Loading...
HomeMy WebLinkAboutAGMT - Willdan Engineering (Fire Station 48) AN AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES SEAL BEACH FIRE STATION NO. 48 3131 BEVERLY MANOR ROAD between -g; SEA/ e tP F q , pPoggT 9i , y yQ . Q 'aC�c q i Egai , Clt City of Seal Beach 211 - 8th Street Seal Beach, CA 90740 • Willdan Engineering 2401 East Katella Avenue, Suite 450 Anaheim, California 92806 -6073 Fax: (714) 978 -8299 THIS AGREEMENT is made and entered into this 14 day of July 2008, by and between the City of Seal Beach, a municipal corporation ( "City ") and Willdan Engineering, a California corporation ( "Consultant "). 1 of 14 57296- 0200\1067636v4.doc • • RECITALS A. City desires to build Fire Station #48 at 3131 Beverly Manor Road, in the City of Seal Beach (the "Project "), which Project requires the engagement of a Construction Management firm for pre -bid and construction services. B. Pursuant to the authority provided by its City Charter and Government Code Section 37103, if applicable, City desires to engage Consultant to provide Construction Management Services in the manner set forth herein and more fully described in Section 1. C. Consultant represents that the principal members of Consultant firm are qualified professional construction managers and are fully qualified to perform the Consultant services contemplated by this Agreement in a good and professional manner; and it desires to perform such services as provided herein. NOW, THEREFORE, in consideration of performance by the parties of the mutual promises, covenants, and conditions herein contained, the parties hereto agree as follows: AGREEMENT 1. Consultant's Services. 1.1. Scope and Level of Services. Subject to the terms and conditions set forth in this Agreement, City hereby engages Consultant to perform the construction management services ( "Services ") set forth in Exhibit A, which is hereby incorporated by this reference. Such services shall include, without limitation: 1.1.1. Providing pre - construction services for the project including: performing a constructability review; preparing an independent construction cost estimate and CPM schedule; and assisting in the bidding of the project and selection of the General Contractor; 1.1.2. Providing construction services for the project including: conducting the pre - construction meeting; performing daily site inspections; providing deputy inspection and materials testing services; receiving, reviewing, and processing requests for information, submittals, change order requests, and monthly pay applications; conducting weekly progress meetings; photographing and maintaining a photographic record of the site; and enforcing public funding requirements; and 1.1.3. Providing post construction services including: developing and monitoring a project punch list; receiving and verifying all required warranty and maintenance documentation, receiving and verifying all required lien releases; and receiving, reviewing, and processing the final pay application. 1.2. Time for Performance. Consultant shall perform all services under this Agreement on a timely, regular basis consistent with industry standards for professional skill and care. Services shall be provided so as not to cause undue delay of the project during the design and construction phases of the project. 2of14 57296- 0200 \1067636v4.doc . • 1.3. Standard of Care. As a material inducement to City to enter into this Agreement, Consultant hereby represents that it has the experience necessary to undertake the services to be provided. In light of such status and experience, Consultant hereby covenants that it shall follow the customary professional standards in performing all services. 1.4. Familiarity with Services. By executing this Agreement, Consultant represents that, to the extent required by the standard of practice, Consultant (a) has investigated and considered the scope of services to be performed, (b) has carefully considered how the services should be performed, and (c) understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. Consultant represents that Consultant, to the extent required by the standard of practice, has investigated the subject site and is reasonably acquainted with the conditions therein. Should Consultant discover any latent or unknown conditions, which will materially affect the performance of services, Consultant shall immediately inform City of such fact and shall not proceed except at Consultant's risk until written instructions are received from the City Representative. 2. Term of Agreement. This Agreement is effective as of July 14, 2008 (the "Effective Date "), and shall remain in full force and effect until Consultant has rendered the services required by this Agreement, unless sooner terminated as provided in Section 13 herein. 3. Compensation and Expense Reimbursement. 3.1. Compensation. City shall compensate Consultant at its standard hourly rates set forth in Exhibit B for the services provided pursuant to Section 1 of this Agreement. In no event shall the City pay Consultant more than the total sum of $416,000.00 unless additional services are provided pursuant to Section 3.2. City shall not withhold any federal, state or other taxes, or other deductions. 3.2. Additional Services. City shall not pay Consultant for additional services unless the City Representative authorizes, in advance, such services. City shall compensate Consultant for any authorized extra services at the hourly rates set forth in Exhibit B. 4. Representatives. 4.1. City Representative. For the purposes of this Agreement, the contract administrator and City's representative shall be the Director of Public Works, or such other person as the Director designates in writing (hereinafter the "City Representative "). It shall be Consultant's responsibility to assure that the City Representative is kept informed of the progress of the performance of the services, and Consultant shall refer any decisions that must be made by City to the City Representative. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the City Representative. 4.2. Consultant Representative. For the purposes of this Agreement, Thomas A. Broz, P.E. is hereby designated as the principal and representative of Consultant authorized to act in its behalf with respect to the services specified herein and make all decisions in connection therewith (the "Responsible Principal "). It is expressly understood that the experience, knowledge, capability, and reputation of the Responsible Principal were a substantial inducement for City to enter into this Agreement. Therefore, the Responsible Principal shall be responsible 3 of 14 57296- 0200 \I067636v4.doc • 1 during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. Consultant may not change the Responsible Principal without the prior written approval of City, which approval shall not be unreasonably withheld. 5. Consultant's Personnel. 5.1. All Services shall be performed by Consultant or under Consultant's direct supervision, and all personnel shall possess the qualifications, permits, and licenses required by State and local law to perform such Services, including, without limitation, a City of Seal Beach business license as required by the Seal Beach Municipal Code. Consultant personnel shall be those designated on Exhibit C. 5.2. Consultant shall be solely responsible for the satisfactory work performance of all personnel engaged in performing the Services and compliance with the standard of care set forth in Section 6 below. 5.3. Consultant shall be responsible for payment of all employees' and subconsultants' wages and benefits, and shall comply with all requirements pertaining to employer's liability, workers' compensation, unemployment insurance, and Social Security. 5.4. Consultant shall indemnify and hold harmless City and its elected officials, officers and employees, servants, designated volunteers, and agents serving as independent contractors in the role of city or agency officials, from any and all liability, damages, claims, costs and expenses of any nature to the extent arising from Consultant's alleged violations of personnel practices. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant's failure to promptly pay to City any reimbursement or indemnification arising under this Section 5. 6. Standard of Performance. Consultant shall perform all services to customary professional standards and in a manner reasonably satisfactory to City. 7. Status as Independent Contractor. Consultant is, and shall at all times remain as to City, a wholly independent contractor. