Good,
75.00%
Network Area by Condition
Maintenance Needs By Condition
Nichols Consulting Engineers, Chtd. 13
Budget Scenarios
Having determined the maintenance needs of the City's streets, the next step is to conduct
what -if analyses. The program projects the consequences of different scenarios on pavement
condition (PCI) and unfunded backlog. By examining the effects on these indicators, the
advantages and disadvantages of different funding levels and maintenance strategies become
clear. The following scenarios were analyzed for this report:
Scenario 1: Unconstrained Budget ($18.9 million) - The total amount for the next seven
years and the budget for each year are the same as identified in the budget needs analysis, i.e.
$18.9 million. This scenario will spend $18.9 million in 2011 to rehabilitate all of the City's
pavement. It will improve the condition of the streets to a PCI of 86 by 2017 and eliminate the
unfunded backlog.
Scenario 2: Maintain PCI at 80 ($1.7 million/year) - The budget required to maintain the
City's streets at a PCI of 80 would be $1.7 million/year. In the meantime, the unfunded backlog
will decrease from $17.7 million to $12.7 million by 2017.
Scenario 3: Existing Budget ($850,000 1year) - This scenario illustrates the impacts of the
City's current budget on the network. The PCI of the network will deteriorate to 76, and the
unfunded backlog will grow to over $20.5 million by 2017.
The list of sections selected for treatment under existing budget is detailed in Section 3. This list
of candidate streets has been further refined by City staff and is detailed in Section 4 and 5.
Note that the unfunded backlog consists of pavement maintenance that is needed, but which can
not be accomplished due to lack of funding. Shrinking budgets have forced many California
cities and counties to defer much - needed road maintenance. By deferring maintenance, not only
does the frequency of citizens' complaints about the condition of the network increase, but the
cost to repair these roads rises as well.
Nichols Consulting Engineers, Chtd. 14
Scenario 1: Unconstrained Budget ($18.9 million)
To eliminate the unfunded backlog will require $18.9 million for the next 7 years. The average
PCI will increase to 86 from its current level of 84 by 2017.
Table 8. Summary of Results for Scenario 1— Unconstrained Budget
Figure 4. PCI vs. Unfunded Backlog for Unconstrained Budget ($18.9million)
�c$
R O
m �SS
d i
V R
C d
7
$10
E7
It'l
80 a
70 m
c
C
O
50
C
4o 8
30 c
d
E
>
cc
a
10
0
2011 2012 2013 2014 2015 2016 2017
Year
EM Unknded Baddog —&— Pavement Condition Index
Nichols Consulting Engineers, Chtd. 15
Scenario 2: Maintain PCI at 80 ($1.7 million /year)
The budget required for maintaining the City's network at an average PCI of 80 will be $1.7
million/year. In the meantime, the unfunded backlog will decrease from $17.7 million to $12.7
million by 2017.
Table 9. Summary of Results for Scenario 2 - Maintain PCI at 80
Figure 5. PCI vs. Unfunded Backlog for Maintain PCI at 80 ($1.7 million /year)
$30
$' H $20
0 0
m—
d
$10
$0
85 85 85 84 82 81 80
$15.9 $15.5 $15.1
$14.7 $13.9 $13.7
$12.7
P .
yr �' � �; "e ..., ?• 5' �; . ,
11
N�
80
70 m
a
60
0
50 a
40 0
30
20 a
10
0
2011 2012 2013 2014 2015 2016 2017
Year
]Unfunded Backlog Pavement Condition Index
Nichols Consulting Engineers, Chtd. 16
Scenario 3: Existing Budget ($850,000 1year)
In this scenario, the average PCI will deteriorate to approximately 76 from its current level of 84.
Pavements in this category are still in "Good" condition. Not only does the pavement condition
deteriorate but the unfunded backlog grows from $17.7 million to $20.5 million by 2017. What
this implies is that the City is "not catching up" with the increasing number of streets that are
deteriorating.
Table 10. Summary of Results for Scenario 3 - Existing Budget
$30
c H $20
Y C
0 m ._
m =
d�
a
� =$10
$0
Figure 6. PCI vs. Unfunded Backlog for Existing Budget ($850,000 /year)
84 83 82 81
79 78 76
$18.8 $19.2 $20.2 $20.
$18.1
$16.9
$17.4
2011 2012 2013 2014 2015 2016 2017
Year
Unfunded Backlog st, PaNement Condition Index
100
ME
80
a
70 d
60
c
0
50
D
40 0
30 a
E
m
20
a
10
n
Nichols Consulting Engineers, Chtd. 17
Discussion
Figure 7 illustrates the change in PCI over time for the different budget scenarios. Note that in
the unconstrained funding scenario, the PCI will gradually deteriorate to 86 after seven years.
This is due to the cyclical nature of preventative maintenance treatments that are applied once
every 5 to 7 years. By comparison, the existing budget will result in a drop of the PCT to 76 by
2017.
Figure 7. Pavement Condition Index for Each Scenario
100
95
90
85
IL) so
75
70
65
60
0Unconstrained Budget Maintain PCI at 80
-10-0Ebsting Budget Do Nothing
2010 2011 2012 2013 2014 2015 2016 2017
Year Ending
Nichols Consulting Engineers, Chtd. 18
97
95
93
91
85
85
85
89
84
88
3
82
86
82
84
84
81
1
82
79
80
80
78
76
76
75
73
0Unconstrained Budget Maintain PCI at 80
-10-0Ebsting Budget Do Nothing
2010 2011 2012 2013 2014 2015 2016 2017
Year Ending
Nichols Consulting Engineers, Chtd. 18
Figure 8 below illustrates the change in unfunded backlog over time for the different budget
scenarios. Note that the unconstrained budget has no unfunded backlog.
Figure 8. Effect of Different Scenarios on Unfunded Backlog
Nichols Consulting Engineers, Chtd. 19
$20.2, $20.5`
o
x$16.9.
$17.4.
$18.1;
$18.8
$19.2:
-
30
R
d
R
41 CO
S
w
�
5 �,,
a� - r t •
'�
20
�
$15.50
: •
$14 .70
..
c -`'';
l $13.70
$15.90
::
$15.10
$13.90
$12.70,
10
Existing Budget`
1 4
Maintain PCI at 80
0
2011
2012
2013
2014 2015
2016
2017
Unconstrained
Year
❑Unconstrained Budget
❑Maintain PCI at 80
®Existi ng Budget
Nichols Consulting Engineers, Chtd. 19
Figure 9. Percentage of Road Network Area of Each
Condition Category for Different Budget Scenarios
Current Conditions —2010
Very Poor
Poor 10%
Fair 0%
Poor 0%
1%
Very Poor
Fair 14 %r °y t �'
FS+ ..•£ 4'a E a J •; : �. ~. wry„ }
• �'ri. °�t. :� ., a, GoodNe Good °� x'•
.Z, GoodNery Good 90%
`.• 80% a ,'
Scenario 3: Existing Budget — 2017 Scenario 2: Maintain PCI at 80 - 2017
Figure 9 (above) illustrates the change in the percentage of the road area within each condition
category for the different budget scenarios. With Scenario 3 (Existing Budget), the "Very Poor"
category increases to 14% from the current 11 %. But with $ 1.7 million/year (Maintain PCI at
80), the "Good" and "Very Good" category increases to 90% from the current 75 %.
Nichols Consulting Engineers, Chtd. 20
Conclusions
The City of Seal Beach has a substantial investment in their street network as evidenced by the
replacement cost of approximately $99.1 million. The network average PCI of the City is 84.
Overall, 75 % of the City's street network is in the "Good" and "Very Good" condition category.
In the meantime, about 17% of the streets are in "Poor" or "Very Poor" condition category. This
requires a significant amount of money to bring them into the "Good" condition category. If
sufficient funding is unavailable for street maintenance, the average PCI of the network is
expected to decrease, and the unfunded backlog will increase. The higher backlog will result in
increased future costs as more capital intensive treatments (such as reconstruction) will be
necessary as streets are deferred where less expensive treatments (such as surface seals or
overlays) are currently feasible.
Our analyses indicate that the City needs to spend $18.9 million in pavement maintenance and
rehabilitation in the next seven years, in order to eliminate the unfunded backlog. By doing so,
many streets then can be maintained in good condition with on -going preventive maintenance.
This will eventually save money by avoiding reaching the level of major rehabilitation (such as
reconstruction) until the end of the pavement's service life.
a. Pavement Budget
The City's current budget for pavement maintenance and rehabilitation is $5.95 million for next
seven years. At this budget level, the network average PCI is expected to decrease from the
current level of 84, which is in "Good" condition category, to 76. In addition, 15% of the
network will fall in the "Poor" and "Very Poor" category.
As a minimum, we suggest that the City of Seal Beach consider increasing pavement
expenditures to achieve the following objectives:
• To preserve and improve pavements in the "Good" category
• Reduce the percentage of pavements in the "Poor" and "Very Poor" categories
• Maintain the average PCI at 80
Note too that the new Measure M2 guidelines recently adopted by OCTA allow for a 10%
reduction in matching funds if one of the following conditions are met:
a. Shows measurable improvement of paved road conditions during the previous reporting
period defined as an overall weighted (by area) average system improvement of one
Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area)
average PCI in the Master Plan of Arterial Highways (MPAH) or local street categories;
-or -
b. Have road pavement conditions during the previous reporting period within the highest
20% of the scale for road pavement conditions in conformance with OCTA Ordinance No.
3 defined as a PCI of 75 or higher.
Nichols Consulting Engineers, Chtd. 21
In terms of priorities, the City should:
a. Fully fund all preventive maintenance activities.
b. "Package" surface seal projects to produce cost effective bids.
c. Apply sufficient stop gap funds to streets that are deferred.
Examples of other sources of funding include:
• Assessment districts
• Local Transportation Bond
• Developers' fees
• Parking fees
• Truck impact fees
b. Pavement maintenance strategies
The City's pavement maintenance strategies include slurry seals, overlays and reconstruction. It
is tempting to invest in the worst streets and only fund overlay or reconstruction projects.
However, it is equally important to preserve good pavements. Crack sealing, one of the least
expensive treatments, can keep moisture out of pavements and prevent the underlying aggregate
base from premature failures. Surface seals are also cost - effective for pavements currently in
good condition. Therefore, we recommend that the City continues its preventive maintenance
program to preserve the good pavements.
In addition, other strategies such as cold -in -place recycling or full depth reclamation should be
considered when considering rehabilitation treatments. These may save the city significant
amounts over more conventional treatments.
c. Maintenance and rehabilitation decision trees
The maintenance and rehabilitation decision trees and the associated unit costs should be
reviewed and updated annually to reflect new construction techniques /repairs and changing costs
so the budget analysis results can be reliable and accurate.
d. Pavement Management Program Update
OCTA requires cities submitting pavement rehabilitation projects for Measure M funding to
utilize a Pavement Management Program (PMP). This includes updating the condition for all
MPAH streets every two years, and non -MPAH streets every six years.
We recommend that the City of Seal Beach comply with the above requirements so as not to
jeopardize any federal, state or local transportation funds. This is particularly critical since
significant funding increases are needed to maintain the pavement network in "good" condition.
