Loading...
HomeMy WebLinkAboutCC AG PKT 2003-04-14 #Q p AGENDA REPORT DATE Apnl 14, 2003 TO Honorable Mayor and City Council THRU John B Bahorski, City Manager FROM Douglas A Dancs, P E Director of Public Works /City Engineer SUBJECT AWARD BID FOR ANNUAL PAVING REHABILITATION FY 02/03 PROJECT NO 50099 SUMMARY OF REQUESTS The proposed action will award a construction contract for the Annual Paving Rehabilitation FY 02/03 to the lowest responsible bidder, Palp — dba Excel Paving, in the amount of $165,268 00 and authonze the City Manager to execute the agreement BACKGROUND The awarded Annual Rehabilitation FY 02/03 (Project No 50099) project will rehabilitate the pavement on College Park Drive from Harvard Lane to North Harvard Lane The work will consist of grinding the edges of pavement adjacent to the curb, applying a leveling course, placing a rubbenzed chip seal, and then placing a layer of rubberized asphalt This local street was next on the pnonty ranking list in the pavement management system as approved by Council dunng the FY 02/03 budget workshops Pnonty ranking is based upon the condition of the pavement and the amount of traffic the streets receive The plans and specifications were completed by in -house staff Asphalt oil pnces have continued to vary in the past months making it difficult to obtain accurate engmeenng estimates Therefore, the Public Works Department required contractors to provide pnces on two alternatives for the project The first base alternative, Alternative A, was the basic resurfacing without the added protection of the rubbenzed chip seal known as Asphalt Rubber Aggregate Membrane (ARAM) The second alternative, Alternative B, included the ARAM which helps extend the life of the street With the existing soil conditions in the City, the City has detennmed that the matenal helps to prevent excessive cracking and deterioration and provides a longer life to the road Staff has been successful in using this matenal on previous resurfacing jobs and is recommending the use of the alternate bid schedule for the completion of this project AGENDA ITEM 0 Two bids were received and opened by the City Clerk on Wednesday, Apnl 2, 2003 as listed below Alternative A Alternative B 1 Palp — dba Excel Paving $114,474 00 $165,268 00 2 Alliance Streetworks, Inc $124,630 00 $176,130 00 Staff has reviewed the submitted bid documents and found the low bidder to be in compliance with the contract documents FISCAL IMPACT Funds in the amount of $180,000 are currently available from the Gas Tax Fund within the City's approved 5 -year Capital Improvement Program budget to construct these improvements under Project No 50099 Unspent funds will be used for future projects RECOMMENDATION It is recommended that the City Council award the construction contract for the Annual Pavement Project to the lowest responsible bidder, Palp — dba Excel Paving, in the amount of $165,268 00 and authorize the City Manager to execute the agreement Prepared By Cone ,AI/A Ma K Vukojevic, P E Dougla' Dancs, P E Deputy City Engineer Director of Public Works /City Engineer NOTED AND APPROVED John B r: ahors , City Manager