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act as an agent of City. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant's employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its officers, agents or employees are in any manner employees of City. Consultant shall pay all required taxes on amounts paid to Consultant under this Agreement, and to indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant shall fully comply with the workers' compensation law regarding Consultant and Consultant's employees. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with applicable workers' compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of 4of14 57296- 0200 \1067636v4.doc • • Consultant's failure to promptly pay to City any reimbursement or indemnification arising under this Section 7. 8. Confidentiality. Consultant may have access to financial, accounting, statistical, and personnel data of individuals and City employees. Consultant covenants that all data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written authorization by City. City shall grant such authorization if applicable law requires disclosure. All City data shall be returned to City upon the termination of this Agreement. Consultant's covenant under this section shall survive the termination of this Agreement. 9. Conflict of Interest. 9.1.1. Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the Services, or which would conflict in any manner with the performance of the Services. Consultant further covenants that, in performance of this Agreement, no person having any such interest shall be employed by it. Furthermore, Consultant shall avoid the appearance of having any interest, which would conflict in any manner with the performance of the Services. Consultant shall not accept any employment or representation during the term of this Agreement which is or may likely make Consultant "financially interested" (as provided in California Government Code § §1090 and 87100) in any decision made by City on any matter in connection with which Consultant has been retained. 9.1.2. Consultant further represents that it has not employed or retained any person or entity, other than a bona fide employee working exclusively for Consultant, to solicit or obtain this Agreement. Nor has Consultant paid or agreed to pay any person or entity, other than a bona fide employee working exclusively for Consultant, any fee, commission, gift, percentage, or any other consideration contingent upon the execution of this Agreement. Upon any breach or violation of this warranty, City shall have the right, at its sole and absolute discretion, to terminate this Agreement without further liability, or to deduct from any sums payable to Consultant hereunder the full amount or value of any such fee, commission, percentage or gift. 9.1.3. Consultant has no knowledge that any officer or employee of City has any interest, whether contractual, noncontractual, financial, proprietary, or otherwise, in this transaction or in the business of Consultant, and that if any such interest comes to the knowledge of Consultant at any time during the term of this Agreement, Consultant shall immediately make a complete, written disclosure of such interest to City, even if such interest would not be deemed a prohibited "conflict of interest" under applicable laws as described in this subsection. 10. Indemnification. 10.1. Indemnity for Design Professional Services. In connection with its design professional services, Consultant shall defend, hold harmless and indemnify City, and its elected officials, officers, employees, servants, designated volunteers, and those City agents serving as 5of14 57296- 0200\1067636v4.doc • • independent contractors in the role of city or agency officials (collectively, "Indemnitees "), with respect to any and all claims, demands, damages, liabilities, losses, costs or expenses (collectively, "Claims" hereinafter), including but not limited to Claims relating to death or injury to any person and injury to any property, to the extent to which they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant or any of its officers, employees, subcontractors, or agents in the performance of its design professional services under this Agreement, but not to the extent the result of the negligence or willful misconduct of the City or of other third parties not under the control or the supervision of Consultant.. Consultant's obligation to defend pursuant to this Section shall apply independent of any prior, concurrent or subsequent misconduct, negligent acts, errors or omissions of Indemnitees. Consultant shall defend Indemnitees in any action or actions filed in connection with any of said claims with counsel of Consultant's choice, subject to City's reasonable approval, and shall pay all costs and expenses, including all attorneys' fees actually incurred in connection with such defense, provided that in the event that any damages are determined by the court to have been caused in part by persons or entities other than Consultant, Consultant's obligation hereunder shall be in proportion to Consultant's share of fault. 10.2. Other Indemnities. In connection with all Claims not covered by Section 10.1, Consultant shall defend, hold harmless and indemnify the Indemnitees with respect to any and all Claims including but not limited to Claims relating to death or injury to any person and injury to any property, which arise out of, pertain to, or relate to the acts or omissions of Consultant or any of its officers, employees, subcontractors, or agents in the performance of this Agreement. Consultant shall defend Indemnitees in any action or actions filed in connection with any such Claims with counsel of Consultant's choice, subject to City's reasonable approval, and shall pay all costs and expenses, including all attorneys' fees and experts' costs actually incurred in connection with such defense. Consultant's duty to defend pursuant to this Section shall apply independent of any prior, concurrent or subsequent misconduct, negligent acts, errors, or omissions of Indemnitees. 10.3. Acknowledgment of Indemnity Duties. By affixing his or her initials below, each party representative hereby acknowledges that the representative has read and accepted the provisions set forth in this Section 10. 14B City Consultant Consultant 10.4. Nonwaiver of Rights. Indemnitees do not, and shall not, waive any rights that they may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. ' 10.5. Waiver of Right of Subrogation. Consultant, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation against the Indemnitees, while acting within the scope of their duties, from all claims, losses, and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor. 6of14 57296- 0200 \I067636v4.doc • • 10.6. Survival. The provisions of this Section 10 shall survive the termination of the Agreement and are in addition to any other rights or remedies that Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee's right to recover under this indemnity provision, and an entry of judgment against an Consultant shall be conclusive in favor of the Indemnitee's right to recover under this indemnity provision. 11. Insurance. 11.1. Liability Insurance. Consultant shall procure and maintain in full force and effect for the duration of this Agreement insurance against claims for injuries to persons or damages to property and professional negligence which may arise from or in connection with the performance of the services hereunder by Consultant, and its agents, representatives, employees and subconsultants. 11.2. Minimum Scope of Insurance. Unless otherwise approved by City, coverage shall be at least as broad as: Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001). Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). Worker's Compensation insurance as required by the State of California and Employer's Liability Insurance. Professional Liability insurance. Consultant shall provide to City the standard form issued by the carrier. 