Nichols Consulting Engineers, Chtd. 22
Section 1
Street Inventory and PCI Report
City of Seal Beach
Street Inventory and PCI Report
6/16/2010
10TH
S /OCEAN N /ELECTRIC
2
950
40
38,000
E
AC
100
5/8/2010
10TH
S /SEAL N /OCEAN
2
210
25
5,250
E
AC
44
5/8/2010
11TH
S /ELECTRIC N /PCH
2
660
40
26,400
E
AC
95
5/8/2010
11TH
S /ELECTRIC N /LANDING
2
210
37
7,770
E
AC
40
5/8/2010
11TH
S /SEAL N /OCEAN
2
210
25
5,250
E
AC
89
5/8/2010
11TH
S /OCEAN N/ ELECTRIC
2
900
40
36,000
E
AC
100
5/8/2010
12TH
S /ELECTRIC N /PCH
2
860
37
31,820
E
AC
100
5/8/2010
12TH
S/ OCEAN N/ ELECTRIC
2
810
40
32,400
E
PCC
97
5/8/2010
12TH
S /SEAL N /OCEAN
2
210
24
5,040
E
AC
86
5/9/2010
13TH
S /ELECTRIC N /PCH
1
960
21
20,160
E
AC
48
5/9/2010
13TH
S/ OCEAN N/ ELECTRIC
2
710
40
28,400
E
AC
100
5/11/2010
13TH
S /SEAL N /OCEAN
2
210
25
5,250
E
AC
87
5/11/2010
14TH
S /ELECTRIC N /PCH
2
1,010
21
21,210
E
AC
37
5/9/2010
14TH
S/ OCEAN N/ ELECTRIC
2
660
40
26,400
E
AC
100
5/11/2010
14TH
S /SEAL N /OCEAN
2
210
25
5,250
E
AC
92
5/11/2010
15TH
S /ELECTRIC N /PCH
1
1,110
21
23,310
E
AC
34
5/9/2010
16TH
S /ELECTRIC N /PCH
2
1,160
21
24,360
E
AC
47
5/9/2010
17TH
S /ELECTRIC N /PCH
1
1,260
21
26,460
E
AC
47
5/9/2010
1ST
S /OCEAN N /MARINA
2
1 887
40
35,480
E
AC
100
5/24/2010
1ST
N /PCH 597NE /PCH
2
597
24
14,328
E
AC
56
5/11/2010
1ST
S /MARINA N /PCH
2
2,172
23
49,956
E
AC
68
5111/2010
1ST
S/ PCH N/ MARINA
2
2,172
22
47,784
E
AC
78
5/11/2010
2ND
S/ OCEAN N/ CENTRAL
2
860
40
34,400
E
AC
98
5/11/2010
3RD ST
S/ OCEAN N/ CENTRAL
2
760
40
30,400
E
AC
100
5/11/2010
4TH ST
S/ OCEAN N/ MARINA
2
1,200
40
48,000
E
AC
98
5/11/2010
5TH
S /MARINA N /PCH
4
660
60
39,600
E
AC
90
5/8/2010
5TH
S /OCEAN N /MARINA
2
1,400
40
56,000
E
AC
100
5/8/2010
6TH
S /OCEAN N /ELECTRIC
2
1,300
40
52,000
E
AC
100
5/24/2010
7TH
S /ELECTRIC N /MARINA
2
210
40
8,400
E
AC
100
5/24/2010
7TH
S /OCEAN N /ELECTRIC
2
1,280
40
51,200
E
AC
100
512412010
8TH
S /ELECTRIC N /PCH
2
460
40
18,400
E
AC
100
5/24/2010
8TH
S /OCEAN N /ELECTRIC
2
1,150
40
46,000
E
AC
100
5/24/2010
ADOLFO LOPEZ
WEND 425 E/SEAL BEACH
2
800
60
48,000
E
AC
86
5/9/2010
ADOLFO LOPEZ
MEAL BEACH 425 W /SEAL BEACH
2
425
60
25,500
E
AC
65
5/9/2010
AGUA
S/ MARLIN WEND
2
220
27
5,940
E
AC
93
5111/2010
ALMOND
IE /OLEANDER IMASTER
2
4,390
1 36
158,040
C
AC
92
518/2010
ALMOND
E/ VIOLET JE EDGE ROSE CIR
2
765
1 37
28,305
C
AC
97
5/9/2010
Nichols Consulting Engineers, Chtd. Page 1 of 6
City of Seal Beach
Street Inventory and PCI Report
6/16/2010
-
oi
ALMOND E EDGE ROSE CIR W/ OLEANER
2
705
37
26,085
C
AC
100
5/912010
ASTER S/ ALMOND N/ BIRCHWOOD
2
1,239
37
45,843
E
AC
89
5/9/2010
ASTER N/ BIRCHWOOD N/ CANDLEBERRY
2
206
37
7,622
E
AC
100
5/9/2010
AVALON S/ CATALINA WEND
2
430
33
14,190
E
AC
100
5/11/2010
BALBOA S /BOLSA N /CATALINA
2
1,060
37
39,220
C
I AC
36
5/11/2010
BALBOA S /PCH N /BOLSA
2
660
37
24,420
E
AC
44
5/11/2010
BANYAN E /CAMELIA W /COLUMBINE
2
600
33
19,800
E
AC
97
5/9/2010
BASSWOOD E /ASTER W /LAMPSON
2
410
36
14,760
C
AC
100
5/9/2010
BAYOU E /BAYSIDE W /HARBOR
2
630
33
20,790
E
AC
100
5/9/2010
BAYSIDE S /BOLSA N /CRESTVIEW
2
1,410
33
46,530
C
AC
100
5/8/2010
BEACHCOMBER S /BOLSA N /SEA BREEZE
2
1,160
33
38,280
E
AC
100
5/8/2010
BERYL COVE S/ EMERALD COVE N/ MARLIN
2
360
33
11,880
E
AC
100
5/11/2010
BEVERLY MANOR W /SEAL BEACH 76 MEAL BEACH
2
760
42
31,920
E
AC
100
5/24/2010
BEVERLY MANOR 76 E /SEAL BEACH WEND
2
3,300
25
82,500
E
AC
100
5124/2010
BIRCHWOOD E/ OLEANDER WASTER.
2
3,660
33
120,780
E
AC
100
5/11/2010
BLUE BELL S /ALMOND N /BIRCHWOOD
2
710
33
23,430
E
AC
87
5/9/2010
BOLSA E /SEAL BEACH W /MAIN
2
1 2,810
37
103,970
A
AC
58
5/11/2010
CAMELIA S /ALMOND N /BANYAN
2
590
1 33
19,470
E
AC
91
5/9/2010
CANDLEBERRY E /FUCHSIA W /LAMPSON
2
2,210
36
79,560
E
AC
100
5/24/2010
CANDLEBERRY E /MARIGOLD W /FUCHSIA
2
1,560
37
57,720
E
AC
100
5/24/2010
CANDLEBERRY ENVISTERIA W/OLEANDER
2
1,660
33
54,780
E
AC
92
5/8/2010
CARAVEL S/ MARINA N/ CORSAIR
2
360
37
13,320
E
AC
100
5/11/2010
CARMEL E/ SURF W/ COASTLINE
2
360
37
13,320
E
AC
100
5/11/2010
CARNATION S /ALMOND WEND
2
230
33
7,590
E
AC
89
5/8/2010
CATALINA E /BALBOA W /COASTLINE
2
1,910
37
70,670
C
AC
94
5/11/2010
CATALINA E /END W /BALBOA
2
2,470
37
91,390
C
AC
100
5/9/2010
CENTRAL E/12TH MAIN
2
860
40
34,400
C
AC
100
5/24/2010
CENTRAL E/1 ST W /2ND
1
260
20
5,200
C
AC
100
5/24/2010
CENTRAL E /2ND W /MAIN
2
2,160
1 40
86,400
C
AC
100
5/24/2010
CENTRAL WY E/ 2ND W/ 1ST
2
260
40
10,400
E
AC
97
5/11/2010
CENTRAL WY E/ 4TH W/ 2ND
2
560
38
21,280
E
AC
99
5/11/2010
CENTRAL WY E/ 5TH W/ 4TH
2
260
38
9,880
E
AC
100
5/11/2010
CLIPPER E/ CARAVEL W/ ELECTRIC
2
910
33 1
30,030
E
AC
87
5/11/2010
CLOVER S/ALMOND WEND
2
130
33
4,290
E
AC
81
5/8/2010
COASTLINE S /CARMEL WEND
2
480
27
12,960
E
AC
92
5/8/2010
COASTLINE E /CARMEL IMBALBOA
2
2,380
33
78,540
C
AC 1
95
5/8/2010
COLLEGE PARK E /HARVARD W /HARVARD
2
2,590
37
95,830
C
AC
94
5/8/2010
Nichols Consulting Engineers, Chtd. Page 2 of 6
City of Seal Beach
Street Inventory and PCI Report
6/16/2010
- . -
COLLEGE PARK
E/HARVARD W /CITY LIMIT
2
940
44
41,360
E
AC
1 88
D.
