HomeMy WebLinkAboutCC AG PKT 2010-10-11 #L AGENDA STAFF REPORT DATE: October 11, 2010 TO: Honorable Mayor and City Council THRU: David Carmany, City Manager FROM: Sean P. Crumby, P.E., Director of Public Works SUBJECT: NOTICE OF COMPLETION FOR LOCAL STREET RESURFACING PROGRAM PROJECT NO. ST0906 -B (ST1004) - COLLEGE PARK EAST SUMMARY OF REQUEST: It is requested that the City Council adopt Resolution No. 6066 to formally accept completion of the Local Street Resurfacing Program Project No. ST0906 -B (ST1004) — College Park East, direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk- Recorder within ten (10) days from the date of acceptance and to release retention in the amount of $129,649.51 in 35 days. BACKGROUND: On March 8, 2010, City Council awarded a contract to All American Asphalt in the amount of $922,490.70 for the Local Street Resurfacing Program Project No. ST0909 -B (ST1004) — College Park East. The project consists of removing damaged curb & gutter and driveway entrances and replacing with new curb & gutter and driveway entrances for improved curb drainage. The project also consists of pulverizing the existing roadway and constructing a new pavement utilizing Full -Depth Reclamation (FDR). During construction, there were several unforeseen conditions that were encountered that resulted in change orders to the contractor, and delays in the construction schedule. The single largest issue was that the condition of the soil had a higher moisture content than when the soil was tested for the Geotechnical Report. This higher moisture level is likely due to the large rain events that occurred in January of 2010. When the soils report was conducted in April 2009, very low recorded rainfall occurred for that season. The presence of the high groundwater, high moisture content, and clay soils in College Park East is the original reason that the testing that was done in the Geotechnical Report. Agenda Item L Page 2 In addition to the higher moisture content several of the private utilities were located closer to the surface of the roadway that was reported to the City. The contractor's equipment severed several private utility lines and a city watermain during the construction. Engineering staff, the design engineers and the geotechnical consultant met and revised the FDR sections. The revised design proved to be adequate for the wet conditions. The impact of these changes was significant to the residents as traffic was restricted from the area longer than was anticipated. If FDR is used again as a method of reconstruction the contractor will be required to verify the moisture content of the soil prior to the start of construction. Additionally the contractor will be required to demolish a smaller work area. This will limit the amount of resident that are impacted by any obstacles with the construction. The project is now complete with the satisfaction of the City Engineer and recommends formal acceptance of the project. FINANCIAL IMPACT: In the approved 09/10 Budget, $5,050,000.00 was approved for the Project ST1004 Local Street Resurfacing Program. These funds are to be used for Project ST1004 —A and ST1004 —B. Below is a breakdown and summary of expenses for the project: Estimated Expenses: Amount Construction — All American $1,296,495.07 Construction Management $23,360.00 Design $389,078.00 TOTAL $1,708,933.07 When project ST0906 — A — Old Town Paving is completed, staff will bring a final report outlining the funding spent under this budget. RECOMMENDATION: It is recommended the City Council adopt Resolution No. 6066 to formally accept completion of the Local Street Resurfacing Program Project No. ST0906 -B (ST1004) — College Park East, direct the City Clerk to file a "Notice of Completion" with the Orange County Clerk- Recorder within ten (10) days from the date of acceptance and to release retention in the amount of $129,649.51 in 35 days Page 3 SUBMITTED BY: NOTED AND APPROVED: the me Sean P. Crumby, P.E. David Carmany Director of Public Works City Manager Prepared by: David Spitz, P.E. Associate Engineer Attachments: A. Resolution No. 6066 - Declaring Work Completed B. Notice of Completion RESOLUTION NUMBER 6066 A RESOLUTION OF THE SEAL BEACH CITY COUNCIL DECLARING WORK TO BE COMPLETED PER CONTRACT DOCUMENTS FOR LOCAL STREET RESURFACING PROGRAM PROJECT NO. ST0906 -B (ST1004) — COLLEGE PARK EAST WHEREAS, on March 8, 2010 the City of Seal Beach entered into a contract with All American Asphalt; and WHEREAS, the City Engineer has determined that the work has been substantially completed in accordance with the contract documents. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES HEREBY RESOLVE: Section 1. That the work required to be performed by said Contractor has been completed. Section 2. That the total cost of amount to be paid to contractor for the work performed is $1,296,495.07. Section 4. That the work is hereby accepted and approved. Section 5. It is further ordered that a "Notice of Completion° be filed on behalf of the City in the Office of the Orange County Recorder within ten (10) days of the date of this resolution. PASSED, APPROVED and ADOPTED by the Seal Beach City Council at a regular meeting held on the 11th day of October , 2010 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members ABSTAIN: Council Members Mayor ATTEST: City Clerk STATE OF CALIFORNIA } COUNTY OF ORANGE } SS CITY OF SEAL BEACH } I, Linda Devine, City Clerk of the City of Seal Beach, do hereby certify that the foregoing resolution is the original copy of Resolution Number 6066 on file in the office of the City Clerk, passed, approved, and adopted by the Seal Beach City Council at a regular meeting held on the 11th day of October , 2010. City Clerk RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO CITY OF SEAL BEACH Attn: City Clerk 211 - 8th Street Seal Beach, CA 90740 Space of above this line for Recorder's use. * ** No Recording Fee Pursuant to Government Code Section 6103, 27383 * * ** NOTICE OF COMPLETION Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. Notice is hereby given that: 1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below. in the property hereinafter described: 2. The full name of the owner is: City of Seal Beach. 3. The address of the owner is: 211 — 8th Street, Seal Beach, CA 90740. 4. The nature of the interest or estate of the owner is: In Fee. The City of Seal Beach. 5. A work of improvement on the property hereinafter is described as substantially completed on August 20, 2010. The work was Local Street Resurfacing Program CIP No. ST0906 -B (ST1004- College Park East.. 6. The name of the contractor, if any, for such improvement was: All American Asphalt. The date of the Contract Award was March 8 2010. 7. The property on which said work of improvement was completed in the City of Seal Beach, County of Orange, State of California, and is described as follows: College Park East. Date: Signature of owner or corporate officer of owner named in paragraph 2 or agent. VERIFICATION I, the undersigned, say: the Director of Public Works declarant of the foregoing notice of completion; have read said notice of completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury the foregoing is true and correct. Executed on , 2010, at Seal Beach, California. (Date of Signature) Director of Public Works