11.3. Minimum Limits of Insurance. Consultant shall maintain limits no less than: General Liability: $1,000,000 per occurrence and in the aggregate for bodily injury, personal injury and property damage. Commercial General Liability Insurance or other form with a general aggregate limit shall apply separately to this Agreement or the general limit shall be twice the required occurrence limit. Automobile Liability: $1,000,000 per accident for bodily injury and property damage. Employer's Liability: $1,000,000 per accident and in the aggregate for bodily injury or disease and Workers' Compensation Insurance in the amount required by law. 7 of 14 57296- 0200\1067636v4.doc • • Professional Liability: $1,000,000 per claim/aggregate. 11.4. Deductibles and Self- Insured Retentions. Consultant shall inform City of any deductibles or self - insured retentions except with respect to professional liability insurance. 11.5. Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 11.5.1. City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of city or agency officials, are to be covered as additional insureds as respects: liability arising out of activities performed by or on behalf of Consultant; products and completed operations of Consultant; premises owned, occupied or used by Consultant; or automobiles owned, leased, hired or borrowed by Consultant. The coverage shall contain no limitations on the scope of protection afforded to City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of city or agency officials which are not also limitations applicable to the named insured. 11.5.2. For any claims related to this Agreement, Consultant's insurance coverage shall be primary insurance as respects City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of city or agency officials. Any insurance or self - insurance maintained by City, their officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of city or agency officials shall be excess of Consultant's insurance and shall not contribute with it. 11.5.3. Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 11.5.4. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled or materially modified except after 30 days prior written notice by first class mail has been given to City, or 10 days prior written notice by express ovemight mail if cancellation is due to nonpayment of premiums. 11.5.5. Each insurance policy, except for the professional liability policy, required by this clause shall expressly waive the insurer's right of subrogation against City and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of city or agency officials. 11.6. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII unless waived in writing by City's Risk Manager. 11.7. Verification of Coverage. All insurance coverages shall be confirmed by execution of endorsements on forms approved by the City. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be received and approved by City before services commence. As an alternative to City forms, Consultant's insurer may provide complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications. 8of14 57296- 0200 \1067636v4.doc • • 11.8. Subconsultants. Consultant shall include all subconsultants as insureds under its policies or shall furnish separate certificates and endorsements for each subconsultant. All coverages for subconsultants shall be subject to all of the requirements stated herein unless otherwise approved in advance in writing by City. 12. Cooperation. In the event any claim or action is brought against City relating to Consultant's performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation that City might require. City shall compensate Consultant for any litigation support services in an amount to be mutually agreed upon by the parties. 13. Termination. Either party shall have the right to terminate this Agreement at any time for any reason on written notice to the other party. In the event either party exercises its right to terminate this Agreement, City shall pay Consultant for any services rendered prior to the effective date of the termination. Consultant shall have no other claim against City by reason of such termination, including any claim for compensation. 14. Suspension. City may, in writing, order Consultant to suspend all or any part of the Consultant's Services for the convenience of City or for work stoppages beyond the control of City or Consultant. Subject to the provisions of this Agreement relating to termination, a suspension of the Services does not void this Agreement. 15. Notices. Any notices, bills, invoices, or reports authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Consultant's and City's regular business hours or by facsimile before or during Consultant's regular business hours; or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses heretofore set forth in the Agreement, or to such other addresses as the parties may, from time to time, designate in writing pursuant to the provisions of this section. All notices shall be addressed as follows: If to City: City Clerk City of Seal Beach 211 8th Street Seal Beach, California 90740 Fax: (562) 493 -9857 With a copy to: Public Works Director City of Seal Beach 211 8th Street Seal Beach, California 90740 9of14 57296- 0200 \1067636v4.doc • • If to Consultant: Thomas A. Broz, P.E. Willdan Engineering 2401 East Katella Avenue, Suite 450 Anaheim, California 92806 -6073 Fax: (714) 978-8299 16. Non Discrimination and Equal Employment Opportunity. In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or applicant for employment because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation. Consultant will take affirmative action to ensure that subconsultants and applicants are employed, and that employees are treated during employment, without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation. 17. Non - Assignability; Subcontracting. Consultant shall not assign, transfer, or subcontract any interest in this Agreement or the performance of any of Consultant's obligations hereunder. Any attempt by Consultant to so assign, transfer, or subcontract any rights, duties, or obligations arising hereunder shall be null, void and of no effect. 18. Compliance with Laws. Consultant shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Consultant performs the Services. 19. Non - Waiver of Terms, Rights and Remedies. Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. 20. Attorneys' Fees. In the event that either party to this Agreement shall commence any legal action or proceeding to enforce or interpret the provisions of this Agreement, the prevailing party in such action or proceeding shall be entitled to recover its costs of suit, including attorneys' fees actually incurred in connection with such enforcement or interpretation. 21. Exhibits; Precedence. All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, including but not limited to the Consultant's Proposal dated February 4, 2008 and attached hereto as Exhibit A, the provisions of this Agreement shall prevail. 22. Construction. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for 10 of 14 57296- 0200\1067636v4.doc • interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 23. Entire Agreement. This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between Consultant and City. This Agreement supersedes all prior oral or written negotiations, representations, or agreements. This Agreement may not be amended, nor any provision or breach hereof waived, except in a writing signed by the parties which expressly refers to this Agreement. IN WITNESS WHEREOF, the parties, through their respective authorized representatives, have executed this Agreement as of the date first written above. CITY OF SEAL BEACH WILLDAN ENGINEERING By: ®' By: David Carmany, ity Manager Name: Dave Hunt Title: Preside, Attest: / By: LLI�. By: 44 1 Name: Thomas A. Broz Linda Devine, City Clerk Title: Senior Vice President Approved • to Form: (Two signatures required for corporations �/ under California Corporations Code § 313) By: //' i .