5/812010
COLUMBINE
S /ALMOND N /BANYAN
2
210
33
6,930
E
AC
97
5/8/2010
CORAL
E/ END W/ BAY VIEW
2
230
27
6,210
E
AC
100
5/11/2010
CORSAIR
S /CARAVEL N /SCHOONER
2
1,020
33
33,660
E
AC
99
5/8/2010
CREST
S /CATALINA N /CRESTVIEW
2
210
33
6,930
E
AC
100
5/8/2010
CRESTVIEW
E/ CATALINA W/ AVALON
2
3,060
33
100,980
E
AC
100
5/11/2010
CRYSTAL
S/ CRYSTAL COVE WEND
2
240
27
6,480
E
AC
100
5/11/2010
CRYSTAL COVE
E/ MARBLE COVE W/ OPAL COVE
2
520
33
17,160
E
AC
100
5/11/2010
DAFFODIL
S /ALMOND WEND
2
230
33
7,590
E
AC
85
5/8/2010
DAHLIA
S /ALMOND WEND
2
230
33
7,590
E
AC
95
518/2010
DAISY
S /ALMOND N /BIRCHWOOD
2
410
33
13,530
C
AC
91
5/8/2010
DAISY
S /CANDLEBERRY N /DOGWOOD
2
210
33
6,930
E
AC
73
5/8/2010
DAISY CIRCLE
S /FIR WEND
2
230
33
7,590
E
AC
87
5/8/2010
DARTMOUTH
E/END W /HARVARD
2
180
34
6,120
E
AC
85
51812010
DOGWOOD
E /DAISY W/IRONWOOD
2
1,470
33
48,510
E
AC
93
5/8/2010
DOGWOOD
E /MARIGOLD W /FUCHSIA
2
1,520
33
50,160
E
AC
91
5/8/2010
DOGWOOD
E/WISTERIA W /OLEANDER
2
1,710
33
56,430
E
AC
72
5/8/2010
DOLPHIN
S /SEAL WAY N/ OCEAN
2
226
24
5,424
E
AC
87
5/8/2010
DOLPHIN
N/ OCEAN N/ ELECTRIC
2
582
24
13,968
E
AC
100
5/8/2010
DORY
S /GALLEON N /SCHOONER
2
360
28
10,080
E
AC
93
5/8/2010
DRIFTWOOD
E /BALBOA W /COASTLINE
2
1,460
33
48,180
E I
AC
100
5/8/2010
EBBTIDE
S/ COASTLINE N/ END
2
230
27
6,210
E
AC
100
5/11/2010
ELDER
E /FUCHSIA W/IRONWOOD
2
1,490
36
53,640
E
AC
100
5/24/2010
ELDER
E /OLEANDER W /FUCHSIA
2
1,790
36
64,440
E
AC
84
5/8/2010
ELDER
ENIOLET W /PRIMROSE
2
1,380
33
45,540
E
AC
93
5/8/2010
ELECTRIC
E/ 5TH W/ CORSAIR
2
510
37
18,870
A
AC
93
5/8/2010
ELECTRIC
E /CORSAIR WEND
2
380
33
12,540
A
AC
95
5/8/2010
ELECTRIC
E/SEAL BEACH 19 MEAL BEACH
2
190
34
6,460
A
AC
92
5/8/2010
ELECTRIC N
E /MAIN W /6TH
1
960
27
25,920
A
AC
50
5/8/2010
ELECTRIC N
E /SEAL BEACH MAIN
1
2,410
27
65,070
A
AC
66
5/8/2010
ELECTRIC S
E /6TH W /MAIN
1
910
25
22,750
A
AC
93
5/8/2010
ELECTRIC S
E /SEAL BEACH W /MAIN
1
2,360
25
59,000
A
AC
48
5/8/2010
EMERALD COVE
E/ BERYL COVE W/ JADE COVE
2
580
33
19,140
E
AC
100
5/11/2010
EMERALD PL
S/ EMERALD COVE WEND
2
230
27
6,210
100
5/11/2010
FATHOM
E /SILVER SHOALS W /BALBOA
2
810
33
26,730
100
5/8/2010
FERN
S/ALMOND WEND
2
230
33
7,590
JEA
94
5/8/2010
FIR
E /GOLDENROD W/IRONWOOD
2
1,460
33
48,180
100
5/24/2010
Nichols Consulting Engineers, Chtd. Page 3 of 6
City of Seal Beach
Street Inventory and PCI Report
6/16/2010
FIR
E /ROSE W /HEATHER
2
1,260
33
41,580
C
AC
75
5/8/2010
FIR
E /SUNFLOWER W /ROSE
2
330
33
10,890
C
AC
100
5/24/2010
FIR
E/WISTERIA !W/SUNFLOWER
2
1,220
33
40,260
C
AC
100
5/24/2010
FIR CIRCLE
S /FIR WEND
2
130
60
7,800
E
AC
100
6/16/2010
FUCHSIA
S /BIRCHWOOD WELDER
2
640
33
21,120
C
AC
100
5/24/2010
FUCHSIA CIRCLE
S /FIR WEND
2
330
33
10,890
E
AC
100
5/24/2010
GALLEON
S /ELECTRIC N /DORY
2
970
33
32,010
E
AC
92
5/8/2010
GOLDENROD
S /ALMOND WEND
2
230
33
7,590
E
AC
95
5/8/2010
GOLDENROD
S /ELDER WEND
2
610
33
20,130
E
AC
100
5/24/2010
GUAVA
E/IRONWOOD WEND
2
530
33
17,490
E
AC
100
1 6/16/2010
GUAVA
E /PANSY W/HEATHER
2
1 1,360
33
44,880
E
AC
79
5/8/2010
HARBOR
S /BAYSIDE N /BAYOU
2
760
33
25,080
E
AC
37
5/8/2010
HARVARD
S /COLLEGE PARK WEND
2
3,310
37
122,470
C
AC
91
5/8/2010
HAZELNUT
S /GUAVA N/HEATHER
2
1,210
33
39,930
E
AC
100
5/24/2010
HAZELNUT
E/HEATHER W /ROSE
2
1,610
33
53,130
E
AC
81
5/8/2010
HAZELNUT
E/WISTERIA W /SUNFLOWER
2
1,310
33
43,230
E
AC
1 60
5/8/2010
HEATHER
S /ALMOND WEND
2
1 230
33
1 7,590
E
AC
95
5/8/2010
HEATHER
S /ELDER N /HAZELNUT
2
790
37
29,230
C
AC
77
5/8/2010
HEATHER
S /HAZELNUT N /LAMPSON
2
490
37
18,130
C
AC
100
5/8/2010
IRIS
S /ALMOND WEND
2
230
33
7,590
E
AC
90
5/8/2010
IRIS
HAZELNUT AVE IRONWOOD AVE
2
226
32
7,232
E
AC
56
1 5/8/2010
IRONWOOD
S /CANDLEBERRY N/HEATHER
2
2,491
33
82,203
E
AC
50
5/8/2010
IRONWOOD
E /ROSE W/IRIS
2
1,420
33
46,860
E
AC
72
5/8/2010
IRONWOOD
E/ WISTERIA W/ TULIP
2
322
37
11,914
E
AC
29
5/8/2010
IRONWOOD
W/ TULIP W1 SUNFLOWER
2
1,020
37
37,740
E
AC
50
5/8/2010
ISLAND VIEW
S /BOLSA N /SEA BREEZE
2
1,110
33
36,630
E
AC
100
5/8/2010
JADE COVE
S/ EMERALD COVE N/ MARLIN
2
360
33
11,880
E
AC
100
5/11/2010
JASMIN
S /ALMOND WEND
2
230
33
7,590
E
AC
95
5/8/2010
LAGUNA
0 S/ MARLIN 0 N/ END
2
380
27
10,260
E
AC
100
5/11/2010
LAMPSON
W/ BASSWOOD 200 E/ 0 BASSWOOD
4
200
56
11,200
A
AC
100
5/8/2010
LAMPSON
E /BASSWOOD W/ SEAL BEACH
4
3,300
60
198,000
A
AC
92
5/8/2010
LAMPSON
E/ E CITY LIMIT 200 E/ BASSWOOD
4
7,200
60
432,000
A
AC
96
5/9/2010
LANDING
E /12TH W /11TH
2
260
42
10,920
E
AC
70
5/9/2010
LANDING
E /SEAL BEACH W /12TH
2
1 1,210
21
1 25,410
E
AC
27
5/15/2010
LOYOLA PLAZA
S /COLLEGE PARK WEND
2
330
25
1 8,250
E
AC
90
5/9/2010
MAIN
IS/ELECTRIC N /PCH
2
1
690
55
37,950
A
AC
46
5/11/2010
MAIN IS/OCEAN
AVE N /ELECTRIC
2
1,190
57
1 67,830
A
AC
79
5/1112010
Nichols Consulting Engineers, Chtd. Page 4 of 6
City of Seal Beach
Street Inventory and PCI Report
6/16/2010
MAR VISTA
E/ CATALINA
W/ COASTLINE
2
1,610 33 53,130
E
AC
100
5/9/2010
MAR VISTA
1WICOASTLINE
PCH
2
123 36 4,428
E
AC
100
5/9/2010
MARBLE COVE
S/ CRYSTAL COVE
N/ MARLIN
2
360 33 11,880
E
AC
100
5/11/2010
MARIGOLD
S /BIRCHWOOD
N /CANDLEBERRY
2
160 33 5,280
E
AC
69
5/9/2010
MARIGOLD
S /CANDLEBERRY
N /DOGWOOD
2
1 160 33 1 5,280
E
AC
90
5/9/2010
MARINA
E /PCH
6TH
3
629 61 1 38,369
E
AC
42
5/11/2010
MARINA
E/ 6TH
W/ W CITY LIMIT
2
2,219 50 110,950
E
AC
97
5/11/2010
MARINE
E /ELECTRIC
W /DOLPHIN
1
320 24 7,680
E
AC
100
5/9/2010
MARLIN
E /SEAL BEACH
W /BALBOA
2
1,610 37 59,570
E
AC
88
5/9/2010
NEPTUNE
S /SEAL
N /OCEAN
2
210 24 5,040
E
AC
85
5/9/2010
OCCIDENTAL
E! STANFORD
W/ HARVARD
2
160 33 5,280
E
AC
82
5/11/2010
OCEAN
E /ELECTRIC
W/MAIN
2
2,440 51 124,440
A
AC
100
5/9/2010
OCEAN
E /MAIN
W 11ST
2
2,490 52 129,480
A
AC
100
5/9/2010
OLD RANCH PARKWAY
200 W/ SEAL BEACH
720 W/ SEAL BEACH
3
520 48 24,960
A
AC
71
5/9/2010
OLD RANCH PARKWAY
W/ SEAL BEACH
W /SEAL BEACH
4
200 64 12,800
A
AC
59
5/9/2010
OLD RANCH PARKWAY
720 W/ SEAL BEACH
W/ 22 FWY
2
1,030 34 35,020
A
AC
41
5/9/2010
OLEANDER
S /ALMOND
N /FIR
2
1,320 36 47,520
E
AC
90
5/9/2010
OPAL COVE
S/ CRYSTAL COVE
N/ MARLIN
2
360 33 11,880
E
AC
100
5/11/2010
PANSY
S/ ALMOND
N/ END
2
430 33 14,190
E
AC
95
5/9/2010
PANSY
S /FIR
N /GUAVA
2
160 33 5,280
E
AC
81
5/9/2010
PRIMROSE
S /DOGWOOD
WELDER
2
210 33 6,930
E
AC
94
5/9/2010
PRIMROSE CIR
S/ ALMOND
WEND
2
430 33 14,190
E
AC
100
5/11/2010
PRINCETON
E /END
W /HARVARD
2
230 30 6,900
E
AC
84
5/9/2010
PURDUE CIRCLE
S/ END
N/ COLLEGE PARK
2
68 27 1,836
E
AC
71
5/9/2010
RIVIERA
S /MARLIN
N /BOLSA
2
560 31 17,360
E
AC
89
5/11/2010
ROSE
S/ ALMOND
WEND
2
430 33 14,190
C
AC
100
5/9/2010
ROSE
S /FIR
N /HAZELNUT
2
390 37 14,430
C
AC
81
5/9/2010
ROSE
S/HAZELNUT
N /LAMPSON
2
440 37 16,280
C
AC
68
5/9/2010
ROSSMOOR CTR
E /SEAL BEACH
W/ WEST RD
2
864 30 25,920
C
AC
95
5/11/2010
ROSSMOOR CTR
E/ WEST RD
W/ MONTECITO
2
364 28 10,192
E
AC
30
5/11/2010
SAND PIPER
S /BOLSA
N/TAPER
2
1,110 33 36,630
E
AC
35
5/9/2010
SCHOONER
E /GALLEON
W /DORY
2
660 33 21,780
E
AC
95
5/9/2010
SEA BREEZE
S /BOLSA
N /CATALINA
2
1,160 33 38,280
E
AC
100
5/9/2010
SEAL
E/ 11TH
W/ 10TH
1
290 15 4,350
E
PCC
84
5/11/2010
