Loading...
HomeMy WebLinkAboutCC AG PKT 2004-08-09 #H 0 0.,1 AGENDA REPORT DATE: August 9, 2004 TO: Honorable Mayor and City Council THRU: John B. Bahorski, City Manager FROM: Douglas A. Dancs, P.E. Director of Public Works /City Engineer SUBJECT: ACCEPTANCE OF THE ANNUAL CONCRETE REHABILITATION FY 03/04 PROJECT NO. 50178 SUMMARY OF REQUESTS: The proposed City Council action will formally accept the completion of the construction of the Annual Concrete Rehabilitation FY 03/04, Project No. 50178. BACKGROUND: The constructed project rehabilitated approximately 1500 linear feet of curb and gutter and 2000 square feet of sidewalk in the 200 and 300 block of Main Street. This project replaced portions of deteriorated concrete along the roadway, improving the drainage and standing water along the curb line. It also updated curb access ramps in an effort to reduce the backlog of concrete repairs. In addition, 260 feet of curb and gutter and 3200 square feet of sidewalk was replaced in front of the east side of Eisenhower Park. The upcoming fiscal year's project will rehabilitate the sidewalk and curb and gutter on west side of Eisenhower Park. This area was chosen because of its high pedestrian traffic, which will reduce potential situations for pedestrians. The Department's Tree Preservation Program will continue to replace damaged sidewalks with pavers adjacent to Mature trees and make repairs to other areas in the City on an ongoing basis. Currently there is a several million - dollar backlog of concrete repairs in the City as adopted in the Council five -year Capital Improvement Program. On April 26, 2004, Council elected to award the project to FS Construction and the project on Main Street was completed before Memorial Day Weekend. In accordance with the plans and specifications, the Contractor has completed the above referenced project. The final contract amount is $ 88,630.00. r', FISCAL IMPACT: Funds were available in the 2003/2004 City's Capital Improvement Program from OCTA Measure M funds and from the 1996 Countywide Revenue Bond proceeds, which includes construction and construction inspection. RECOMMENDATION: Upon motion of the consent calendar, it is recommended that the City Council: • 1. By resolution, determine the work has been completed in accordance with the contract documents and declare the work to be accepted and the total amount of the contract is in the sum of $88,630.00. 2. Direct the City Clerk, within ten (10) days from the date of acceptance, file a "Notice of Completion" with the Orange County Recorder. 3. Direct City staff, upon expiration of the thirty -five (35) days from the filing of the "Notice of Completion," to make the retention payment to FS Construction, in the amount of $8,863.00. Prepared By: Concur f Mark K. Vukojevic, P.E. iou:�A. D.,•.T. Deputy City Engineer Director of Public Works /City Engineer NOTED y D A PROV ii: W 1 i I '7 7. B horski, ty Manager 3