�I✓.. Quinn Barrow, City Attorney 11 of 14 57296- 0200 \1067636v4.doc • • EXHIBIT A Consultant's Proposal Dated February 4, 2008 (Including Scope of Services) 12 S7296-0200\1 067636v4.doc • • EXHIBIT A Scope Of Services (Includes Project Inspector) As Construction Manager for the City of Seal Beach for the construction of a replacement fire station for Fire Station 48, Willdan's Program and Construction Management Services Group staff will act as the City's authorized agent to ensure that the fire station is: • Constructed in conformance with the construction documents and all applicable codes and regulations • Completed within the contractual time requirements • Completed within budget In addition to ensuring that these three prime goals are achieved, Willdan's Program and Construction Management Services Group staff will have the additional goal of creating and maintaining a complete "documentation trail" for activities that occur during the construction of the project. Construction Management Services can be summarized in four words: coordination, review, tracking, and reporting. Willdan's Program and Construction Management Services Group will coordinate the efforts of the General Contractor in constructing the project, the efforts of the City in accepting the construction and paying for it, and the efforts of the City in permitting and approving the construction. Willdan's Program and Construction Management Services Group staff will review all the work as it is constructed and all supporting documentation which establishes the technical adequacy of the construction, the schedule of implementation and the cost of implementation. Willdan's Program and Construction Management Services Group staff will track the progress of construction and submittals, and reviews and resolution of all technical data and issues. Willdan's Program and Construction Management Services Group staff will report to the City on the progress of construction and all technical and economic parameters of the project. In order to facilitate coordinating, reviewing, tracking, and reporting, the computer is extensively used by Willdan's Program and Construction Management Services Group staff. In using the computer as a helpful tool in providing construction management services, Willdan's Program and Construction Management Services Group staff utilizes the Microsoft Office suite of software. All Daily Reports, Meeting Minutes, and correspondence are generated as Word documents. All cost estimates, punchlists, and any other spreadsheet type of document are generated as Excel documents. All data that is tracked requiring development of logs, including Requests for Information (RFI), submittals, Non-Conformance Reports (NCR), Change Orders, etc., are tracked using Access software. Should the City desire, Willdan's Program and Construction Management Services Group staff can utilize Expedition software for document tracking purposes. In both cases, Willdan's Program and Construction Management Services Group staff will maintain a scanned document database of every document sent or received for ready access, expedited processing, and rapid communication. Additionally, Willdan's Program and Construction Management Services Group staff can establish a project website either hosted A - 1 • • as part of the City's website, Willdan's website, or a third-party website. This website can be used for both updating the general public as to the progress of the project and for internally maintaining and providing access to all project documentation. Construction Management Tasks In order to achieve and document the achievement of the goals of QUALITY, SCHEDULE and BUDGET, a systematic set of tasks will be performed by Willdan's Program and Construction Management Services Group staff. The following is a description of those tasks and the approximate sequential order in which they will occur. 1. Review of Construction Documents: Willdan's Program and Construction Management Services Group staff will review the Architectural/ Engineering (NE) team's construction documents for constructability issues. These reviews will focus on interdisciplinary coordination, practicality and ease of required construction, and cost effectiveness of design (value engineering). This review will occur twice, initially when the Construction Documents are 75% completed and then when the the Construction Documents are 95% completed. 2. Confirmation of Cost Estimates: At the various design completion stages, the NE team is required to submit an "Engineer's Estimate" of the construction cost for the reconstructed fire station. Willdan's program and Construction Management Services Group staff will review these"Engineering Estimate" for accuracy and appropriateness. This review will occur twice, initially when the Construction Documents are 75% completed and then when the the Construction Documents are 95% completed. As part of this review, Willdan's Program and Construction Management Services Group staff will develop an independent cost estimate which will be compared to the NE team's estimate. 3. Development of Project Construction CPM Schedule: Willdan's Program and Construction Management Services Group staff will develop a detailed project construction CPM schedule for the reconstructed fire station. The CPM schedule will be developed based upon the construction documents and will be prepared when the Construction Documents are complete. The main purpose for developing this schedule will be to have a schedule to compare the General Contractor's planned schedule to thus establish the validity of his schedule. Additionally, the schedule will be used to assess what impacts will occur when on the surrounding community and the Whittier Civic Center Complex as a result of the construction activities. 4. Support of the General Contractor Selection Process: Willdan's Program and Construction Management Services Group staff can support the City in the selection of the General Contractor to build the replacement fire station. Willdan's Program and Construction Management Services Group staff would work with the City and the A/E team to prepare the General Contractor's bidders package and, once prepared, assist in conducting the pre-bid meeting, perform a review of the bids to confirm that each is in conformance with the Request for Bid requirements, prepare a recommendation to the City for award, and conduct a pre-award meeting with the apparent lowest, responsive bidder. A - 2 5. Pre-Construction Meeting: With the notification by the City to the General Contractor to proceed with construction, Willdan's Program and Construction Management Services Group staff will arrange to and conduct a pre-construction meeting. In attendance at this meeting, in addition to the General Contractor and Willdan's Program and Construction Management Services Group staff, will be representatives of the City and any other entities deemed necessary by the City or Willdan's Program and Construction Management Services Group staff The purpose of this meeting is to a) review the project protocol and procedures that will be followed; b) review the contracted scope of work to ensure that the General Contractor understands it; c) verify that all required bonds and insurance certificates have been received from the General Contractor; d) review all inspection requirements including deputy inspection and observations by engineer-of-record; e) review the General Contractor's proposed work plan and schedule; and f) review the General Contractor's safety plan. 6. Daily Site Inspections: Once the General Contractor has started work, Willdan's Program and Construction Management Services Group staff will inspect the site and the work daily. These inspections will focus on inspecting the work being performed to ensure that the materials and their installation are in conformance with the contract drawings and specifications. These inspections will also focus on coordinating and verifying that all required deputy inspections and material testing which will be performed by Willdan are performed when required. Additionally, Willdan's Program and Construction Management Services Group staff will ensure that all required engineer-of-record observations not only occur, but also occur at the appropriate time and do not cause any delay to the project. Finally, Willdan's Program and Construction Management Services Group staff will function as the Project Inspector as required per the California Building Standards Administrative Code (Part 1, Title 24, C.C.R.) Chapter 4, Article 1 Essential Services Buildings. In addition to inspecting the work, Willdan's Program and Construction Management Services Group staff will review the site for conformance with the General Contractor's safety plan and for site cleanliness. The results of these daily inspections will be documented in a report that will be prepared and submitted to the City. In addition to documenting on-going and complete work activities and needed and completed inspections, these reports will also document the number and type of personnel onsite, weather conditions, number and type of equipment onsite, visitors to the site, and any unusual or pertinent happenings. These reports will be submitted electronically via e-mail to the City at a minimum weekly. 