HomeMy WebLinkAboutCC AG PKT 2005-06-13 #II 347 AGENDA REPORT DATE: June 13, 2005 TO: Honorable Mayor and City Council THRU: John B. Bahorski, City Manager FROM: Mark K. Vukojevic, P.E. Director of Public Works /City Engineer SUBJECT: AWARD BID FOR SEAL BEACH BLVD. LANDSCAPED MEDIAN PROJECT NO. 50200 • SUMMARY OF REQUESTS: The proposed action will award a construction contract for the Seal Beach Blvd. Landscaped Median Project No. 50200 to the lowest responsible bidder, Alliance Streetworks Inc in the amount of $778,792.75 and authorize the City Manager to execute the agreement. BACKGROUND: As part of the 2004 budget process, City Council approved a project to construct a landscaped median along Seal Beach Blvd. between Westminster Avenue and Beverly Manor Road. The project provides aesthetic enhancement to the City's corridor and provides traffic benefits to motorists and nearby residents of Leisure World. W.G. Zimmerman Engineering was selected through the City's selection process to design the project and conceptual plans were presented to both Leisure World Council Members for review of conceptual planting schemes and layout. The work consists of excavation of existing asphalt paving within the pavement markings of Seal Beach Blvd. center turning lane. It will then be replaced with fertilized soil for trees, shrubbery and textured concrete, bounded by concrete curbs. During the design phase, it was discovered that the existing pavement is composed of concrete 6 — 10 inches below the existing 8 -inch layer of asphalt. The cost to remove the additional concrete increased the costs above the original budget allocation. Staff added an alternative bid item for stamped concrete as opposed to cobblestones, to provide options to City Council at the time of award. The stamped concrete option is Alternate B, which is being recommended by staff due to budget issues. Completion of this project will provide medians along the entire length of Seal Beach Boulevard. Staff is also anticipating that a minor reduction in the scope of work will be necessary to bring the project within the budget constraints. Items being considered are the purchase of new street signs, installation of the new signs, concrete maintenance strip and moisture barrier. PZENDA ITEM Tr Four bids were received and opened by the City Clerk on June 1, 2005 as listed below: Company Alternate B Alternate A 1 Alliance Streetworks Inc $ 778,792.75 $ 827,146.50 2 Griffith Company $ 787,890.50 $ 831,190.50 3 EBS Inc $ 801,098.50 $ 814,503.50 4 Excel Paving Company $ 858,525.50 $ 873,845.50 Staff has reviewed the submitted bid documents and found the low bidder to be in compliance with the contract documents. Staff contacted the references provided by the contractor and determined that the contractor has satisfactorily completed similar projects for organizations in the area. Upon the successful execution of the contract documents, the project is estimated to start in August and completed in December. FISCAL IMPACT: Funds in the amount of $840,000 are currently available in fiscal year 2004/2005 from the General Fund within the City's approved 5 -year Capital Improvement Program budget under Project No. 50200. An additional $10k is also available from the Water Enterprise Fund for the water service required for the project. RECOMMENDATION: It is recommended that the City Council award a construction contract for the Seal Beach Blvd. Landscaped Median Project No. 50200 to the lowest responsible bidder, Alliance Streetworks Inc in the amount of $778,792.75 and authorize the City Manager to execute the agreement. Prepared B, : Reviewed By: R. •nr. Velasco Gary . L - org-/ Associats Assistant City Engineer Concur: N I AND APPJ ED: Mark K. Vukojevic, P.E. John B I . ahorski, r Director of Public Works /City Engineer City II ager Attachment: Award Resolution for Project #50200 RESOLUTION NUMBER ' 3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL BEACH AWARDING THE BID FOR THE SEAL BEACH BLVD. LANDSCAPED MEDIAN PROJECT #50200 NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SEAL BEACH DOES HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS: • SECTION 1. The City Council hereby approves the contract between the City of Seal Beach and Alliance Streetworks Inc. for the Seal Beach Blvd. Landscaped Median Project. SECTION 2. The Council hereby directs the City Manager to award a contract for the Seal Beach Blvd. Landscaped Median Project, Project #50200 to Alliance Streetworks Inc. PASSED, APPROVED AND ADDOPTED by the City Council of the City of Seal Beach at a meeting thereof held on the day of 2005 by the following vote: AYES: Council Members NOES: Council Members ABSENT: Council Members Mayor ATTEST: City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF SEAL BEACH ) I, Linda Devine, City Clerk of the City of Seal Beach, California, do hereby certify that the foregoing Resolution is the original copy of Resolution Number on file in the office of the City Clerk, passed, approved, and adopted by the City Council of the City of Seal Beach at a meeting thereof held on the day of , 2005. City Clerk