HomeMy WebLinkAboutCC AG PKT 2003-02-10 #O • Felpnwav AGENDA REPORT ' DATE: Jan-21, 2003 ge-o TO: Honorable Mayor and City Council THRU: John B. Bahorski, City Manager FROM: Douglas A. Dancs, P.E., Director of Public Works / City Engineer SUBJECT: AUTHORIZATION TO BEGIN DESIGN AND BUDGET AMENDMENT FOR THE PIER STRUCTURAL REPAIR PROJECT No. 49715. • SUMMARY OF REQUEST: The proposed City Council action will authorize staff to initiate the design process for the Pier Structural Repair Project No. 49715 and approve the attached resolution authorizing a total budget amendment of $500,000 for the 2002/2003 fiscal year for Project No. 49715. BACKGROUND: On January 27, 2003, the City Council was presented with a condition assessment report for the Seal Beach Municipal Pier. The report concludes that the Pier is in fair condition according to the standards set by the American Society of Civil Engineers (ASCE) Standard Practice Manual on Underwater Investigations. However, several elements of the pier are in need of repair and replacement including structural components, utilities, preservation components and aesthetic features. These existing repair conditions limit the load capacity and accelerate future damage and deterioration to the Pier. Further estimates including the design, construction, inspection, and permitting estimate - the cost to make these repairs at $500,000 and a budget amendment from the undesignated general fund reserve is required for this project. Coupled with the Sand Retention Groin Project, the total budget amendment required for both projects from the undesignated general fund reserve is $767,000. If the budget amendment is not approved, deferral can be significantly more costly and current maintenance funds allocated in the budget would be insufficient. The Pier would continue to deteriorate and cause consequent damage to the structure. As an alternative to the traditional design and construction method, staff evaluated the benefits using the design -build option in the City's charter. However, a close inspection of the timeline and the repairs required indicate that design -build would not produce significant cost savings and or complete the repairs prior to the summer season. AGENDA ITEM 0 Staff is proposing to negotiate a cost to prepare plans, specifications, construction management and an annual maintenance program with the on -call consultant Han- Padron Associates. After the design is complete, staff will bring the project to City Council for the project to be bid. In order to avoid Pier construction closures and disturbances during the peak summer period, construction will be scheduled after the Labor Day Holiday. In the meantime, Public Works Maintenance Staff will continue to repair minor items on the Pier. FISCAL IMPACT: Project funds are currently unavailable within the approved 5 -year Capital Improvement Program. The total budget and budget amendment required for this project would be $500,000 from the undesignated general fund reserve. The current estimated 2002/2003 year ending undesignated general fund balance is $4,335,869. Approval of this budget amendment would reduce the undesignated general fund reserve by $500,000 to a balance to $3,835,869. Coupled with the Sand Retention Groin Repair Project, the total amount required from the undesignated general fund reserve is $767,000. RECOMMENDATION: It is recommended that the City Council authorize staff to initiate the design process for the Pier Structural Repair Project No. 49715 and approve the attached resolution , authorizing a total budget amendment of $500,000 for the 2002/2003 fiscal year for Project No. 49715. Prepared By: Revie d B r , Mark k. Vukojevic, P.E., Douglas A. Dancs, P.E., Director, Deputy City Engineer Public Works Department NI D APPRO I D: John Bahorski, City Manager •