7. Non-Conforming Work: During the periodic inspections conducted by Willdan's Program and Construction Management Services Group staff, any work observed that does not meet the requirements of the contract drawings or specifications will be documented via a Non- Conformance Report. These Non-Conformance Reports will be given to the General Contractor and a copy provided to the City. Willdan's Program and Construction Management Services Group staff will maintain a log of the Non-Conformance Reports. This log will document the non-conformance report number, the nature of the non- conformance, the date the report was issued, the resolution and the date of the resolution. 8. Requests for Information: During the course of the work, it is inevitable that the General Contractor will require clarification as to the intent or specific details on the contract drawings. In order to obtain this clarification, the General Contractor's subcontractors will issue an RFI. Willdan's Program and Construction Management Services Group staff will A - 3 • • typically allow the General Contractor to utilize its own RFI form. This form will have a sequential number, an issuance date, an area for identifying/ describing the required clarification/information, an area for the answer and a required date. These forms will be submitted by the General Contractor to Willdan's Program and Construction Management Services Group staff. Willdan's Program and Construction Management Services Group staff will forward them to the A/E team after reviewing the RFI for clarity and understanding. If the information required pertains to one of the A/E team's subconsultants, Willdan's Program and Construction Management Services Group staff will forward a copy of the RFI to the subconsultant in parallel with forwarding a copy to the A/E team. When the response to the RFI is received back from the A/E team, Willdan's Program and Construction Management Services Group staff will review the response for clarity and understanding before forwarding it on to the General Contractor. Willdan's Program and Construction Management Services Group staff will maintain an RFI Log. This log will document the RFI number, the nature of the RFI, the date the RFI was issued, the date it was forwarded to review, who the reviewer was, the response to the RFI, the date it was received back from the reviewer and the date it was forwarded to the General Contractor. 9. Submittals: The contract specifications will require the General Contractor to provide submittals consisting of technical data sheets and/or shop drawings for specific components/materials being installed. These submittals will be reviewed by the A/E team. At the start of the project, Willdan's Program and Construction Management Services Group staff will request that both the General Contractor and the A/E team prepare a summary list of all submittals required. This required list of submittals will then be reviewed by the General Contractor, the A/E team, the City and Willdan's Program and Construction Management Services Group staff in order to reach agreement on exactly what the General Contractor needs to submit. During the course of the project, the General Contractor will submit all submittals to Willdan's Program and Construction Management Services Group staff who will review each submittal for completeness before forwarding it to the A/E team. As with RFIs, Willdan's Program and Construction Management Services Group staff will maintain a Submittal Log. This log will document the submittal number, the nature of the submittal, the date the submittal was issued, the date it was forwarded to the reviewer. who the reviewer is, the disposition of the submittal, the date it was received back from the reviewer, and the date it was forwarded to the General Contractor. 10. Communications: During the course of the project, various forms of communication will occur—written, electronic (e-mail), or verbal (telephone calls). Willdan's Program and Construction Management Services Group staff will strive to have all communications between the General Contractor and the City and any other entity flow through it. All communications will be documented (telephone calls by notes and e-mails by hard copy printouts) and filed. If desired by the City, copies of all communications will be provided to the City. If the level of communication warrants, or if the City so desires, logs of all communications will be maintained. 11. Weekly Progress Meetings: A weekly progress meeting will be conducted with the General Contractor. Additionally, the City will be anticipated to attend each of these meetings with the A/E team attending when needed. These meetings will be held at a fixed time and day of the week. The meetings will review the work completed in the past week and look ahead at A - 4 • • the work planned for the next two weeks. All key issues affecting the work will be discussed. The Non-Conformance, RFI and Submittal Logs will be reviewed. Any coordination issues with the City or any other outside agency will be discussed. Detailed notes of the meetings will be taken and documented and provided to all attendees prior to the next meeting. 12. Progress Photographs: Digital photographs documenting all key areas of construction will be taken weekly. The digital images will be stored both electronically and in hard copy. Selected photographs from the total taken during each month will be included in the monthly report. 13. General Contractor Monthly Pay Application: Monthly, the General Contractor will prepare its Application for Payment on either the City's standard form, the AIA standard form, or the General Contractor's form as directed at the beginning of the project by the City. The application will be based on the General Contractor's claimed percentage complete for each schedule value in the Schedule of Values contained in their contract. The General Contractor will submit its monthly pay applications to Willdan's Program and Construction Management Services Group staff Willdan's Program and Construction Management Services Group staff will review the application and if in disagreement with the General Contractor with the percent complete of any schedule value, will attempt to resolve the disagreement with the General Contractor. Once agreement is reached or agreement to disagree, Willdan's Program and Construction Management Services Group staff will forward his recommendations for approval of the Application for Payment to the City. Willdan's Program and Construction Management Services Group staff will, additionally, ensure that included with the Application for Payment will be Conditional Waivers and Releases of Lien Upon Progress Payment for the General Contractor and all appropriate subcontractors for that Application for Payment and Unconditional Waivers and Releases of Lien Upon Progress Payment for the General Contractor and all appropriate subcontractors for the previous Application for Payment. 14. Change Orders: During the course of the project, it is inevitable that the General Contractor will request Change Orders to their contract. The General Contractor will prepare the Request for Change Order and submit it to Willdan's Program and Construction Management Services Group staff At the Pre-Construction Meeting, the format of the request and the required backup will be discussed. The General Contractor will be expected to provide as detailed backup as necessary to justify the change, including a breakout of all quantities, material prices, labor hours, labor rates, overhead and profit markups, and any impact on general conditions and schedule. Willdan's Program and Construction Management Services Group staff will review the Request for Change Order. If, after this review, Willdan's Program and Construction Management Services Group staff do not agree with the Request, Willdan's Program and Construction Management Services Group staff will negotiate with the General Contractor until agreement is reached. At that time, Willdan's Program and Construction Management Services Group staff will meet with the City to present the Request for Change Order. If all parties are in agreement to the appropriateness of the change order, Willdan's Program and Construction Management Services Group staff will prepare a Recommendation for Approval for the Change Order. Depending on the form of A - 5 • • contract used, Willdan's Program and Construction Management Services Group staff will either prepare or assist the City in preparing the actual Change Order. As with RFIs and submittals, Willdan's Program and Construction Management Services Group staff will maintain a Change Order Log. This log will document the Change Order number, the nature of the change order, the value of the change order, the date the request was received from the General Contractor and the disposition. This log will also include all identified potential change orders. 