Nichols Consulting Engineers, Chtd. Page 5 of 6
City of Seal Beach
Street Inventory and PCI Report
6/16/2010
SEAL BEACH
S /PCH
N /BOLSA
6
1,640
97
159,080
A
AC
100
5/24/2010
SEAL BEACH
S /BOLSA
N /ADOLFO LOPEZ
2
3,320
99
328,680
A
AC
98
5/11/2010
SEAL BEACH
S /ADOLFO LOPEZ
NMESTMINSTER
6
4,080
98
399,840
A
AC
90
5/11/2010
SEAL BEACH
SMESTMINSTER
N /BEVERLY MANOR
6
4,536
95
430,920
A
AC
91
5/11/2010
SEAL BEACH
OLD RANCH PKY
0 N/ LAMPSON
6
833
89
74,137
A
AC
94
5/11/2010
SEAL BEACH
S/ LAMPSON
ST. CLOUD DR
6
915
77
70,455
A
AC
85
5/11/2010
SEAL BEACH
ST. CLOUD DR
PLYMOUTH
6
1,491
77
114,807
A
AC
94
5/11/2010
SEAL BEACH
S /ROSSMOOR
N /BRADBURY
6
1,040
97
100,880
A
AC
94
5/11/2010
SEAL BEACH BLVD
S /ELECTRIC
N /PCH
1
1,510
40
60,400
A
AC
83
5/11/2010
SEAL WAY
E /ELECTRIC
W /14TH
1
1,240
13
16,120
E
PCC
93
5/5/2010
SEAL WAY
E /14TH
W /11TH
1
920
12
11,040
E
AC
100
5/24/2010
SILVER SHOALS
S /BOLSA
N /FATHOM
2
300
33
9,900
E
AC
42
5/9/2010
SOUTH SHORE
S /BOLSA
N/TAPER
2
1,060
33
34,980
E
AC
29
519/2010
STANFORD
N /COLLEGE PARK
W /COLLEGE PARK
2
1,860
32
59,520
E
AC
96
5/9/2010
SUNFLOWER
S/ ALMOND
WEND
2
430
33
14,190
E
AC
100
5/9/2010
SUNFLOWER
S /FIR
N /IRONWOOD
2
560
37
20,720
E
AC
78
5/9/2010
SURF
S/ CATALINA
WEND
2
480
33
15,840
E
AC
100
5/11/2010
TAPER
S /BOLSA
N /CATALINA
2
1,110
33
36,630
E
AC
38
5/9/2010
TEABERRY
S/ ALMOND
WEND
2
430
33
14,190
E
AC
100
5/11/2010
TULIP
S /IRONWOOD
N /LAMPSON
2
70
36
2,520
E
AC
100
5/24/2010
VIOLET
S/ ALMOND
N/ CANDLEBERRY
2
660
33
21,780
E
AC
100
5/9/2010
VIOLET
S /ELDER
NOR
2
160
33
5,280
E
AC
53
5/9/2010
WESTMINSTER
W /CITY LIMIT
E /SEAL BEACH
4
4,360
79
344,440
A
AC
69
5/9/2010
WESTMINSTER
E /BOLSA CHICA
MEAL BEACH
4
10,610
72
763,920
A
AC
40
5/9/2010
WISTERIA
S /DOGWOOD
N /IRONWOOD
2
990
37
36,630
C
AC
95
5/9/2010
WISTERIA
S /END
N /DOGWOOD
2
1,040
33
34,320
E
AC
97
5/9/2010
YALE
E /COLLEGE PARK
W /COLLEGE PARK
I WIYALE
2
1,160
33
38,280
E
AC
93
5/9/2010
YALE CIRCLE
E /END
2
130
48
6,240
E
AC
93
5/9/2010
Note:
1. "FC" is Functional Class
A - Arterial
C - Collector
E - Residential
2. "ST" is Surface Type: AC= Asphalt Concrete, PCC = Portland Cement Concrete
Nichols Consulting Engineers, Chtd. Page 6 of 6
Section 2
Maintenance and Rehabilitation History
City of Seal Beach
Maintenance and Rehabilitation History
10TH
S /OCEAN
N /ELECTRIC
950
40
38,000
E
AC
2/1/2000
Overly - AC (Major MR
10TH
S /SEAL
N /OCEAN
210
25
5
E
AC
2/1/2000
Overlay - AC (Major MR
I 1TH
S /ELECTRIC
N /PCH
660
40
26,400
E
AC
1/1/1970
New Construction - initial Major MR
11TH
S /ELECTRIC
N /LANDING
210
37
7,770
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
11TH
S /SEAL
N /OCEAN
210
25
5,250
E
AC
1/1/1970
New Construction - Initial Major MR
12TH
S /ELECTRIC
N /PCH
860
37
31,820
C
AC
1/1/2008
Overlay - AC Major MR)
12TH
S/ OCEAN
N/ ELECTRIC
810
40
32,400
E
JPCCJ
10/1/1997
New Construction - PCC (Major MR
12TH
S /SEAL
N /OCEAN
210
24
5,040
E
AC
1/1/1970
New Construction - Initial Major MR
13TH
S /ELECTRIC
N/PCH
960
21
20,160
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
13TH
S /SEAL
N /OCEAN
210
25
5,250
E
AC
1/l/1970
New Construction - Initial (Major MR
14TH
S /ELECTRIC
N /PCH
1,010
21
21,210
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR)
14TH
S /SEAL
N /OCEAN
210
25
5,250
E
AC
1/1/1970
New Construction - Initial Major MR
15TH
S /ELECTRIC
N /PCH
1,110
21
23,310
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR)
16TH
S /ELECTRIC
N /PCH
1,160
21
24,360
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
17TH
S /ELECTRIC
N /PCH
1,260
21
26,460
E
AC
7/l/1997
Slurry Seal or Chip Seal Global MR
1ST
S /OCEAN
N/MARINA
887
40
35,480
E
AC
5/24/2010
Overlay - AC Major MR
1ST
N /PCH
597NE/PCH
597
24
14,328
E
AC
1/1/1970
New Construction - Initial Major MR
1ST
S/MARINA
N /PCH
2,172
23
49
E
AC
5/l/2003
Slurry Seal or Chip Seal Global MR
1ST
S/ PCH
N/ MARINA
2,172
22
47,784
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
5TH
S /MARINA
N /PCH
660
60
39,600
C
AC
1/1/2010
Slurry Seal or Chip Seal Global MR
5TH
S /OCEAN
N /MARINA
1,400
40
56,000
E
AC
1/1/1970
New Construction - Initial (Major MR)
6TH
S /OCEAN
N /ELECTRIC
1,300
40
52,000
E
AC
5/24/2010
Overlay - AC Major MR
7TH
S /ELECTRIC
N/MARINA
210
40
8,400
E
AC
5/24/2010
Overlay - AC (Major MR
7TH
S /OCEAN
N /ELECTRIC
1,280
40
51,200
E
AC
5/24/2010
Overlay - AC (Major MR
8TH
S /ELECTRIC
N /PCH
460
40
18,400
E
AC
5/24/2010
Overlay - AC Major MR
8TH
S /OCEAN
N /ELECTRIC
1,150
40
46,000
E
AC
5/24/2010
Overlay - AC (Major MR)
ADOLFO LOPEZ
WEND
425 E /SEAL BEACH
800
60
48,000
E
AC
1/1/2007
Overlay - AC (Major MR
ADOLFO LOPEZ
W /SEAL BEACH
425 W /SEAL
BEACH
425
60
25,500
E
AC
1 1/1/2007
Overlay - AC (Major MR
AGUA
S/ MARLIN
N/ END
220
27
5
E
AC
5/l/2004
Overlay - AC (Major MR
ALMOND
&OLEANDER
WASTER
4,390
36
158,040
C
AC
1/1/2008
Slurry Seal or Chip Seal Global MR)
ALMOND
E/ VIOLET
E EDGE ROSE CIR
765
37
28,305
C
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
ALMOND
E EDGE ROSE CIR
W/ OLEANER
705
37
26,085
C JAC
1/1/2008
Slurry Seal or Chip Seal Global MR)
ASTER
S/ ALMOND
N/ BIRCHWOOD
1,239
37
45,843
E
AC
5/1/2003
Slu Seal or Chip Seal Global MR
ASTER
N/ BIRCHWOOD
N/ CANDLEBERRY
206
37
7,622
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
BALBOA
S /BOLSA
N /CATALINA
1,060
37
39,220
C
AC
5/1/2003
Slu rry Seal or Chip Seal Global MR
BALBOA
S /PCH
NBOLSA
660
37
24
E
AC
5/l/2003
1 Slurry Seal or Chip Seal (Global MR)q
6/16/2010
Nichols Consulting Engineers, Chid. Page 1 of 6
City of Seal Beach
Maintenance and Rehabilitation History
BANYAN
E /CAMELIA
W /COLUMBINE
600 33 19,800
E
AC
0
1/1/2009
Slu Seal or Chi Seal Global MR
BASSWOOD
E /ASTER
W /LAMPSON
410 36 14,760
C
AC
10/1/1986
Overla - AC (Major MR
BAYOU
E /BAYSIDE
W /HARBOR
630 33 20,790
E
AC
1/1/2008
Overla - AC Ma'or MR
BAYSIDE
S /BOLSA
N /CRESTVIEW
1,410 33 46,530
C
AC
8/1/1999
Slu Seal or Chi Seal Global MR
BEACHCOMBER
S /BOLSA
N /SEA BREEZE
1,160 33 38,280
E
AC
1/1 /2008
Overlay - AC (Major MR)
BERYL COVE
S/ EMERALD COVE
N/ MARLIN
360 33 11,880
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
BEVERLY
MANOR
W /SEAL BEACH
76 W /SEAL BEACH
760 42 31,920
E
AC
5/24/2010
Overlay - AC (Major MR
BEVERLY
MANOR
76 E/SEAL BEACH
WEND
3,300 25 82,500
E
AC
5/24/2010
Overlay - AC (Major MR
BIRCHWOOD
E/ OLEANDER
W/ ASTER
3,660 33 120,780
E
AC
4/1/1984
New Construction (Major MR
BLUE BELL
S /ALMOND
N /BIRCHWOOD
710 33 23,430
E
AC
1/1/2009
Slur Seal or Chi Seal Global MR
BOLSA
E/SEAL BEACH
W/MAIN
2,810 37 103,970
A
AC
1/1/2006
Slurry Seal or Chi Seal Global MR
CAMELIA
S /ALMOND
N /BANYAN
590 33 19,470
E
AC
1/1/2009
Slurry Seal or Chi Seal Global MR
CANDLEBERRY
E/FUCHSIA
W/LAMPSON
2,210 36 79,560
E
AC
5/24/2010
Overlay - AC (Major MR
CANDLEBERRY
E/MARIGOLD
W /FUCHSIA
1,560 37 57,720
E
AC
5/24/2010
Overlay - AC (Major MR
CANDLEBERRY
E/WISTERIA
W /OLEANDER
1,660 33 54,780
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
CARAVEL
S/ MARINA
N/ CORSAIR
360 37 13
E
AC
1 /1/2010
Slurry Seal or Chip Seal Global MR
CARMEL
E/ SURF
W/ COASTLINE
360 37 13,320
E
AC
5/1/2004
Overlay - AC (Major MR
CARNATION
