Loading...
HomeMy WebLinkAboutCC AG PKT 2005-04-11 #W • G"..„ AGENDA REPORT DATE: April 11, 2005 TO: Honorable Mayor and City Council THRU: John B. Bahorski, City Manager FROM: Mark K. Vukojevic, P.E. Director of Public Works /City Engineer SUBJECT: AWARD CONSTRUCTION CONTRACT FOR ANNUAL STREET SEAL PROGRAM, PROJECT No. 50176 SUMMARY OF REQUEST: The proposed City Council action will award a construction contract for the Annual Street Seal Program, Project 50176, to the lowest responsible bidder, All American Asphalt in the amount of $53,804 and authorize the City Manager to execute the agreement. Staff is recommending City Council to authorize an additional three streets to the original scope of work. BACKGROUND: On June 14, 2004, the City Council approved the City's Pavement Management System (PMS). The system was also approved by the Orange County Transportation Authority (OCTA) as part of Measure M funding eligibility. On December 13, 2004, City Council approved and authorized staff to initiate the bidding process for the Annual Street Seal Program, Project No 50176. As identified in the PMS, this project will slurry seal several streets within the City. Slurry seals extend the effective life of asphalt concrete pavements by placing a protective seal over existing pavement surfaces that are just beginning to show signs of wear. Slurry seals allow the City to stretch pavement rehabilitation funds and maintain a higher level of pavement quality by protecting pavement from oxidation. Any dollar spent on keeping pavements in good condition (slurry seal) will save from five to twenty dollars in rehabilitation repairs that must be made on pavement in poor condition. It is standard practice to slurry seal every 5 to 8 years. The streets to be slurry sealed, as identified in the June 2004 Pavement Management System, are as follows: OLD TOWN THE HILL 5 Street (Marina Ave. to PCH) Bolsa Ave (PCH to Seal Beach Blvd) Silver Shoals (Bolsa Ave. to Fathom Ave.) Balboa Dr. (Bolsa Ave. to Catalina Ave.) Agenda Item W COLLEGE PARK EAST Iris St (Hazelnut Ave to Ironwood Ave) Ironwood Ave (Iris St to Rose St) Ironwood Ave (Sunflower St to Wisteria St) Hazelnut Ave (Sunflower St to Wisteria St) Five bids were received and opened by the City Clerk on April 5, 2005 as listed below: COMPANY BID AMOUNT 1 All American Asphalt $ 53,804 2 Doug Martin Contracting Company $ 62,561 3 Pavement Coatings Company $ 64,273 4 Roy Allen Slurry Seal Inc. $ 78,484 5 American Asphalt South Inc. $ 82,980 Bids received were lower than expected costs. Staff is proposing to advance three streets from the FY 2005 -06 program. Additional streets will then be added to the FY 2005 -06 project based on the priority list on the approved Pavement Management System. The three additional streets are within twenty -five percent (25 %) of the original bid amount. The following streets will be added to the FY 2004 -05 Annual Street Seal Project: ❑ Harbor Way: Bayou Way to Bayside Drive ❑ Sandpiper Drive: Taper Drive to Bolsa Avenue ❑ Taper Drive: Catalina Avenue to Bolsa Avenue Staff has reviewed the submitted bid documents and found the low bidder to be in compliance with the contract documents. Upon the successful execution of the contract documents, the project is estimated to start in early May and completed in July. FISCAL IMPACT: Funds in the amount of $75,000 are currently available in fiscal year 2004/2005 from the Measure M — Local Turnback fund within the City's approved 5 -year Capital Improvement Program budget under Project No. 50176. The remaining funds in the amount of $11,363, from the Main Street maintenance paving, is added to the $75,000 that is currently available in fiscal year 2004/2005 Capital Improvement Program budget for the Annual Street Seal Project. The total funds available for the 2004/2005 Annual Street Seal Project are $86,363. There is no fiscal impact to the General Fund. RECOMMENDATION: It is recommended that the City Council award a construction contract for the Annual Street Seal program, Project 50176, to the lowest responsible bidder, All American Asphalt in the amount of $53,804 and authorize the City Manager to execute the Agenda Item_ agreement. It is also recommended that the City Council authorize Staff to add three streets to the original scope of work. Prepared By: Reviewed By: tit *Oil . 5<i , e--7 A Ra fl (, . elasco Gary raForge A's. iat • ngineer Assistant City Engineer Concur: /i" , Z /// _ . Mark K. Vukojevic, P.E. Director of Public Works /City Engineer NOT D • D APPRO D: , i John r f . Bah . rski, City Manager Atp hement: Proposed Resolution No. • Agenda Item