15. Public Funding Requirements: The proposed replacement fire station will be constructed with public funds, and thus will require some special requirements to be imposed on the General Contractor and all its subcontractors. The General Contractor and all its subcontractors will be obligated to pay "prevailing" wages to all who perform services on the project and they also will be obligated to employ individuals who have a composite racial and ethnic makeup equal to that of the general population. In order to ensure that this is occurring, Willdan's Program and Construction Management Services Group staff will perform several tasks: A. Review the General Contractor's specifications with regards to Labor Compliance. B. Review with and advise the General Contractor at the pre-construction meetings of the Labor Compliance requirements. C. Review the General Contractor's submittals including certified payrolls, statements of compliance, fringe benefits, employer contributions, and monthly manpower utilization reports for compliance. If any discrepancies are noted in any of these submittals, the General Contractor will be notified in writing and resolution of these discrepancies will be tracked. D. Perform jobsite employee interviews to verify that the employees are aware of the "prevailing" wage requirements for the project and that they are receiving such wages. 16. As-Built Drawings: The General Contractor's contract with the City will require him to "red-line" a set of drawings in order to "as-built" them. Willdan's Program and Construction Management Services Group staff will periodically review the General Contractor's "as- built" drawings to verify that they have "red-lined" all field changes/discrepancies. 17. Project Close-Out: Willdan's Program and Construction Management Services Group stall recognizes that Project Close-out is not a simple thing. Project Close-out requires a methodical step-by-step review of all completed work and submitted documentation. Project Close-out initiates when the General Contractor indicates he is prepared to start close-out procedures. The first focus is on the work completed. Willdan's Program and Construction Management Services Group staff, in conjunction with the A/E team, the City and the General Contractor, will conduct a walkdown at the "completed" site in order to establish a "punch list". Willdan's Program and Construction Management Services Group staff will then monitor the General Contractor's progress in working off the "punch list". Once the "punch list" has been completed, a final walkdown with the same parties will be conducted to agree on final acceptance of the work. Willdan's Program and Construction Management A - 6 Services Group staff will coordinate with the A/E team and the City to obtain and file whatever Certificates of Substantial Completion are required, along with final inspection signoffs. Willdan's Program and Construction Management Services Group staff will also monitor and track the General Contractor's submittal of all required maintenance manuals and warranties and coordinate their review and acceptance by the A/E team. At total project completion, Willdan's Program and Construction Management Services Group staff will obtain all required Unconditional Final Lien Waivers from the General Contractor and his subcontractors, as well as Final Labor Summary and Final Labor Certificate as part of the Review and Recommendation for Final Application for Payment. Quality Control Willdan's Program and Construction Management Services Group staff, as Construction Manager, will achieve Quality Control on this project through a diligent review, inspection and testing of all work and documentation. Quality Control will start first with the Pre-Construction Meeting, where the scope of the project will be reviewed with the General Contractor and it will be impressed upon them the requirements of the contract documents and how they must be adhered to. Once work starts at the site the next step in the Quality Control process will be verifying that material and components being installed are those as specified. This will first be verified by review of the submittal information by the A/E team. Once the material and components arrive onsite, Willdan's Program and Construction Management Services Group staff will spot-check these materials and components, as well as test as required, to verify they match that called for on the submittal material. Budget Control Budget control can be a real problem if a systematic review of costs is not started at the very start of the project—the initial planning phase. It is very important to establish a realistic initial budget for a project. The initial budget should take into account not only realistic hard costs (construction costs), but also the soft costs associated with each project. Soft costs include all consulting fees; all permitting fees; all furniture, fixtures, and equipment costs; all moving costs; all data/telecommunications systems and installation costs, etc. Initial estimates of construction costs should be based not just on general square footage costs by proposed facility square footage, but should also include a thorough review of the proposed site and any unique site characteristics which could affect the ultimate construction costs. It has been Willdan's Program and Construction Management Services Group staffs experience that for the vast majority of projects, budgets have not been met because initially established budgets were not realistic. If a realistic budget is established, taking into account all hard and soft costs, including contingency allowances, there is a good chance of achieving the proposed budget. Once a realistic project budget has been established, then all actual incurred costs can be monitored and tracked against the budget. This starts with the initial design for the project. The A/E team must be given a construction budget for the design. At the various stages of design completion(schematic, design development, and construction documents), cost estimates of the project should be prepared based on the design documents. These estimates are then compared against the original budget. If the estimates exceed this original budget, the design can be A - 7 • • modified to conform to the budget or a conscious decision by the City to increase the budget can be made. With the design 100% complete and verification that design meets the construction budget, budget control should not be a problem. In the real world this unfortunately is not true. Change orders are a fact of construction, but with a well-managed project, change orders can be minimized and taken into account in the overall budget via contingency allowances. During the later part of design phases of the project, Willdan's Program and Construction Management Services Group staff will be performing independent reviews of the construction documents. If Willdan's Program and Construction Management Services Group staff finds anything during these reviews that could lead to a potential change order, Willdan's Program and Construction Management Services Group staff will bring it to the attention of the City and the A/E team. Should any potential change order be identified by Willdan's Program and Construction Management Services Group staff prior to the General Contractor bidding of the project, the A/E team and the City will be notified such that the A/E team can correct the construction documents to eliminate the potential problem. Should any potential change order be identified by Willdan's Program and Construction Management Services Group staff after the General Contractor bidding has been completed but prior to the General Contractor start of construction, Willdan's Program and Construction Management Services Group staff will take the "offensive" and immediately initiate