HomeMy WebLinkAboutCC AG PKT 2005-06-13 #JJ •
463 +8
Q
AGENDA REPORT 6 ,0
DATE: June 13, 2005
TO: Honorable Mayor and City Council
THRU: John B. Bahorski, City Manager
FROM: Mark K. Vukojevic, P.E., Director of Public Works /City Engineer
SUBJECT: ADJUSTMENT TO PUBLIC WORKS CONTRACTS IN
ACCORDANCE WITH SEAL BEACH CITY CHARTER
SECTION 1010
SUMMARY OF REQUEST:
The proposed City Council action will conduct a public hearing and adopt resolution
confirming the adjustment to the bidding threshold on Public Works Contracts as authorized by
the City Charter, Section 1010 from $20,000 to $22,400.
BACKGROUND:
In March of 2002, the Official Charter of the City was amended as was routinely done during the
past 40 years. Fiscal Administration, Section 1010 was also amended to include a formal
procedure for the bidding threshold for Public Works Contracts. At that time, the bidding
threshold was established at $20,000 with specific requirements for the City Engineer to adjust
the bidding threshold by "computing the percentage difference between the current Engineering
News Record (ENR) Construction Cost Index — 20 City Average and the ENR for the previous
June 1" or previous increase. The previous July 2002 Construction Cost Index was 6605 and
the current May 2005 Construction Cost Index is 7398 indicating a 12% increase.
As stated in the Charter, the "City Council shall review such adjustment at a public hearing and
upon Council confirmation, the bidding threshold amount shall be adjusted figure." This
adjustment is required by the City Charter to enable the Public Works Department to maintain
purchasing power current with inflation as it relates to construction. As reflected in the above
numbers, inflation necessitates the adjustment. Although the City Engineer may recommend an
adjustment on an annual basis, this is the first time since 2002 that it has been recommended. As
proposed, all projects over $22,400 would require formal bidding procedures and contracts.
Projects under $22,400 would be permitted to use written informal bidding procedures and
contracts. (The current threshold is $20,000) All Departments are required to follow the specific
fiscal procedures as outlined in the Charter and existing Policies and Procedures governing
contracting for Public Works.
Agenda Item It
FISCAL IMPACT:
As proposed, there will be no negative impact on the general fund. Rather, there may be cost
savings. All contracts completed under this threshold are within the existing budget as approved
by City Council. Maintaining the existing bidding threshold limits purchasing power and may
require additional expense to produce and use formal plans and specifications, reports, notices,
consultant services and staff resources. Thus, if the adjustment is confirmed, the City will not
have to incur this additional expense.
RECOMMENDATION:
It is recommended that City Council conduct a public hearing and adopt resolution ,
confirming an adjustment to the bidding threshold on Public Works Contracts as authorized by
the City Charter, Section 1010 from $20,000 to $22,400.
Prepared
d By:
Mar Vukojev ic, P.E.
Director of Public Works /City Engineer
N
0 d: B. Bahorski,City Manager
• r achment: Resolution _ Bidding Threshold on Public Works Contracts
Agenda Item
•
PUBLIC HEARING
THIS IS THE TIME AND PLACE FOR A PUBLIC HEARING FOR CONSIDERATION OF ADOPTION OF
RESOLUTION ADJUSTING PUBLIC WORKS CONTRACTS IN ACCORDANCE WITH SEAL BEACH CITY
CHARTER SECTION 1010.
MRS. DEVINE, HAVE NOTICES BEEN POSTED AND /OR ADVERTISED AND MAILED AS REQUIRED BY
LAW, AND HAVE YOU RECEIVED ANY COMMUNICATIONS EITHER FOR OR AGAINST THE MATTER?
CITY MANAGER, IS THERE A STAFF REPORT?
WRITTEN AND ORAL COMMUNICATIONS RELATING TO THE PUBLIC HEARING WILL BE RECEIVED
BY THE CITY COUNCIL.
ARE THERE MEMBERS OF THE AUDIENCE WHO WISH TO SPEAK IN FAVOR OF THE PROPOSED
MATTER? IF SO, PLEASE COME TO THE MICROPHONE.
ARE THERE MEMBERS OF THE AUDIENCE WHO WISH TO SPEAK IN OPPOSITION TO THE PROPOSED
MATTER? IF SO, PLEASE COME TO THE MICROPHONE.
I HEREBY DECLARE THE PUBLIC HEARING CLOSED.
Agenda Item JJ
•
•
RESOLUTION NUMBER
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEAL
BEACH CONFIRMING AN ADJUSTMENT TO THE BIDDING
THRESHOLD ON PUBLIC WORKS CONTRACTS IN ACCORDANCE
WITH SECTION 1010 OF THE CITY CHARTER
WHEREAS, the City Charter requires the City Engineer to adjust the bidding threshold by •
computing the percentage difference between the current Engineering News
Record (ENR) Construction Cost Index — 20 City Average and the ENR for
the previous June 1;
WHEREAS, the City Charter requires the City Council to review such adjustment at a
public hearing and upon Council confirmation, the bidding threshold amount
shall be the adjusted figure;
WHEREAS, the Engineering New Record Construction Cost Index was 6605 for July 2002
and the bidding threshold was set at $20,000; and
WHEREAS, the Engineering New Record Construction Cost Index is 7398 for May 2005
representing a 12% increase.
The City Council of the City of Seal Beach hereby resolves as follows:
SECTION 1. The City Council hereby confirms the adjustment to the bidding threshold
amount to $22,400 as required by City Charter Section 1010.
PASSED, APPROVED AND ADOPTED by the City Council of the City of Seal Beach at a
meeting thereof held on the day of 2005 by the following
vote:
AYES: Council Members
NOES: Council Members
ABSENT: Council Members
Mayor
ATTEST:
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF SEAL BEACH )
I, Linda Devine, City Clerk of the City of Seal Beach, California, do hereby certify that the
foregoing Resolution is the original copy of Resolution Number on file in the office
of the City Clerk, passed, approved, and adopted by the City Council of the City of Seal
Beach at a meeting thereof held on the day of , 2005.
City Clerk