S /ALMOND
WEND
230 33 7,590
E
AC
1/1/2008
Slurry Seal or Chi Seal Global MR
CATALINA
E/BALBOA
W /COASTLINE
1,910 37 70,670
C
AC
5/1/2003
Slurry Seal or Chi Seal Global MR
CATALINA
WEND
W /BALBOA
2,470 37 91
C
AC
8/11/1999
Slurry Seal or Chi Seal Global MR
CENTRAL
E /12TH
W /MAIN
860 40 34,400
C
AC
5/24/2010
- Overlay - AC (Major MR
CENTRAL
E/1 ST
W /2ND
260 20 5,200
C
AC
5/24/2010
Overlay - AC (Major MR
CENTRAL
E/2ND
W/MAIN
2,160 40 86,400
C
AC
5/24/2010
Overlay -AC (Major MR
CLIPPER
E/ CARAVEL
W/ ELECTRIC
910 33 30,030
E
AC
1/1/2010
Slurry Seal or Chip Seal Global MR
CLOVER
S /ALMOND
WEND
130 33 4,290
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
COASTLINE
S /CARMEL
WEND
480 27 12,960
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
COASTLINE
E/CARMEL
W /BALBOA
2,380 33 78
C
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
COLLEGE PARK
E /HARVARD
W /HARVARD
2,590 37 95,830
C
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
COLLEGE PARK
E/HARVARD
W /CITY LIMIT
940 44 1 41,360
E
AC
1/1/2008
Slu Seal or Chip Seal Global MR
COLUMBINE
S /ALMOND
N /BANYAN
210 33 6,930
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
CORSAIR
S /CARAVEL
N /SCHOONER
1 33 33
E
AC
1/1/2010
Slurry Seal or Chip Seal Global MR
CREST
S /CATALINA
N /CRESTVIEW
210 33 6
E
AC
1/1/2008
Overlay - AC (Major MR
CRESTVIEW
E/ CATALINA
W/ AVALON
3,060 33 100,980
E
AC
5/1/2004
Overlay - AC (Major MR
CRYSTAL
S/ CRYSTAL COVE
N/ END
240 27 6,480
E
AC
5/1/2004
Overlay - AC (Major MR
CRYSTAL COVE
E/ MARBLE COVE
W/ OPAL COVE
1 520 33 17
E
AC
5/1/2004
Overlay - AC (Major MR
6/16/2010
Nichols Consulting Engineers, Chtd. Page 2 of 6
City of Seal Beach
Maintenance and Rehabilitation History
DAFFODIL
S /ALMOND
WEND
230
33
7,590
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR)
DAHLIA
S /ALMOND
WEND
230
33
7,590
E
AC
1/112008
Slurry Seal or Chip Seal Global MR
DAISY
S /ALMOND
N /BIRCHWOOD
410
33
13
C
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
DAISY
S /CANDLEBERRY
N /DOGWOOD
210
33
6,930
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
DAISY CIRCLE
S /FIR
WEND
230
33
7,590
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
DARTMOUTH
E /END
W /HARVARD
180
34
6,120
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
DOGWOOD
E/DAISY
W /IRONWOOD
1,470
33
48,510
E JAC
1/1/2009
Slurry Seal or Chip Seal Global MR
DOGWOOD
E/MARIGOLD
W /FUCHSIA
1,520
33
50,160
E JAC
1/1/2009
Slurry Seal or Chip Seal Global MR
DOGWOOD
E /WISTERIA
W /OLEANDER
1,710
33
56,430
E JAC
1/1/2009
Slurry Seal or Chip Seal Global MR
DOLPHIN
S /SI?AL WAY
N/ OCEAN
226
24
5,424
E JAC
1/1/2008
Slurry Seal or Chip Seal Global MR
DORY
S /GALLEON
N /SCHOONER
360
28
10,080
E I
AC
1/1/2010
Slu Seal. or Chip Seal Global MR
DRIFTWOOD
E/BALBOA
W /COASTLINE
1,460
33
48,180
E
JAC
1/1/2008
Overlay - AC Ma - or MR)
ELDER
E/FUCHSIA
W /IRONWOOD
1,490
36
53,640
E
AC
5/24/2010
Overlay - AC Major MR
ELDER
&OLEANDER
W /FUCHSIA
1,790
36
64
E
AC
1/1/2007
Slurry Seal or Cbip Seal Global MR
ELDER
E/VIOLET
W /PRIMROSE
1,380
33
45,540
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
ELECTRIC
E/ STI -I
W/ CORSAIR
510
37
18
A
AC
1/1/2010
Slu Seal or Chip Seal Global MR
ELECTRIC
E/CORSAIR
WEND
380
33
12,540
A
AC
1 /1/2010
Slurry Seal or Chip Seal Global MR
ELECTRIC
E/SEAL BEACH
19 W /SEAL BEACH
190
34
6,460
A
AC
1/1/1970
New Construction - Initial Major MR
ELECTRIC N
E/MAIN
W /6TH
960
27
1 25,920
A
I AC
1/1/2007
Slurry Seal or Chip Seal Global MR
ELECTRIC N
E/SEAL BEACH
W /MAIN
2
27
65
A
AC
1/1/2007
Slu Seal or Cliip Seal Global MR
ELECTRIC S
E /6TH
W /MAIN
910
25
22,750
A
AC
1/1/2007
Slurry Seal or Chip Seal Global MR
ELECTRIC S
E /SEAL BEACH
W /MAIN
2,360
25
59,000
A
AC
1/1/2007
Slurry Seal or Chip Seal Global MR
EMERALD
COVE
E/ BERYL COVE
W/ JADE COVE
580
33
19,140
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
EMERALD PL
S/ EMERALD COVE
N/ END
230
27
6,210
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
FATHOM
E/SILVER SHOALS
W /BALBOA
810
33
1 26,730
E
JACI
8/12/1999
Slurry Seal or Chip Seal Global MR
FERN
S /ALMOND
WEND
230
33
1 7,590
E
JACI
1/1/2008
Slurry Seal or Chip Seal Global MR
FIR
E/GOLDENROD
WARONWOOD
1,460
33
48,180
E
AC
5/24/2010
Overlay - AC Major MR
FIR
E/ROSE
W /HEATHER
1,260
33
41,580
C
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
FIR
E /SUNFLOWER
W /ROSE
330
33
10,890
C
AC
5/24/2010
Overlay -AC Major MR)
FIR
E /WISTERIA
W /SUNFLOWER
1
33
40,260
C
AC
5/24/2010
Overlay - AC Major MR
FIR CIRCLE
S /FIR
WEND
130
60
7,800
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
FIR CIRCLE
S /FIR
WEND
130
60
7,800
E
AC
6/16/2010
Overlay -AC Major MR
FUCHSIA
SBIRCHWOOD
WELDER
640
33
21,120
C
AC
5/24/2010
Overlay - AC (Major MR
FUCHSIA
CIRCLE
S /FIR
N /END
330
33
10,890
E
AC
5/24/2010
Overlay - AC Major MR
GALLEON
IS/ELECTRIC
IN/DORY
970
33
1 32
E
I AC
1/1/2010
1 Slurry Seal or Chip Seal Global MR
6/16/2010
Nichols Consulting Engineers, Chtd. Page 3 of 6
City of Seal Beach
Maintenance and Rehabilitation History
GOLDENROD
S/ALMOND
N /END
230
33
7,590
E
AC
1/1/2008
Slu Seal or Chip Seal Global MR
GOLDENROD
S /ELDER
N /END
610
33
20,130
E
AC
5/24/2010
Overly - AC Major MR
GUAVA
E/iRONWOOD
W /END
530
33
17
E
AC
8/1/1993
Overly - AC (Major MR
GUAVA
E/IRONWOOD
WEND
530
33
17
E
AC
6/16/2010
Overlay - AC (Major MR
GUAVA
E/PANSY
W /HEATHER
1,360
33
44,880
E
AC
1/1/2009
Slurry Seal or hip Seal Global MR
HARBOR
SBAYSIDE
NBAYOU
760
33
25,080
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
HARVARD
S /COLLEGE PARK
W /END
3,310
37
122,470
C
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
HAZELNUT
S /GUAVA
N /HEATHER
1,210
33
1 39,930
E
AC
5/24/2010
Overly - AC (Major MR
HAZELNUT
&HEATHER
W/ROSE
1
33
1 53,130
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
HAZELNUT
E/WISTERIA
W /SUNFLOWER
1,310
33
43,230
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
HEATHER
S /ALMOND
N /END
230
33
7,590
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR)
HEATHER
S /ELDER
N /HAZELNUT
790
37
29,230
C
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
HEATHER
S /HAZELNUT
N /LAMPSON
490
37
18,130
C
AC
1/1/2008
Overlay AC Ma'or MR
IRIS
S /ALMOND
N/END
230
33
7,590
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
IRIS
HAZELNUT AVE
IRONWOOD AVE
226
32
7,232
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
IRONWOOD
S /CANDLEBERRY
N/HEATHER
2,491
33
82,203
E
AC
10/1/1993
Overly - AC (Major MR)
IRONWOOD
E/ROSE
W /IRIS
1,420
33
46,860
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
IRONWOOD
E/ WISTERIA
W/ TULIP
322
37
11,914
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
IRONWOOD
W/ TULIP
W/ SUNFLOWER
1,020
37
37,740
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
ISLAND VIEW
SBOLSA
N /SEA BREEZE
1,110
33
36,630
E
AC
1/1/2008
Overly - AC (Major MR
JADE COVE
S/ EMERALD COVE
N/ MARLIN
360
33
11,880
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
JASMIN
S /ALMOND
N /END
230
33
7
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
LAGUNA
0 S/ MARLIN
0 N/ END
380
27
10
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