negotiations with the General Contractor after developing a fair market estimate to the potential change order cost. Another area which possesses the potential for change orders is scope growth. The design must be frozen or a conscious decision made by the City to change scope. Willdan's Program and Construction Management Services Group staff will be firm in insisting on a "design freeze." The final area which poses the potential for change orders is unforeseen conditions. This area is difficult to control,but having an experienced staff that have dealt with numerous unforeseen conditions allows us to be looking at all times to uncover any unforeseen conditions and identify and deal with them as quickly as possible. Schedule Control "Cradle-to-grave" project schedules have three major phases: the planning phase, the design phase, and the construction phase. It has been the experience of Willdan's Program and Construction Management Services Group staff that once a project has obtained its planning approvals and its design has been completed, the schedule for the actual construction of the project is the easiest phase of the overall project schedule to control and meet, pending any unforeseen conditions. The planning phase and design phase schedules are the most difficult to meet. In the planning phase, the reaction of the surrounding community can have a significant impact on the duration of the planning approval process. During the design phase, particularly when the owner is a public agency, obtaining agreement on the design from all agency departments who have a vested interest can be very time-consuming and take unanticipated durations of time to obtain. Once the design is completed and the construction schedule duration has been pre-established by the City, during the negotiation of the General Contractor's contract, the General Contractor will have the opportunity to agree on a schedule with the City. Once the contract is signed, the project schedule is "cast-in-concrete" and the only thing that can change it is a change order. A - 8 Having a change order that increases work scope and thus contract value does not automatically mean a change in construction schedule duration. As a preemptive effort prior to starting any work at the site, Willdan's Program and Construction Management Services Group staff will review the General Contractor's construction schedule to see if it is realistic and achievable. If Willdan's Program and Construction Management Services Group staff has any concerns with the General Contractor's schedule, they will be addressed and resolved prior to starting any construction. In general, only change orders that address any work on the "critical path" have the potential to have an impact on schedule. As with budget control, a proactive approach on construction schedule control on Willdan's Program and Construction Management Services Group staff's part will help to ensure meeting the City's schedule requirement. A - 9 • • EXHIBIT B Fee Schedule and Standard Billing Rates 13 57296-0200\1067636v4.doc • EXHIBIT B Fee Schedule and Standard Billing Rates (Includes Project Inspector) Based on the Scope of Work contained in Exhibit A and Willdan's standard hourly rates contained within following are Willdan's not-to-exceed fees, broken down by the project phase: Phase I — Pre-Construction Phase Perform constructability review of 75% and 95% Design Drawings Project Director 40 hours x$180 $ 7,200 Project Construction Manager 40 hours x $145 5,800 Prepare construction cost estimate of 75% Design Drawings and Update at 95% Drawings Project Director 10 hours x $180 1,800 Project Cost Engineer 90 hours x $140 12,600 Prepare independent CPM Schedule Project Director 5 hours x $180 900 Project Construction Manager 10 hours x $145 1,450 Project Scheduler 40 hours x $140 5,600 Assist in preparation of bid package Project Director 5 hours x $180 900 Project Construction Manager 10 hours x $145 1,450 Assist in General Contractor bidding, selection, and award Project Director 10 hours x $180 1,800 Project Construction Manager 10 hours x $145 1,450 Conduct Pre-Construction Meeting Project Director 4 hours x $180 720 Project Construction Manager 8 hours x $145 1,160 Pre-Construction Phase Total $42,830 Phase II—Construction Phase (13 months) Project Director 56 weeks x 4 hours x $180 $ 40,320 Project Construction Manager 56 weeks x 20 hours x $145 121,800 Project Inspector 56 weeks x 10 hours x $110 61,600 Project Cost Engineer 56 weeks x 2 hours x $140 15,680 Project Scheduler 56 weeks x 2 hours x$140 15,680 Construction Phase Total $255,080 B-1 • • Phase III —Project Closeout Phase (1 month) Project Director 4 weeks x 4 hours x $180 $ 2,880 Project Construction Manager 4 weeks x 20 hours x $145 11,600 Project Closeout Phase Total $14,480 Phase IV—Project Warranty Inspections Phase (1 month) Project Director 4 weeks x 2 hours x $180 $ 1,440 Project Closeout Phase Total $1,440 Deputy Inspection and Materials Testing Allowance based on 1.5% of estimated construction costs of$6,000,000 $90,000 Reimbursable Costs Reproduction, Postage Delivery Costs, Mileage, etc. $4,730 Willdan 15% Mark-up of Subconsultant Costs $7,440 ESTIMATED TOTAL NOT-TO-EXCEED COSTS $416,000 B-2 • • "I- WILLDAN ro "°'°g L4_4+{ Engineering reach Schedule of Hourly Rates Effective July 1,2008 to June 30,2009 ' ENGINEERING ` ' . " BUIL`DING AND SAFETY Principal Engineer 8200.00 Group Manager 180.00 Group Manager 180.00 Supervising Plan Check Engineer 150.00 City Engineer 180.00 Building Official 150.00 Project Manager 180.00 Plan Check Engineer 140.00 Program Manager 180.00 Deputy Building Official 140.00 Supervising Engineer 160.00 Inspector of Record 140.00 Senior Engineer 145.00 Senior Plans Examiner 125.00 Senior Design Manager 145.00 Supervising Building Inspector 125.00 Design Manager 135.00 Plans Examiner 115.00 Associate Engineer 135.00 Senior Building Inspector 115.00 Senior Designer 130.00 Supervisor Code Enforcement 115.00 Senior Design Engineer II 130.00 Building Inspector "105,00/110.00 Senior Design Engineer I 125.00 Supervising Construction Permit Specialist 105.00 Designer II 120.00 Senior Construction Permit Specialist 100.00 Designer I 115.00 Senior Code Enforcement Officer 95.00 Design Engineer II 120.00 Assistant Building Inspector "95.00/110.00 Design Engineer I 115.00 Code Enforcement Officer 80.00 Senior Drafter 110.00 Construction Permit Specialist 80.00 Drafter II 100.00 Assistant Construction Permit Specialist 85.00 Drafter I 95.00 Plans Examiner Aide 75.00 Technical Aide 85.00 Assistant Code Enforcement Officer 70.00 CONSTRUCTION..MANAGEMENT-- % . . . - -.PLANNING . . Group Manager 180.00 Group Manager 180.00 Project Manager 180.00 Principal Planner 150.00 Senior Construction Manager 155.00 Principal Community Development Planner 150.00 Construction Manager 145.00 Senior Planner 130.00 Assistant Construction Manager 120.00 Senior Community Development Planner 130.00 Utility Coordinator 125.00 Associate Planner 115.00 Labor Compliance Manager 120.00 Associate Community Development Planner 115.00 Labor Compliance Specialist 95.00 Assistant Community Development Planner 105.00 Assistant Planner 105.00 INSPECTION SERVICES. Planning Technician 85.00 Supervising Public Works Observer 120.00 Community Development Technician 85.00 Senior Public Works Observer 110.00 Public Works Observer "100.00/110.00 ADMINISTRATIVE Assistant Public Works Observer '"100.00/110.00 Computer Data Entry 65.00 Clerical 65 00 SURVEYING . „ . Word Processing - 65.00 Group Manager 180.00 Personal Computer Time 30.00 Supervisor-Survey& Mapping 155.00 Senior Survey Analyst 130.00 Senior Calculator 120.00 Mileage reimbursement will be charged at the current Federal guideline rate Calculator II 110.00 at the time of billing. Vehicles will be charged at a monthly rate of$500.00. Calculator I 100.00 "Prevailing Wage Project,Use$105.00 Survey Analyst II 115.00 Survey Analyst I 100.00 Additional billing classifications may be added to the above listing during the Survey Party Chief 115.00 year as new positions are created.Consultation in connection with litigation Field Party(One) 165.00 and court appearances will be quoted separately. The above schedule is for Field Party (Two) 220.00 straight time.Overtime will be charged at 1.25 times,and Sundays and Field Party (Three) 275.00 holidays, 1.70 times the standard rates.Blueprinting,reproduction, messenger services,and printing will be