LAMPSON
W/ BASSWOOD
200 E/ O
BASSWOOD
200
56
11,200
A
AC
7/1/2002
Overly - AC (Major MR
LAMPSON
E /BASSWOOD
W/ SEAL BEACH
3,300
60
198,000
A
AC
7/1/2002
Overly - AC (Major MR
LAMPSON
E/ E CITY LIMIT
200 E/ BASSWOOD
7,200
60
432,000
A
AC
7/1/2002
Overly - AC (Major MR
LANDING
E /12TH
W /11TH
260
42
10,920
E
AC
7/1/1997
Sluny Seal or Chi Seal Global MR
LANDING
E /12TH
W /11TH
260
42
10,920
E
AC
7/1/2009
Patching Global MR
LANDING
E /SEAL BEACH
W /12TH
1,210
21
25,410
E
AC
7/1/1997
Slurry Seal or Chip Seal Global MR
LOYOLA PLAZA
S /COLLEGE PARK
N /END
330
25
8,250
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
MAIN
S /ELECTRIC
N /PCH
690
55
37
A
AC
6/1/1995
Overly - AC (Major MR
MAIN
S /OCEAN AVE
N /ELECTRIC
1 190
57
67,830
A
AC
1/1/1970
New Construction - Initial (Major MR
MAR VISTA
W /COASTLINE
PCH
123
36
4 428
E
AC
1/l/1970
New Construction - Initial (Major MR
MARBLE COVE
S/ CRYSTAL COVE
N/ MARLIN
360
33
11
E
AC
5/1/2004
Overly - AC (Major MR
MARIGOLD
S/BIRCHWOOD
N /CANDLEBERRY
160
33
5 1
E I
AC I
1/1/2009
Slurry Seal or Chip Seal Global MR
6/16/2010
Nichols Consulting Engineers, Chtd. Page 4 of 6
City of Seal Beach
Maintenance and Rehabilitation History
MARIGOLD
S /CANDLEBERRY
N /DOGWOOD
160
33
5,280
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
MARINA
E /PCH
6TH
629
61
38,369
E
AC
10/1/1996
Overly - AC Major MR
MARINA
E/ 6TH
W/ W CITY LIMIT
2,219
50
110,950
E
AC
10/1/1996
Overlay - AC Major MR
MARINE
E/ELECTRIC
W /DOLPHIN
320
24
7,680
E
AC
1/1/1970
New Construction - Initial (Major MR
MARLIN
E /SEAL BEACH
W /BALBOA
1,610
37
59,570
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
NEPTUNE
S /SEAL
N /OCEAN
210
24
5,040
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
OCCIDENTAL
I3/ STANFORD
W/ HARVARD
160
33
5,280
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
OCEAN
E/ELECTRIC
W/MAIN
2,440
51
124,440
A
AC
1/1/2007
Overlay - AC Major MR
OCEAN
E /MAIN
W /1ST
2,490
52
129,480
A
JACI
1/1/2007
Overly -AC (Major MR
OLD RANCH
PARKWAY
200 W/ SEAL
BEACH
720 W/ SEAL
BEACH
520
48
24,960
A
AC
1/1/1986
New Construction - Initial (Major MR
OLD RANCH
PARKWAY
W/ SEAL BEACH
W /SEAL BEACH
200
64
12,800
A
AC
1/1/1986
1 New Construction - Initial (Major MR
OLD RANCH
PARKWAY
720 W/ SEAL
BEACH
W/ 22 FWY
1,030
34
35,020
A
AC
1/1/1986
New Construction - Initial (Major MR
OLEANDER
S /ALMOND
N /FIR
1,320
36
47,520
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
OPAL COVE
S/ CRYSTAL. COVE
N/ MARLIN
360
33
11,880
E
AC
5/1/2004
Overly - AC Major MR
PANSY
S/ ALMOND
N/ END
430
33
14,190
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
PANSY
S /FIR
N /GUAVA
160
33
5
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
PRIMROSE
S /DOGWOOD
N /ELDER
210
33
6,930
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
PRIMROSE CIR
S/ ALMOND
N/ END
430
33
14,190
E
AC
1/1/1990
Slurry Seal or Chip Seal Global MR
PRINCETON
E /END
W/HARVARD
230
30
6
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR)
PURDUE
CIRCLE
S/ END
N/ COLLEGE PARK
68
27
1,836
E
AC
1/112008
Slurry Seal or Chip Seal Global MR
RIVIERA
S /MARLIN
N /BOLSA
560
31
17,360
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
ROSE
S/ ALMOND
N/ END
430
33
14,190
C
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
ROSE
S /FIR
N /HAZELNUT
390
37
14,430
C
AC
1/1/2009
Slu rry Seal or Chi Seal Global MR
ROSE
S /HAZELNUT
N /LAMPSON
440
37
16,280
C
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
ROSSMOOR
CTR
E /SEAT. BEACH
W/ WEST RD
864
30
25,920
C
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
SAND PIPER
S /BOLSA
N /PAPER
1,110
33
36,630
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
SCHOONER
E/GALLEON
W /DORY
660
33
21,780
E
AC
1/1/2010
Slurry Seal or Chip Seal Global MR)
SEA BREEZE
S /BOLSA
N /CATALINA
1
33
38
E
AC
1/1/2008
Overly - AC Ma'or MR
SEAL BEACH
S /PCH
N /BOLSA
1,640
97
159,080
A
AC
5/24/2010
Overly - AC Major MR
SEAL BEACH
S /BOLSA
N /ADOLFO LOPEZ
3,320
99
328,680
A
AC
1/1/2008
Overly - AC (Major MR
SEAL BEACH
S /ADOLFO LOPEZ
N /WESTMINSTER
4,080
98
399,840
A
AC
8/1/2000
Overly - AC (Major MR
SEALBEACH
S /WESTMINSTER
N /BEVERLY
MANOR
4,536 1
95 1
430,920 1
A
AC 1
8/1/2000
Overly -AC (Major MR
6/16/2010
Nichols Consulting Engineers, Chtd. Page 5 of 6
City of Seal Beach
Maintenance and Rehabilitation History
SEAL BEACH
OLD RANCH PKY
O N/ LAMPSON
833
89
74 137
A
AC
e
9/1/2003
e
Overlay - AC Ma'or MR
SEAL BEACH
S/ LAMPSON
ST. CLOUD DR
915
77
70,455
A
AC
11/1/1986
Overlay - AC (M ajor MR
SEAL BEACH
ST. CLOUD DR
PLYMOUTH
1,491
77
114 807
A
AC
11/1/1986
Overlay - AC (Ma jor MR
SEAL BEACH
S /ROSSMOOR
N /BRADBURY
1,040
97
100,880
A
AC
11/1/1986
Overlay - AC Ma'or MR
SEAL BEACH
BLVD
S /ELECTRIC
N/PCH
1,510
40
60,400
A
AC
8/1/2001
New Construction - AC (Major MR
SEAL WAY
E/ELECTRIC
W /14TH
1
13
16,120
E
PCC
1/l/1970
New Construction - Initial (Major MR
SEAL WAY
E/14TH
W /11TH
920
12
11,040
E
AC
5/24/2010
Overlay - AC (Major MR
SILVER SHOALS
S /BOLSA
N /FATHOM
300
33
9,900
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
SOUTH SHORE
S /BOLSA
N/TAPER
1
33
34,980
E
AC
8/12/1999
Slurry Seal or Chip Seal Global MR
STANFORD
N /COLLEGE PARK
W /COLLEGE PARK
1,860
32
59,520
E
AC
1 /1/2008
Slurry Seal or Chip Seal Global MR)
SUNFLOWER
S/ ALMOND
N/ END
430
33
14,190
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
SUNFLOWER
S /FIR
N/IRONWOOD
560
37
20,720
E
AC
6/1/1995
Overlay -AC (Major MR)
SURF
S/ CATALINA
N/ END
480
33
15,840
E
AC
5/1/2004
Overlay - AC (Major MR
TAPER
S /BOLSA
N /CATALINA
1,110
33
36 630
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
TEABERRY
S/ ALMOND
N/ END
430
33
14,190
E
AC
1/1/2006
Slurry Seal or Chip Seal Global MR
TULIP
S /IRONWOOD
N /LAMPSON
70
36
2,520
E
AC
5/24/2010
Overlay - AC (Major MR
VIOLET
S/ ALMOND
N/ CANDLEBERRY
660
33
21,780
1 E
JAC
5/1/2003
Slurry Seal or Chip Seal Global MR
VIOLET
S /ELDER
N/FIR
160
33
5,280
E
AC
5/1/2003
Slurry Seal or Chip Seal Global MR
WESTMINSTER
W /CITY LIMIT
E/SEAL BEACH
4,360
79
344,440
A
AC
8/1/1987
Overlay - AC (Major MR)
WESTMINSTER
EBOLSA CHICA
W /SEAL BEACH
10,610
72
763,920
A
AC
10/1/1997
Overlay - AC (Major MR
WISTERIA
S /DOGWOOD
NARONWOOD
990
37
36,630
C
AC
1/1/2009
SEirry Seal or Chip Seal Global MR
WISTERIA
S /END
N /DOGWOOD
1,040
33
34,320
E
AC
1/1/2009
Slurry Seal or Chip Seal Global MR
YALE J E/COLLEGE
PARK
W /COLLEGE PARK
1,160
:::33:]
38,280
E
AC
1/l /2008
Slurry Seal or Chip Seal Global MR
YALE CIRCLE
E/END
W /YALE
130
48
6,240
E
AC
1/1/2008
Slurry Seal or Chip Seal Global MR
Note:
1. "FC" is Functional Class
A - Arterial
C - Collector
E - Residential
2. "ST' is Surface Type: AC= Asphalt Concrete, PCC = Portland Cement Concrete
6/16/2010
Nichols Consulting Engineers, Chtd. Page 6 of 6
Section 3
Sections Selected For Treatment
$850,000 /year (City's Existing Budget)
City of Seal Beach
Sections Selected For Treatment ($850,000 /year, City's Existing Budget)
2011
12TH
IS/SEAL
N /OCEAN
210
24
5 040
E
5/9/2010
86
$1512
Slurry Seal
201113TH
S /SEAL
N /OCEAN
210
25
5,250
E
5/11/2010
87
$1,575
Slurry Seal
2011
ASTER
S/ ALMOND
N/ BIRCHWOOD
1 239
37
45 843
E
5/9/2010
89
$13753
Slurry Seal
2011
CATALINA
E/BALBOA
W /COASTLINE
1,910
37
70 670
C
5/112010
94
$21,201
Slurry Seal
2011
ELECTRIC
E/SEAL BEACH
19 W /SEAT. BEACH
190
34
6,460
A
5/8/2010
92
$1,938
Slurry Seal
2011
FIRCIRCLE
S/FIR
N /END
130
60
7,800
E
5/8/2010
79
$2340
Slurry Seal
2011
HEATHER
S /ELDER
N /HAZELNUT
790
37
29,230
C
5/8/2010
77
$78,921
Slurry Seal
2011
LAMPSON
&BASSWOOD
W/ SEAL BEACH
3,300
60
198 000
A
5/8/2010
92
$59
Slurry Seal
2011
MAIN
S /OCEAN AVE
N/ELECTRIC
1,190
57
67,830
A
5/11/2010
79
$20
Slurry Seat
2011
MARLIN
E/SEAL BEACH
W/BALBOA
1
37
59.570
E
5/9/2010
88
$17,871
Slurry Scal
2011
OLD RANCH
PARKWAY
200 W/ SEAL
BEACH
720 W/ SEAL BEACH
520
1 48
24,960
A
5/92010
71
$67,392
2" AC Overla
2011
PURDUE CIRCLE
S/ END
N/ COLLEGE PARK
68
27
1,836
E
5/92010
71
$4,957
2" AC Overla
2011
RIVIERA
S/MARLIN
N/BOLSA
560
31
17,360
E
5/112010
89
$5,208
Slurry Seal
2011
SEAL BEACH
S /ADOLFO LOPEZ
N/WESTMINSTER
4 080
98
399 840
A
5/112010
90
$119953
Slurry Seal
2011
SEAL BEACH
S/WESTMINSTER
N /BEVERLY MANOR
4
95
430
A
5/112010
91
$129 277
Slurry Seal
2011
SEAL BEACH
OLD RANCH PKY
O N/ LAMPSON
833
89
74
A
5/112010
94
$22,241
Slurry Seal
2011
SEAL BEACH
S/ LAMPSON
ST. CLOUD DR
915
77
70,455
A
5/112010
85
$21,137
Slurry Scal
2011
SEAL BEACH
ST. CLOUD DR
PLYMOUTH
1
77
114,807
A
5/112010
94
$34,442
Slurry Seal
2011
SEAL BEACH
S /ROSSMOOR
N /BRA OURY
1
97
100
A
5/112010
94
$30,264
Slurry Seal
2011
SEAL BEACH BLVD
S /ELECTRIC
N/PCH
1
40
60,400
A
5/112010
83
$115,297
Slurry Seal
2012
1ST
S/ PCH
N/ MARINA
2,172
22
47,784
E
5/112010
77
$135,468
Slurry Seal
2012
CLOVER
S /ALMOND
N/END
130
33
4,290
E
5/82010
81
$11,542
Slurry Seal
2012
DAISY
S /CANDLEBERRY
N/DOGWOOD
210
33
6
E
5/82010
72
$19
2" AC Overla
2012
DOGWOOD
E/WISTERIA
W /OLEANDER
1
33
56,430
E
5/82010
71
$159,979
2" AC Overla
2012
FIR
E/ROSE
W/HEATHER
1
33
41,580
C
5/82010
74
$117
2" AC Overla
2012
GUAVA
E/PANSY
W/HEATHER
1,360
33
44,880
E
5/82010
78
$127235
Slurry Seal
2012
IRONWOOD
E/ROSE
WARIS
1,420
33
46,860
E
5/82010
71
$132,848
2" AC Overla
2012
PANSY
S /FIR
N /GUAVA
160
33
5
E
5/92010
81
$14,205
Slurry Scat
2012
ROSE
S/FIR
N/HAZELNUT
390
37
14,430
C
5/92010
81
$38,823
Slurry Seal
2012
SUNFLOWER
S/FIR
N/IRONWOOD
560
37
20,720
E
5/92010
76
$58,741
Slurry Seal
2013
ADOLFO LOPEZ
WEND
425 E/SEAL BEACH
800
60
48,000
E
5/92010
77
$15,876
Slurry Seal
2013
BOLSA
E/SEAL BEACH
W/MAIN
2,810
37
103
A
5/11/2010
56
$413,391
4" Overlay and
Di outs
2013
ELDER
E /OLEANDER
W/FUCHSIA
1,790
36
64
E
5/82010
83
$21
Slurry Seal
2013
ELECTRIC N
E/SEAL BEACH
W /MAIN
2
27
65,070
A
5/82010
64
$193.697
2" AC Ovcrla
2013
ELECTRIC S
E/6TH
W /MAIN
910
25
22
A
5/82010
93
$7,525
Slurry Seat
2013
HAZELNUT
&HEATHER
W/ROSE
1,610
33
53,130
E
5/82010
80
$157,522
Slurry Seal
2013
PRINCETON
E/END
W /HARVARD
230
30
6,900
E
5/92010
83
$13
Slurry Seal
2014
ALMOND
E/OLEANDER
W /ASTER
4
36
158
C
5/82010
91
$54
Slurry Seal
2014
CARNATION
S /ALMOND
N/END
1 230
33
7 590
E
5/82010
88
$2,636
Slurry Seal
2014
COASTLINE
S /CARMEL
N/END
1 480
27
12
E
5/82010
1 91
$4
Slurry Seal
6/16/2010
Nichols Consulting Engineers, Chtd. page 1 of 3
City of Seal Beach
Sections Selected For Treatment ($850,000 /year, City's Existing Budget)
2014
COLLEGE PARK
E/HARVARD
W /HARVARD
2,590
37
95,830
C
5/8/2010
94
$33,281
SIu Seal
2014
COLLEGE PARK
E/HARVARD
W /CITY LIMIT
940
44
41,360
E
5/8/2010
86
$14 364
Slu Seal
2014
DAFFODIL
S /ALMOND
N/END
230
33
7,590
E
5/8/2010
84
$2,636
Slu Seal
2014
DAISY CIRCLE
S /FIR
N/END
230
33
7,590
E
5/8/2010
86
$2,636
Slu Seal
2014
DARTMOUTH
E/END
W/HARVARD
180
34
6,120
E
5/8/2010
84
$2,125
Slurry Seal
2014
ELECTRIC N
E/MAIN
W /6TH
960
27
25,920
A
5/8/2010
46
$210,544
4" Overlay and
Di outs
2014
FERN
S /ALMOND
N/END
230
33
7,590
E
5/8/2010
94
$2,636
Slurry Seal
2014
HARVARD
S /COLLEGE PARK
WEND
3,310
37
122,470
C
5/8/2010
90
$42,533
Slurry Seal
2014
IRIS
S /ALMOND
N/END
230
33
7,590
E
5/8/2010
89
$2,636
1 Slurry Seal
2014
IRONWOOD
W/ TULIP
W/ SUNFLOWER
1,020
37
37,740
E
5/82010
46
$306,556
4" Overlay and
Di outs
2014
LOYOLA PLAZA
S /COLLEGE PARK
N/END
330
25
8,250
E
5/92010
89
$2,865
Slurry Seal
2014
MARIGOLD
S /BIRCHWOOD
N /CANDLEBERRY
160
33
5
E
5/92010
67
$16,503
2" AC Overla
2014
NEPTUNE
S /SEAL
N /OCEAN
210
24
5,040
E
5/92010
84
$1,750
Slurry Seal
2014
OCCIDENTAL
E/ STANFORD
W/ HARVARD
160
33
5,280
E
5/112010
81
$1,834
Slurry Seal
2014
OLD RANCH
PARKWAY
W/ SEAL BEACH
W /SEAL BEACH
200
64
12,800
A
5/92010
54
$59,958
4" Overlay and
Di outs
2014
YALE
E/COLLEGE PARK
W /COLLEGE PARK
1,160
33
38,280
E
5/92010
92
$13,294
Slurry Seal
2015
BLUEBELL
S /ALMOND
N /BIRCHWOOD
710
33
23
E
5/92010
86
$8,544
Slurry Seal
2015
CAMELIA
S /ALMOND
NBANYAN
590
33
19,470
E
5/92010
90
$7
Slurry Seal
2015
CANDLEBERRY
E/WISTERIA
W /OLEANDER
1
33
54,780
E
5/82010
91
$19,976
Slurry Seal
2015
DAISY
S /ALMOND
NBIRCHWOOD
410
33
13,530
C
5/82010
90
$4,934
Slurry Seal
2015
DOGWOOD
E/DAISY
WARONWOOD
1
33
48,510
E
5/82010
92
$17,689
Slurry Seal
2015
DOGWOOD
E/MARIGOLD
W/FUCHSIA
1,520
33
50,160
E
5/82010
90
$18291
Slurry Seal
2015
ELDER
E/VIOLET
W/PRIMROSE
1
33
45,540
E
5/82010
92
$16606
Slurry Seal
2015
ELECTRIC S
E/SEAL BEACH
W/MAIN
2
25
59,000
A
5/82010
43
$641,360
4" Overlay and
Di outs
2015
MARIGOLD
S /CANDLEBERRY
N/DOGWOOD
160
33
5
E
5/92010
89
$1,925
Slurry Seal
2015
OLEANDER
S /ALMOND
N/FIR
1 320
36
47,520
E
5/92010
89
$17,328
Slurry Seal
2015
PRIMROSE
S /DOGWOOD
WELDER
210
33
6
E
5/92010
93
$2527
Slurry Seal
2015
ROSE
S/HAZELNUI'
N/LAMPSON
440
37
16,280
C
5/92010
65
$53
2" AC Overlay
2016
12TH
S /SEAL
N /OCEAN
210
24
5
E
5/92010
85
$1 930
Slurry Seal
2016
13TH
S /SEAL
N /OCEAN
210
25
5,250
E
5/112010
86
$2,010
Slurry Seal
2016
5TH
S /MARINA
N/PCH
660
60
39,600
C
5/82010
89
$15,162
Slurry Seal
2016
ASTER
S/ ALMOND
N/ BIRCHWOOD
1,239
37
45,843
E
5/92010
88
$17,553
Slurry Seal
2016
BASSWOOD
EASTER
W /LAMPSON
410
36
14
C
5/92010
85
$5651
Slurry Seal
2016
CATALINA
E/BALBOA
W /COASTLINE
1
37
70,670
C
5/112010
94
$27
Slurry Seal
2016
CENTRAL WY
E/ STH
W/ 4TH
260
38
9
E
5/112010
85
$3 783
Slurry Seal
2016
CLIPPER
E/ CARAVEL
W/ ELECTRIC
910
33
30 030
E
5/112010
85
$11,498
Slurry Seal
2016
DORY
IS/GALLEON
IN/SCHOONER
360
28
1
10,080
F.
5/82010
1 92
$3,860
Slurry Seal
2016
ELECTRIC
JE/CORSAIR
WEND
380
33
12
A
5/82010
1 94
$4 j
Slurry Seal
6/16/2010
Nichols Consulting Engineers, Chtd. page 2 of 3
City of Seal Beach
Sections Selected For Treatment ($850,000 /year, City's Existing Budget)
2016
ELECTRIC
E/SEAL BEACH
19 W /SEAL BEACH
190
34
1 6,460
A
5/8/2010
92
$2,473
Slurry Seal
2016
GALLEON
S /ELECTRIC
N/DORY
970
33
32,010
E
5/8/2010
91
$12,256
Sluny Seal
2016
LAMPSON
EBASSWOOD
W/ SEAL BEACH
3,300
60
198,000
A
5/8/2010
90
$75812
Slurry Seal
2016
MAIN
S /OCEANAVE
N/ELECTRIC
1,190
57
67,830
A
5/11/2010
78
$25,971
Slurry Seal
2016
MARLIN
E/SEAL BEACH
W /BALBOA
1 610
37
59,570
E
5/9/2010
87
$22,809
Slurry Seal
2016
RIVIERA
S/MARLIN
NBOLSA
560
31
17
E
5/11/2010
88
$6,647
Slurry Seal
2016
SCHOONER
E /GALLEON
W/DORY
660
33
21,780
E
5/9/2010
94
$8,339
Slurry Seal
2016
SEAL BEACH
S /ADOLFO LOPEZ
N/WESTMINSTER.