invoiced at cost plus fifteen percent LANDSCAPE ARCHITECTURE (15%). A subconsultant management fee of fifteen percent(15%)will be Group Manager 180.00 added to the direct cost of all subconsultant services to provide for the cost of Principal Landscape Architect 150.00 administration,consultation,and coordination.Valid July 1,2008 thru June Senior Landscape Architect 125.00 30,2009,thereafter,the rates may be raised once per year to the value of Associate Landscape Architect 115.00 change of the Consumer Price Index for the Los Angeles/Orange County area,but Assistant Landscape Architect 100.00 not more than five percent per year. 13-3 • • exreoJrn WILLDAN I s Geotechnical each Fee Schedule - Personnel January 1, 2008 Accounting Cost Code 22208 TECHNICAL STAFF - ADMINISTRATIVE GEOTECHNICAL Computer Data Entry 60.00 Principal/Chief Engineer/Geologist 185.00 Clerical 60.00 Senior Geotechnical Engineer/Geologist 160.00 Word Processing 60.00 Project Engineer/Geologist 140.00 Computer Time 15.00 Senior Staff Engineer/Geologist 120.00 CAD Operator 75.00 Staff Engineer/Geologist 100.00 - -• - Sr. Soil Technician (Non-prevailing Wages) 75.00 Sr. Soil Technician (Prevailing Wages) 90.00 EXPERT WITNESS Soil Technician (Non-prevailing Wages) 65.00 Principal Engineer/Geologist 320.00 Soil Technician(Prevailing Wages) 90.00 SPECIAL INSPECTION Construction Material Engineer 130.00 Supervisor 100.00 Special Inspection(Non-Prevailing Wages) 65.00 Special Inspection (Prevailing Wages) 75.00 Concrete Test Report 10.00 Staff assignments depend on availability of personnel, site location, and the level of experience that will satisfy the technical requirements of the project and meet the prevailing standard of professional care. The above schedule is for straight time. Overtime will be charged at 1.5 times, and Sundays and holidays, 2.0 times the standard rates. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus fifteen percent (15%). A subconsultant management fee of fifteen percent (15%)will be added to the direct cost of all subconsultant services to provide for the cost of administration, consultation, and coordination. Mileage/Field Vehicle usage will be charged at the rate of$.50/mile or$5 per hour, subject to negotiation. The rates will remain firm for 120 days from the date of this submittal. B-4 • • ,..., WILLDAN I V"., Geotechnical _., Fee Schedule - Laboratory January 1, 2008 Accounting Cost Code 22208 Identification and Index Properties ,�ConstructlonMaterial Testing In-Situ Moisture and Density (ASTM D2937) 20.00 Grain Size Analysis (ASTM 0422) 6 X12 Concrete Cylinder(C39) 20.00 Sieve Only (3"to#200) 70.00 2", 4", 6" Diameter Concrete Cores (Test Only) 30.00 Sieve and Hydrometer 110.00 Mortar and Grout, Cylinder, Prism, and Cubes 30.00 Percent Passing#200 Sieve (ASTM D1140) 50.00 Reinforcing Steel, Tensile and Bend Tests 40.00 Atterberg Limits (ASTM D4318) Cylinders Pick-up 45.00 Multi Point 90.00 One Point 65.00 Unit rates presented are for routinely performed geotechnical Specific Gravity (ASTM D854) 65.00 and construction material laboratory tests. Other tests can be Sand Equivalent(ASTM D2419) 70.00 performed in our laboratory, including rock core, soil cement, and soil lime tests. Additional tests will be quoted on request. Compaction and Bearing Strength The rates will remain firm for a period of 120 days from the date of this submittal. Unit rates presented herein assume Modified Proctor Compaction (ASTM D1557) samples are uncontaminated and do not contain heavy metals, Method A or B (4" Mold) 160.00 acids, carcinogens, or volatile organic compounds that can be Method A or B (6"Mold) 185.00 measured by an OVA or PID with concentrations greater than Compaction, California 216 160.00 50 ppm. Arroyo will not accept contaminated samples. California Bearing Ratio CBR (ASTM D1883) Uncontaminated samples will be disposed of 30 days after 3 points 450.00 presentation of test results. R-Value 240.00 Shear Strength Torvane/Pocket Penetrometer 15.00 Direct Shear- per point Consolidated-Drained (ASTM D3080) 75.00 Residual 120.00 Unconfined Compression (ASTM D2166) 100.00 Unconsolidated-Undrained (UU) 135.00 Consolidation/Collapse and Swell Tests Consolidation (ASTM D2435) 8 load increments w/one time-rate 140.00 Additional load increment 20.00 Additional Time rate per load increment 40.00 Single point(collapse test) 40.00 Single Load Swell (ASTM D4546) Ring sample,field moisture 60.00 Ring sample, air dried 60.00 Remolded sample per specimen 40.00 Expansion Index (ASTM D4829/UBC 29-2) 110.00 Laboratory Permeability Constant Head (ASTM D2434) 225.00 Falling Head Flexible Wall (ASTM D5084) 275.00 Triaxial Permeability (EPA 9100) 325.00 Chemical Tests Corrosivity (pH, resistivity, sulfates, chlorides) 150.00 Organic content(ASTM D2974) 60.00 B-5 • • EXHIBIT C Consultant Personnel 14 S7296-0200\I067636v4.doc S EXHIBIT C KEY PERSONNEL The following individuals are identified as "key personnel" of the Willdan team. Position Name Firm Project Director Thomas A. Broz, P.E., S.E. Willdan Project Construction Manager Dino D'Emilia, P.E. Willdan Project Cost Engineer John E. Mauk, CPE O'Connor Construction Management Project Scheduler Sriram Ramdass, CPE O'Connor Construction Management B - 1 i 1 -. 1 r -. Client#: 6540 WILLDAN -' • • A OkD, - CERTIFICA• OF LIABILITY INSUI NCE ,oT MMj °""'- PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF • INFORMATION Dealey, Renton & Associates ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE P. O. Box 10550 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. . Santa Ana, CA 92711 70550 - - . - • .. - - 714 427. 6810 _ . - - INSURERS AFFORDING COVERAGE __. .._ INSURED c , i • INSURER A: Zurich American Insurance Co. • .. -" - - ' ' ' . ' Wilidan Engineerin I — -- - - - -- a - 9 _....___.._......_ T .. INSURER B: American Automobile Ins -- Co I:i - "' I ( )_ _i _2401 E Katella Avenue, Ste. 300 INSURER c: XL Specialty Insurance Co.. - "' 1 I Anaheim, CA 92806 • :.r. re., INSURER D: _ i • :]' I -. I INSURER E: .•.•r. r.:•! I _._______ i :COVERAGES " • THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS I TR DATF IMM/DD/YYI DATF from/norm A GENERALLIABIUTY - GL0904316303 11/09/08 11/09/09 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY FIRE DAMAGE (Any one fire) $1,000,000 CLAIMS MADE j X 1 OCCUR INDP. CONTRACTORS • MEDEXP(Any one person) s10,000 X CONTRACTUAL INCLUDED • - PERSONAL SADV INJURY $1,000,000 X BFPD, XCU - GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIM IT APPLIES PER: PRODUCTS - COMP /OP AGG $2,000,000 7 POLICY X PRO JFf.T LOC A AUTOMOBILE LIABILITY BAP904316203 11/09/08 11/09/09 COMBINED SINGLE LIMIT $1,000,000 X ANY AUTO - (Ea accident) ' ALL OWNED AUTOS BODILY INJURY • SCHEDULED AUTOS (Per person) - $ - 1 X HIRED AUTOS _ ._ _. _ .... -. 1 X NON -OWNED AUTOS ": :;f•. o.;'" G. 1 I :cc' . OPE TYO ___._ __ _ _ _ - P 1 - _ .PR R AMAGE I :`:� 1 1 iY .. i ?,:- 2 {I ' C : 1 - , ,. 11 :.. (Per accident) _ -__ $ . __ - . - _ -, { GARAGELIABIUTY• ... ' - u, 1 ^' _ i r AUTO ONLY,_ EA ACCIDENT $- _ - : - EA ACC $ AUTO ONLY: AGG $ EXCESS LIABILITY '1 - _ _ EACH OCCURRENCE - _ $ • I 7 OCCUR I CLAIMS MADE AGGREGATE $ . $ • .. DEDUCTIBLE - - -' - __..._._ -. _.. -- ... ..' - - - . - - .. _ . _ - — $ RETENTION $ $ - B• WORKERS COMPENSATION AND - WZP80967-141 . .. ... 11/09/06 11/09/09 X WCSTATU- 0TH- - - TORY7IMITS FR EMPLOYERS' LIABILITY - E.L:EACHACCIDENT $1,000,000 - E.L. DISEASE •EAEMPLOYEE $1,000,000 E.L. DISEASE - POLICY LIMIT $1,000,000 c OTHER Professional DPR9614659 11/09/08 11/09/09 $1,000,000 per claim Liability $1,000,000 annl aggr. DESCRIPTION OF OPERATIONS /LOCATIONSNEHICLES /EXCLUSIONS ADDED BY ENDORSEMENT /SPECIAL PROVISIONS General Liability policy excludes claims arising out of the performance of professional services Re: Construction management services Seal Beach Fire Station No. 48, 3131 Beverly Manor Road (See Attached Descriptions) CERTIFICATE HOLDER ADDmONALINSURED;INSURERLETTER: CANCELLATION Ten flay Nntice fnr Nnn- Payment of Premium SHOULD ANYOF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION City of Seal Beach DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL In DAYS WRITTEN City Clerk NOTICE TOTHE CERTIFICATE H OLDER NAM ED TOTHE LEFT, BUT FAILURE TO DOSOSHALL 211 8th Street IM POSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR Seal Beach, CA 90740 REPRESENTATIVES. A�RIZED RE I / 1 V w V • l'� a ,C ACORD 25-8 (7197)1 of 2 #M241865 RLL O ACORD CORPORATION 1988