4
98
399
A
5/11/2010
88
$153,094
Slurry Seal
2016
SEAL BEACH
WESTMINSTER
NBEVERLY MANOR
4,536
95
430,920
A
5/11/2010
89
$164 994
Slurry Seal
2016
SEAL BEACH
OLD RANCH PKY
O N/ LAMPSON
833
89
74
A
5/11/2010
1 92
$28386
Slurry Seal
2016
SEAL BEACH
S/ LAMPSON
ST. CLOUD DR
915
77
70
A
5/11/2010
84
$26,976
Slurry Seal
2016
SEAL BEACH
ST. CLOUD DR
PLYMOUTH
1,491
77
114
A
5/11/2010
93
$43,958
Slurry Seal
2016
SEAL BEACH
S /ROSSMOOR
NBRADBURY
1,040
97
100,880
A
511112010
93
$38,626
Slurry Seal
201711
ST
IS/MARINA
N/PCH
1 2,172
1 23
49
E
5/11/2010
63
$180,754
2" AC Overlay
2017
OLD RANCH
PARKWAY
720 W/ SEAL
BEACH
W/ 22 FWY
1 1,030
34
35
A
5/9/2010
26
$492,767
Reconstruction
2017
ROSSMOOR CTR
E/ WEST RD
I W/ MONTECITO
1 364
28
10
E
5/11/2010
20
$143,412
Reconstruction
Note:
1. "Plan Year" is the fiscal year planning for the treatment
2011- FY 2010 -2011
2012- FY 2011 -2012
2013- FY 2012 -2013
2014- FY 2013 -2014
2015- FY 2014 -2015
2016- FY 2015 -2016
2017 - FY 2016 -2017
2. "FC" is Functional Class
A - Arterial
C - Collector
E - Residential
6/16/2010
Nichols Consulting Engineers, Chtd. page 3 of 3
Section 4
City's Projected Resurfacing Program
City of Seal Beach
Arterial Street Resurfacing Program
2011 BALBOA S /PCH N /BOLSA 1 6601 371 24,420 44 $256,410.00 R & R
2011 IBOLSA IPCH IBALBOA 1 1,0551 371 39,035 58 $191,271.5014" AC Overla
TOTAL I $447.6B1.50
2012 ELECTRIC S
I E /SEAL BEACH
IMMAIN
1 2,3601
251
59,000
48
$289,100.0014"
AC Overla
TOTAL
$289,100.00
2013 ELECTRIC N
JE /SEAL BEACH
IMMAIN
1 2,4101
271
65,070
66
$175,689.0012"
AC Overla
TOTA
1 - $175,689.00
2014 MARINA
E /PCH
16TH
1 6291
611
38,369
42
$402,874.50
R & R
TOTAL
$402,874.50
2015 WESTMINSTER
E /BOLSA CHICA
IW /SEAL BEACH
1 10,6101
721
763,9201
40
$8,021,160.00
R & R
TOTA
1 $8,021,160.00
2016 WESTMINSTER
IW /CITY LIMIT
I E /SEAL BEACH
1 4,3601
791
344,440
69
$929,988.00
2" AC Overlay
TOTAL
$929,988.00
201711 ST
S /PCH
INIMARINA
1 2,1721
221
47,784
78
$129,016.8012"
AC Overla
TOTA
1 $129,016.80
6/16/2010
Nichols Consulting Engineers, Chtd. Page 1 of 1
City of Seal Beach
Local Street Resurfacing Program
2011
IRONWOOD
S /CANDLEBERRY
WELDER
500
331
16,500
50
$80,850.00
4" AC Overly
2011
IRONWOOD
E/WISTERIA
W/TULIP
322
37
11,914
29
$125,097.00
R & R
2011
BALBOA
S /PCH
N /BOLSA
660
37
24,420
44
$256,410.00
R & R
2011
BOLSA
E /SEAL BEACH
W/MAIN
2,810
37
103,970
58
$509,453.00
4" AC Overly
2011
SOUTH SHORE
S /BOLSA
N/TAPER
1,060
33
34,980
29
$367,290.00
R & R
2011
ITAPER
S /BOLSA
N /CATALINA
1 1,110
33
36,630
38
$384,615.001R
& R
2011
ISAND PIPER
S /BOLSA
IN/TAPER
1 1,1101
331
36,630
35
$384,615.00
R & R
(TOTAL 1 $2,108,330.00
2012
LANDING
E /SEAL BEACH
W /12TH
1,210
21
25,410
27
$266,805.00
R & R
2012
14TH
S /ELECTRIC
N /PCH
1,010
21
21,210
37
$222,705.00
R & R
2012
PURDUE CIRCLE
S /END
N /COLLEGE PARK
68
27
1,836
71
$4,957.20
2" AC Overly
2012
15TH
S /ELECTRIC
N /PCH
1,1101
21
23,310
34
$244,755.00
R & R
(TOTAL - :- -1 .$739,222.20
2013
IRONWOOD
W (TULIP
IWISUNFLOWER
1,020
371
37,740
50
$184,926.00
4" AC Overly
2013
BALBOA
S /BOLSA
N /CATALINA
1,0601
371
39,220
36
$411,810.00
R & R
2013
HARBOR
S /BAYSIDE
I N/BAYOU
760
33
25,080
37
$263,340.00
R & R
(TOTAL 1 $860,076.001
2014
IRONWOOD
IS/ELDER INMEATHER
W /IRIS
1,9501
331
64,350
50
$315,315.0014"
AC Overly
2014
11TH
IS/ELECTRIC
N /LANDING
210
37
7,770
40
$81,585.001R
& R
2014
13TH
IS/ELECTRIC
N /PCH
9601
211
20,160
48
$98,784.0014"
AC Overly
(TOTAL I - $495,684.001
2015
IRONWOOD
E /ROSE
W /IRIS
1,420
33
46,860
72
$126,522.00
2" AC Overly
2015
IRIS
HAZELNUT AVE
IRONWOOD AVE
226
32
7,232
56
$19,526.40
4" AC Overly
2015
ROSE
S/HAZELNUT
N /LAMPSON
440
37
16,280
38
$43,956.00
2" AC Overly
2015
VIOLET
S /ELDER
N /FIR
160
33
5,280
53
$25,872.00
4" AC Overla
2015
SILVER SHOALS
S /BOLSA
N /FATHOM
300
33
9,900
42
$103,950.00
R & R
(TOTAL 1 $319,826.401
6/16/2010
Nichols Consulting Engineers, Chtd. Page 1 of 2
City of Seal Beach
Local Street Resurfacing Program
2016
SUNFLOWER
S /FIR
N /IRONWOOD
560
37
20,720
78
$55,944.00
2" AC Overla
2016
HAZELNUT
E/WISTERIA
W /SUNFLOWER
1,310
33
43,230
60
$116,721.00
2" AC Overla
2016
MARINA
E /PCH
6TH
629
61
38,369
42
$402,874.50
R & R
2016
16TH
&ELECTRIC
N /PCH
1,160
21
24,360
47
$119,364.00
4" AC Overla
2016
17TH
S /ELECTRIC
N /PCH
1,260
21
26,460
47
$129,654.00
4" AC Overla
TOTAL 1 $824,557.501
2017
DAISY
S /CANDLEBERRY
N /DOGWOOD
210
33
6,930
73
$18,711.00
2" AC Overla
2017
HEATHER
S /ELDER
N /HAZELNUT
790
37
29,230
77
$78,921.00
2" AC Overla
2017
FIR
E /ROSE
W /HEATHER
1,260
33
41,580
75
$112,266.00
2" AC Overla
2017
GUAVA
E /PANSY
W /HEATHER
1,360
33
44,880
79
$121,176.00
2" AC Overla
2017
MARIGOLD
S /BIRCHWOOD
N /CANDLEBERRY
160
33
5,280
69
$14,256.00
2" AC Overla
2017
DOGWOOD
IE/WISTERIA
IW /OLEANDER
1 1,7101
33
56,430
72
$152,361.00
2" AC Overla
TOTAL 1 $497,691.00
6/16/2010
Nichols Consulting Engineers, Chtd. Page 2 of 2
Section 5
City's Projected Slurry Seal Program
City of Seal Beach
Local Street Slurry Program
2011
CATALINA
E/BALBOA
W /COASTLINE
1
37
70,670
C
5/11/2010
94
$21,201
Slurry Seal
2011
COASTLINE
S /CARMEL
N /END
480
27
12,960
E
5/8/2010
91
$4,501
Slurry Seal
2011
MARLIN
E/SEAL BEACH
W /BALBOA
1
37
59,570
E
5/9/2010
88
$17,871
Slurry Seal
2011
RIVIERA
S/MARLIN
N /BOLSA
560
31
17,360
E
5/11/2010
89
$5,208
Slurry Seal
2012
12TH
S /SEAL
N /OCEAN
210
24
5 040
E
5/9/2010
86
$1,512
Slurry Seal
201213TH
S /SEAL
N /OCEAN
210
25
5,250
E
511112010
87
$1,575
Slurry Seal
2012
CENTRAL WY
E/ 5TH
W/ 4TH
260
38
9,880
E
5/112010
85
$3,783
Slurry Seal
2012
ELECTRIC
FJSEAL BEACH
19 W /SEAL BEACH
190
34
6,460
A
5/82010
92
$1,938
Slurry Seal
2012
ELECTRIC S
E16TH
W/MAIN
910
25
22 750
A
5/82010
93
$7,525
Slurry Seal
2012
NEPTUNE
S /SEAL
N /OCEAN
210
24
5 040
E
5/92010
84
$1,750
Slurry Seal
2012
SEAL BEACH BLVD
S /ELECTRIC
N /PCH
1,510
40
60
A
5/112010
83
$115,297
Slurry Seal
2013
ASTER
S/ ALMOND
N /BIRCHWOOD
1,239
37
45,843
E
5/92010
89
$13,753
Slurry Seal
2013
CLOVER
S /ALMOND
MEND
130
33
4,290
E
5/82010
81
$11,542
Slurry Seal
2013
FIR CIRCLE
S /FIR
N /END
130
60
7
E
5/82010
79
$2,340
Slu7y Seal
2013
HEATHER
S/ELDER
N /HAZELNUT
790
37
29
C
5/82010
77
$78,921
Slurry Seal
2013
PANSY
S /FIR
N /GUAVA
160
33
5280
E
5/92010
81
$14205
Slurry Seal
2013
ROSE
S/FTR
N /HAZELNUT
390
37
14,430
C
5/92010
81
$38,823
Slurry Seal
2014
ELDER
&OLEANDER
W /FUCHSIA
1,790
36
64,440
E
5/82010
83
$21,314
Slurry Seal
2014
GUAVA
E/PANSY
W/HEATHER
1,360
33
44
E
5/82010
78
$127
Slurry Seal
2015
HAZELNUT
E/HEATHER
W/ROSE
1
33
53,130
E
5/82010
80
$157
Slurry Seal
2015
SUNFLOWER
S /FIR
N/IRONWOOD
560
37
20,720
E
5/92010
76
$58,741
Slurry Seal
2016
ALMOND
E/OLEANDER
W /ASTER
4,390
36
158,040
C
5/82010
91
$54,886
Slurry Seal
2016
BASSWOOD
E/ASTER
W/LAMPSON
410
36
14,760
C
5192010
85
$5,651
Slurry Seal
2016
BLUE BELL
S /ALMOND
N/BIRCHWOOD
710
33
23,430
E
5/92010
86
$8,544
Slurry Seal
2016
CAMELIA
S /ALMOND
N /BANYAN
1 590
33
19,470
E
5/92010
90
$7
Slurry Seal
2016
CANDLEBERRY
E/WISTERIA
W /OLEANDER
1,660
33
54,780
E
5/82010
91
$19,976
Slurry Seal
2016
CARNATION
S /ALMOND
N/END
230
33
7 590
E
5/82010
88
$2,636
Slu Seal
2016
DAFFODIL
S /ALMOND
N/END
230
33
7,590
E
5/82010
84
$2,636
Slurry Seal
2016
DAISY
S /ALMOND
N /BIRCHWOOD
410
33
13,530
C
5/82010
90
$4,934
Slurry Seal
2016
DAISY CIRCLE
S/FIR
WEND
230
33
7,590
E
5/82010
86
$2.636
Slurry Seal
2016
DOGWOOD
E/DAISY
WARONWOOD
1
33
48,510
E
5/82010
92
$17,689
Slurry Seal
2016
DOGWOOD
EIMARIGOLD
W /FUCHSIA
1
33
50,160
E
5/82010
90
$18,291
Slurry Seal
2016
ELDER
EIVIOLET
W/PRIMROSE
1
33
45.540
E
5/8/2010
92
$16,606
Slurry Seal
2016
FERN
S /ALMOND
N/END
230
33
7
E
5/82010
94
$2,636
Slurry Seal
2016
IRIS
S /ALMOND
WEND
230
33
7 590
E
5/82010
89
$2636
Slurry Seal
2016
MARIGOLD
S /CANDLEBERRY
N/DOGWOOD
160
33
5 280
E
5/92010
89
$1
Slurry Seal
2016
OLEANDER
S /ALMOND
N/FIR
1
36
47.520
E
5/92010
89
$17
Slurry Seal
2016
PRIMROSE
S/DOGWOOD
WELDER
210
33
6,930
E
5/92010
93
$2,527
Slu7y Seal
20175TH
S/MARINA
N/PCH
660
60
39600
C
5182010
89
$15 ,162
Slurry Seal
2017
CLIPPER
E/ CARAVEL
W/ ELECTRIC
910
33
30,030
E
5/112010
85
$11
Slurry Seal
2017
COLLEGE PARK
JE/HARVARD
W/HARVARD
2
37
95 830
C
5/82010
94
$33
Slurry Seal
2017
COLLEGE PARK
JE/HARVARD
JW /CITY LIMIT
940
44
41 360
E
5/82010
86
$14
Slurry Seal
7/6/2010
Nichols Consulting Engineers, Chtd. page 1 of 2
Note:
1. "Plan Year" is the fiscal year planning for the treatment
2011 - FY 2010 -2011 Cove /Hill Phase 1
2012 - FY 2011 -2012 Hill Phase II
2013 - FY 2012 -2013 Old Town Phase 1
2014 - FY 2013 -2014 Old Town Phase II
2015 - FY 2014 -2015 CPW /CPE Phase 1
2016 - FY 2015 -2016 CPE Phase II
2017 - FY 2016 -2017 Bridgeport
2. "FC" is Functional Class
A - Arterial
C - Collector
E - Residential
City of Seal Beach
Local Street Slurry Program
7/6/2010